Not sure if it's confirmed but I know that the Claridge design showroom is going in the base of the first building when it goes up.
Reply With Quote
     
     
  #222  
Old Posted Mar 4, 2022, 11:26 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,866
Quote:
Originally Posted by McDonald's Racoon View Post
Not sure if it's confirmed but I know that the Claridge design showroom is going in the base of the first building when it goes up.
So they're not building both at the same time?
Reply With Quote
     
     
  #223  
Old Posted Apr 3, 2022, 1:04 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,869
Today's Progress:
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #224  
Old Posted Apr 3, 2022, 4:24 AM
GeoNerd GeoNerd is offline
Registered User
 
Join Date: May 2010
Location: Ottawa, ON.
Posts: 544
Ok, this is starting to get weird. Also progress from today.


Reply With Quote
     
     
  #225  
Old Posted Apr 3, 2022, 4:26 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,869
Quote:
Originally Posted by GeoNerd View Post
Ok, this is starting to get weird. Also progress from today.
Seriously!?
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #226  
Old Posted Apr 3, 2022, 12:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,631
Quote:
Originally Posted by Harley613 View Post
Today's Progress:
They built a really nice entrance for the combined sewage tunnel (white building with a green roof behind the library), but the traction power substation (grey shed) ruins the vista. I doubt the City will dress it-up, but it could be done for fairly cheap. Cheaper than battling the NCC in Court over denying Embassy Row for an unrelated reason (Brian Coburn extension).
Reply With Quote
     
     
  #227  
Old Posted Apr 3, 2022, 4:31 PM
RideauRat RideauRat is offline
Registered User
 
Join Date: Mar 2019
Posts: 185
is that the base of the crane? we should be seeing a crane in a month or so right?
Reply With Quote
     
     
  #228  
Old Posted Apr 12, 2022, 1:29 AM
Dzingle Bells Dzingle Bells is offline
Registered User
 
Join Date: Feb 2019
Posts: 158
From April 9th.

Reply With Quote
     
     
  #229  
Old Posted Apr 12, 2022, 4:38 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,357
Wow, it's going to be really cool to see this area developed again, finally. Looked like a real afterthought/eyesore from certain vantage points for the longest time.
Reply With Quote
     
     
  #230  
Old Posted Apr 12, 2022, 7:13 PM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Quote:
Originally Posted by Davis137 View Post
Wow, it's going to be really cool to see this area developed again, finally. Looked like a real afterthought/eyesore from certain vantage points for the longest time.
Was just thinking the same. Apart from some temporary Claridge sales centres, this development will be the first thing to pop out of the ground at Lebreton since Fusion, and hopefully usher in a wave of activity for the Flats.
Reply With Quote
     
     
  #231  
Old Posted Apr 20, 2022, 3:55 PM
drizzo_613's Avatar
drizzo_613 drizzo_613 is offline
Registered User
 
Join Date: Feb 2006
Posts: 233
April 20th progress. Waterproofing almost complete and crane to be setup as early as this Friday.

__________________
Ott-Gat [The Fraternal Twin Cities]
Reply With Quote
     
     
  #232  
Old Posted Apr 20, 2022, 4:30 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,869
We are going to have to update the old Crane Index thread. Surely we are in Peak Crane mode at this point.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #233  
Old Posted Apr 20, 2022, 4:33 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,866
is there only 1 level of underground parking? Im not complaining just surprised lol
Reply With Quote
     
     
  #234  
Old Posted Apr 20, 2022, 4:59 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,869
I keep forgetting we are getting the dumbed down Claridge'd bait & switch version of this project.



Not this.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #235  
Old Posted Apr 20, 2022, 5:59 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,296
Yay more cranes!
Reply With Quote
     
     
  #236  
Old Posted Apr 20, 2022, 6:00 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,357
Nnn Boots-'n-katz, Boots-'n-katz, Boots-'n-katz...LOL!
Reply With Quote
     
     
  #237  
Old Posted Apr 20, 2022, 6:04 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,631
Quote:
Originally Posted by SL123 View Post
is there only 1 level of underground parking? Im not complaining just surprised lol
Combined, the buildings will have 340 parking spaces and 470 bike spaces, for 609 units. That is, if the last numbers posted on SSP are still correct.

Not sure how many levels of parking that would be, but based on the pic, I'd say maybe two levels.
Reply With Quote
     
     
  #238  
Old Posted Apr 20, 2022, 6:18 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
Combined, the buildings will have 340 parking spaces and 470 bike spaces, for 609 units. That is, if the last numbers posted on SSP are still correct.

Not sure how many levels of parking that would be, but based on the pic, I'd say maybe two levels.
According to the 2021-05-31 - East Flats Architectural Drawing Set - D02-02-19-0099, there are 3 levels of parking.
Reply With Quote
     
     
  #239  
Old Posted Apr 20, 2022, 9:39 PM
drizzo_613's Avatar
drizzo_613 drizzo_613 is offline
Registered User
 
Join Date: Feb 2006
Posts: 233
Crane is on site.

__________________
Ott-Gat [The Fraternal Twin Cities]
Reply With Quote
     
     
  #240  
Old Posted Apr 21, 2022, 12:45 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by Harley613 View Post
I keep forgetting we are getting the dumbed down Claridge'd bait & switch version of this project.



Not this.
Classic bait and switch. They also couldn't get the 55 stories they originally wanted. Sucks.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 3:34 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.