  #2561  
Old Posted Feb 15, 2022, 7:44 PM
Nowhere Nowhere is offline
 
Join Date: May 2018
Posts: 228
I don't get it. The rendering shows a trenched station, yet it looks like a cut and cover tunnel in the drone shot.

Also, the rendering shows "2 Ottawa" on the train. Line 2 doesn't go anywhere close to Lincoln Fields.
Reply With Quote
     
     
  #2562  
Old Posted Feb 15, 2022, 8:32 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Nowhere View Post
I don't get it. The rendering shows a trenched station, yet it looks like a cut and cover tunnel in the drone shot.

Also, the rendering shows "2 Ottawa" on the train. Line 2 doesn't go anywhere close to Lincoln Fields.
The "2 Ottawa" probably stands for "Stage 2, Ottawa". We can never read too much into the trains in renderings and what the displays say. I mean, Trillium renderings showed Alstom Citadis Spirits at stations, sooo...

Why do you thing the drone footage shows a cut-and-cover tunnel? Cut-and-cover starts out as a trench before it's covered. At this point, the Byron cut-and-cover tunnel construction stops a few hundred meters from LF station, which is being built stand-alone at the moment.
Reply With Quote
     
     
  #2563  
Old Posted Feb 15, 2022, 9:15 PM
Nowhere Nowhere is offline
 
Join Date: May 2018
Posts: 228
Quote:
Originally Posted by J.OT13 View Post
I see. The angle of this picture make it look like there's a tunnel entrance beside Carling towards Richmond. Now I see how it's built.
Reply With Quote
     
     
  #2564  
Old Posted Feb 16, 2022, 3:39 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Nowhere View Post
I see. The angle of this picture make it look like there's a tunnel entrance beside Carling towards Richmond. Now I see how it's built.
I can understand that. The concourse makes it look like a tunnel underneath. The snow amplifies the illusion.
Reply With Quote
     
     
  #2565  
Old Posted Mar 3, 2022, 4:21 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
From Watson's Twitter:

Quote:
Jim Watson
@JimWatsonOttawa


Great news! We have completed excavating more than 50% of the Stage 2 LRT tunnel under Byron Linear Park. Most of the excavation is expected to be completed by end of year. Once complete, crews will begin covering the tunnel! #Stage2MajorProgress


9:56 AM · Mar 1, 2022·Twitter Web App
https://twitter.com/JimWatsonOttawa/status/1498673434754269186?cxt=HHwWhIC-jY7jrcwpAAAA
Reply With Quote
     
     
  #2566  
Old Posted Mar 4, 2022, 7:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
March update: https://mailchi.mp/d03148e669d1/o-train-west-extension-construction-update?e=f37f60b514

Some images:

Byron Tunnel







Woodroffe High School Ped Bridge

Reply With Quote
     
     
  #2567  
Old Posted Mar 7, 2022, 10:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Reply With Quote
     
     
  #2568  
Old Posted Mar 9, 2022, 3:31 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Posted on Rail Fans Canada Discord, the overview and cycling/ped networks around Iris and Algonquin stations.



Reply With Quote
     
     
  #2569  
Old Posted Mar 23, 2022, 1:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Reply With Quote
     
     
  #2570  
Old Posted Mar 26, 2022, 12:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
From Rail Fans Canada. Iris street bridge overpass.


https://otrain.railfans.ca/snapshot-upda...bridge-and-pinecrest-creek-march-20-2022

Cut-and-cover tunnel progress near Lincoln Fields.


https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-1-4
Reply With Quote
     
     
  #2571  
Old Posted Mar 27, 2022, 2:00 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
Took these photos yesterday along the Byron tunnel at New Orchard. With the acoustic padding removed from the fencing, it's easier to see the progress on the tunnel walls. It looks bomb-proof with the amount of rebar and the thickness of the concrete.



Reply With Quote
     
     
  #2572  
Old Posted Mar 31, 2022, 8:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Reply With Quote
     
     
  #2573  
Old Posted Apr 1, 2022, 8:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
From Rail Fans Canada Snapshot Updates:

Lincoln Fields, March 29:









https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-lincoln-fields-station-march-29-2022
Reply With Quote
     
     
  #2574  
Old Posted Apr 2, 2022, 1:45 AM
Multi-modal Multi-modal is offline
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by J.OT13 View Post
From Rail Fans Canada Snapshot Updates:

Lincoln Fields, March 29:

https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-lincoln-fields-station-march-29-2022
Its quite amazing how far-along Lincoln Fields Station is given when Confed. Line West extension is supposed to open.
Reply With Quote
     
     
  #2575  
Old Posted Apr 2, 2022, 11:25 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Multi-modal View Post
Its quite amazing how far-along Lincoln Fields Station is given when Confed. Line West extension is supposed to open.
I had the same thought. Progress at Algonquin is quite similar as well. Steel along Line 2 started around the same time as LF. Meanwhile in the east, set to open a year earlier then the west, steel work on Montreal has just started.
Reply With Quote
     
     
  #2576  
Old Posted Apr 2, 2022, 9:33 PM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
Quote:
Originally Posted by J.OT13 View Post
I had the same thought. Progress at Algonquin is quite similar as well. Steel along Line 2 started around the same time as LF. Meanwhile in the east, set to open a year earlier then the west, steel work on Montreal has just started.
Sure LF and Algonguin are advanced compared to some East side stations but some West Stations (westboro, Dominion, Cleary, Sherborne, Bayshore...) have not even started.
Reply With Quote
     
     
  #2577  
Old Posted Apr 8, 2022, 5:18 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Reply With Quote
     
     
  #2578  
Old Posted Apr 8, 2022, 6:56 PM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by J.OT13 View Post
That's some quality entertainment right there.

Why are you shifting the alignment?

We aren't shifting the alignment.

Why did you shift the alignment?

We didn't shift the alignment.

Why are you going to shift the alignment?

We are not going to shift the alignment.
Reply With Quote
     
     
  #2579  
Old Posted Apr 8, 2022, 8:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
That sums up pretty much all public sessions, be it this or development proposals. The presenter clearly lays out the plan, and it's followed by half a dozen people asking the same question over and over, a question that was clearly answered in the initial presentation.
Reply With Quote
     
     
  #2580  
Old Posted Apr 8, 2022, 8:19 PM
hwy418 hwy418 is offline
 
Join Date: Jun 2013
Posts: 410
Not sure if it's just me, but I found the presenter to be speaking as if he was explaining the project to a bunch of children. That briefing could have been wrapped-up in less than 30 minutes!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:19 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.