  #161  
Old Posted Jan 8, 2021, 4:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Really slow on finishing the exterior of the retirement building. Truck onsite delivering a load of drywall today so interior work must be progressing.
Reply With Quote
     
     
  #162  
Old Posted Jan 24, 2021, 3:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Interesting article from Guelph about commercial building zoning change due to inability to lease as office space.


https://www.guelphtoday.com/local-news/o...look-to-convert-it-to-apartments-3284565


Sifton appears to be having the same problem with their office space at West 5. Nobody wants to lease offices.
Reply With Quote
     
     
  #163  
Old Posted Mar 26, 2021, 3:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Looks like they have now installed most of the solar panels on the south and west facing sides of the retirement home building. As with the apartment building the exterior finishing was brutally slow going.
Reply With Quote
     
     
  #164  
Old Posted Mar 26, 2021, 3:58 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Not technically part of West 5 however they are moving dirt in what appears to be preparation to build the Eve Park Suites https://www.evepark.ca
Pricing is now listed and the past week or so they have started prep work.
Reply With Quote
     
     
  #165  
Old Posted Apr 23, 2021, 10:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Next batch of Sifton townhomes going to Planning committee. - https://pub-london.escribemeetings.com/filestream.ashx?DocumentId=80241
Reply With Quote
     
     
  #166  
Old Posted Jun 3, 2021, 6:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
They are drilling and setting foundation pilings to the immediate east of the current retirement home underground level. Looks like an extension of the underground parking but may be another small building. Hard to tell and rather odd to phase it this way.
Reply With Quote
     
     
  #167  
Old Posted Jun 3, 2021, 6:53 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Quote:
Originally Posted by jammer139 View Post
They are drilling and setting foundation pilings to the immediate east of the current retirement home underground level. Looks like an extension of the underground parking but may be another small building. Hard to tell and rather odd to phase it this way.
I believe this will be for phase 2 of the retirement home, there is a second building that will be built on the corner directly east.
Reply With Quote
     
     
  #168  
Old Posted Jun 30, 2021, 7:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Not sure what Sifton was thinking with this retirement home. They have now completed the excavation of pit immediately east of the underground parking garage for the retirement building they just built. They have had to scrap the backfill off the concrete walls they previously poured. If the plan was to build a 2nd phase or attached building why wouldn't you have excavated the entire site in the first place? Very odd indeed.
Reply With Quote
     
     
  #169  
Old Posted Sep 14, 2021, 4:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Now forming the footings and foundation for the 2nd phase of the retirement home just east of the first building.
Reply With Quote
     
     
  #170  
Old Posted Sep 15, 2021, 1:33 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
They have also formed the additional few condos that are being built on the west side of the retirement building. It believe it will be another 18-20 units in total the same or similar to units built on the east of the retirement home.
Reply With Quote
     
     
  #171  
Old Posted Oct 5, 2021, 2:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Tower crane base now visible in the pit for the 2nd phase of the retirement building. Foundations poured now for the townhomes immediately to the west of retirement home. And site prep well under way for the Eve Park condos to the west of that.


https://www.evepark.ca/home
Reply With Quote
     
     
  #172  
Old Posted Nov 22, 2021, 8:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Tower crane is now up for phase 2 of the Riverstone retirement building. Nearly done forming for the L1 walls.


https://liveatriverstone.ca/
Reply With Quote
     
     
  #173  
Old Posted Jan 11, 2022, 8:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Ground floor slab is now poured and have forming for first ground floor walls up on phase 2 of the retirement building.
Reply With Quote
     
     
  #174  
Old Posted Jan 18, 2022, 9:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Elevator and stairwell shafts now poured for ground floor. Structural steel for ground floor also progressing really well on phase 2 of retirement home.
Reply With Quote
     
     
  #175  
Old Posted Jan 25, 2022, 9:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Have some of the 2nd floor slabs installed now in the NE corner of phase 2 of the retirement home.
Reply With Quote
     
     
  #176  
Old Posted Mar 4, 2022, 8:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
3rd floor slabs now installed and structural steel going in for 3rd and 4th floor.
Reply With Quote
     
     
  #177  
Old Posted Mar 9, 2022, 8:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Some of the 4th floor slabs now installed on east side.
Reply With Quote
     
     
  #178  
Old Posted Mar 22, 2022, 8:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
4th floor slabs now installed. Not clear if they plan to go higher in phase 2 of the retirement home.
Reply With Quote
     
     
  #179  
Old Posted Apr 5, 2022, 7:11 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
5th floor slab install nearly complete. Not clear if they plan to go higher or if this will be the roof for phase 2 of the retirement home.
Reply With Quote
     
     
  #180  
Old Posted Apr 8, 2022, 3:27 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Quote:
Originally Posted by jammer139 View Post
5th floor slab install nearly complete. Not clear if they plan to go higher or if this will be the roof for phase 2 of the retirement home.
Supposed to be 7 stories is it not, like phase 1
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates