Quote:
Originally Posted by Agent Orange
This is definitely what we should be focusing on rather than streetcars or other rail pipe dreams. I'm not sure what the transport professionals think about this, but I'd also like to see routes that go perpendicular through downtown. Eg N Federal > Colfax > S Colorado and N Colo > Colfax > S Federal. I feel like that would help increase the number of one seat rides. And the Speer/Leetsdale/Parker corridor should be a top priority after Colfax imo.
|
We've had a process for it. This is roughly what the transit professionals/consultants with the city came up with:
If you want more details you can go through the 30mb document for
Denver Moves.
Those of us who have been on this forum for awhile and have been to these meetings, realize that when they say Full BRT to Rail on the graphic that means some at grade rail solution (lrt/streetcar) will be part of the alternatives analysis but will likely be dismissed. Because we just don't need that LRT capacity in the medium term, nor can we afford to spend extra for excess capacity on any one corridor, especially when we have so many corridors we need to improve.
What needs to be done isn't really as big of a question as how to get it done. I had to Google when it was because it's been so long but the city had a pretty consequential public meeting where planners tried to pass off peak period side-running transit lanes as BRT for the solution for Colfax. Some on this forum spoke out at that meeting, others wrote scathing comments on the comment cards, and online. The city got the message and it ended up being true BRT proposed. That meeting took place in late August 2014.
The city has known that BRT should be the solution for Colfax for almost 8 years, we voted on a bond for it in 2017, and it's still 6 years away. In the time since that meeting the Cubs have won the world series, we've had a reality show president, a global pandemic and Russia has gone back to acting like the USSR. But still no BRT on Colfax.
I'm 100% with Bunt that BRT is a good incremental step in the right direction. But incremental change shouldn't take 14 years to implement. The city needs to identify the funding, streamline the planning, and have the political backbone/will to implement the other corridors faster.