Quote:
Originally Posted by Steely Dan
wait....... WHAT???
what's the deal with the snail's pace construction of this thing?
have they still not closed on the construction loan or something?
|
It's like a giant pound sign with the eight super columns and thick concrete walls running between them. They seem to use much more rebar and formwork on a typical floor than a normal residential building. It was 12 days between the last slab pour and the current wall pour. Now that they're repeating the same layout for each floor they may get some time out of that but still, maybe one floor per week at best?