  #1261  
Old Posted Jan 11, 2022, 3:18 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Drone footage from above posted Jan 3rd on ONNI twitter (probably old footage):

https://twitter.com/onnigroup/status/147...tatus2F1478171658263298048widget%3DTweet

More pics here (probably old).
https://www.skyhivedrone.com/infrastructure
Reply With Quote
     
     
  #1262  
Old Posted Jan 11, 2022, 1:26 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,838
2022, January 7

Untitled by Lexus LX570, on Flickr
Reply With Quote
     
     
  #1263  
Old Posted Jan 15, 2022, 4:35 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,838
2022, January 14

South West tower, transfer slab completed. We should see it start rising soon.

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr
Reply With Quote
     
     
  #1264  
Old Posted Jan 15, 2022, 5:14 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,121
Such a fascinating site to watch.

Thanks for the updates.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #1265  
Old Posted Jan 15, 2022, 7:32 PM
VarBreStr18 VarBreStr18 is offline
Registered User
 
Join Date: Nov 2014
Posts: 750
Quote:
Originally Posted by Coldrsx View Post
Such a fascinating site to watch.

Thanks for the updates.
An engineering marvel, just prepping the site took 2 and a half year... I think. This tower once complete will mark the western gateway into Brentwood. a sight to behold.
Reply With Quote
     
     
  #1266  
Old Posted Jan 15, 2022, 7:47 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,977
Yea...it's a feast for the eyes looking at all they have done and will do on this site. Incredible work so far. This is one unique project.
__________________
"Living life on the edge"
Reply With Quote
     
     
  #1267  
Old Posted Jan 15, 2022, 8:06 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i cant believe that TransLink actually allowed them to do that. that's pretty crazy. though really almost anything can be engineered to work. i am sure there were many checks on that work.
Reply With Quote
     
     
  #1268  
Old Posted Jan 15, 2022, 11:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Great shots.
The scale of the SkyTraincolumn foundations is highlighted by the workers nearby.
Anyone else think the columns for he corner (tallest) tower seem slim compared to Shangri-La? Could just be a scale or perspective issue.
Reply With Quote
     
     
  #1269  
Old Posted Jan 17, 2022, 5:25 PM
rofina rofina is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,149
Does anyone know anything about the subs on this job?

I live in Brentwood and have never seen anything like the production on this site.

The work starts at around 6am, and doesn't stop until around 7-8pm, 6 days a week.
Usually couple nights a week flood lights are on and crews still working at 9pm.

The sheer amount of man hours here is mind blowing, and not the usual from my experience.
Reply With Quote
     
     
  #1270  
Old Posted Jan 21, 2022, 7:24 PM
rofina rofina is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,149
Case in point - Wednesday night, concrete still being placed at 9:17pm. With clean up that's easily a 10pm if not 11pm finish.

Crews onsite making noise at about 6:15am.

Are they doing a double shift rotation?

Incredible production here.
Reply With Quote
     
     
  #1271  
Old Posted Jan 22, 2022, 7:17 AM
CondoInvestor CondoInvestor is offline
Registered User
 
Join Date: Jun 2020
Posts: 143
can't wait til this project is done
Reply With Quote
     
     
  #1272  
Old Posted Feb 12, 2022, 1:37 AM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,838
2022, February 11

Untitled by Lexus LX570, on Flickr
Reply With Quote
     
     
  #1273  
Old Posted Feb 12, 2022, 2:30 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Thanks.
Super-close tower spacing!
Reply With Quote
     
     
  #1274  
Old Posted Feb 12, 2022, 6:07 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Yeah, those are not going to be very nice units to live in, facing the opposite tower. Another downside to this project next to the high likelihood of a flooded parkade.
Reply With Quote
     
     
  #1275  
Old Posted Feb 12, 2022, 9:44 PM
CondoInvestor CondoInvestor is offline
Registered User
 
Join Date: Jun 2020
Posts: 143
the spacing between tower 2 and 3 is wider
Reply With Quote
     
     
  #1276  
Old Posted Feb 12, 2022, 11:40 PM
Marshal Marshal is offline
perhaps . . .
 
Join Date: Dec 2015
Location: Vancouver
Posts: 1,493
The too tight spacing is akin to City of Lougheed.

Claiming a risk of parkade flooding as if it were an accepted and likely scenario is just naive and dumb. Sure, if there is a major engineering mistake. Otherwise, we have a few technological solutions to water ingress in conditions like these. There are a number of local projects built/being built that solve the same condition. (City Gate and a dozen other projects on False Creek, several riverside projects in New West and Vancouver . . . ) Relatively speaking,there is nothing special about this one.
Reply With Quote
     
     
  #1277  
Old Posted Feb 13, 2022, 1:58 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,105
the area around Still Creek does flood fairly often when heavy rains come but I have never heard that those condos across from Home Depot have had any issues have they? It's probably not a worry.
__________________
belowitall
Reply With Quote
     
     
  #1278  
Old Posted Feb 13, 2022, 4:09 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
There's a swale or marsh south of Tandem that is supposed to handle excess stormwater.


https://www.google.com/maps/place/Tandem...415de58d!8m2!3d49.2636617!4d-123.0126083
Reply With Quote
     
     
  #1279  
Old Posted Feb 13, 2022, 3:41 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Why won't Burnaby just build a proper storm waterway here is mystery to me.
Reply With Quote
     
     
  #1280  
Old Posted Feb 13, 2022, 4:57 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Phase I: 64fl 51fl 43fl, wow, Burnaby steams ahead!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 4:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.