HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #221  
Old Posted Aug 18, 2021, 6:56 PM
Floppa's Avatar
Floppa Floppa is offline
Registered User
 
Join Date: Aug 2021
Posts: 266
Quote:
Originally Posted by JHikka View Post
Ottawa's also nowhere near the size of either of those cities. I don't think it's a reasonable argument to say 'yeah our traffic is bad but it's not as bad as there!'. Surely solutions can be found within Ottawa that suit Ottawa more than simply looking across the street at other cities for comparables.
I think you misunderstand my point. I'm saying that having lots of transfers is okay if most of them are between rapid transit lines. We have to be better than them tho, since a transfer in Ottawa is more likely to dissuade a customer than one in Montreal.
Reply With Quote
     
     
  #222  
Old Posted Aug 18, 2021, 7:02 PM
JHikka's Avatar
JHikka JHikka is offline
ハルウララ
 
Join Date: Jul 2009
Location: Toronto
Posts: 12,853
Quote:
Originally Posted by Floppa View Post
I think you misunderstand my point. I'm saying that having lots of transfers is okay if most of them are between rapid transit lines. We have to be better than them tho, since a transfer in Ottawa is more likely to dissuade a customer than one in Montreal.
I moved away from Ottawa just before Confederation Line opened but i'm pretty sure that line added transfers to any commute I would have made from Centretown. Buses on the transitway would take me places direct, but suddenly I would have had to transfer at Tunney's or Blair...

In saying that, one transfer is typically fine for a commute, two begins pushing it, and anything above that is untenable for a service, especially if there's no rapid frequency in the lines. Nobody wants to stand on Bank, or elsewhere, for 25 minutes waiting for a bus, just as nobody wants to stand in a subway station for longer than eight minutes waiting for a train.
Reply With Quote
     
     
  #223  
Old Posted Aug 18, 2021, 7:09 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,612
Quote:
Originally Posted by JHikka View Post
I moved away from Ottawa just before Confederation Line opened but i'm pretty sure that line added transfers to any commute I would have made from Centretown. Buses on the transitway would take me places direct, but suddenly I would have had to transfer at Tunney's or Blair...

In saying that, one transfer is typically fine for a commute, two begins pushing it, and anything above that is untenable for a service, especially if there's no rapid frequency in the lines. Nobody wants to stand on Bank, or elsewhere, for 25 minutes waiting for a bus, just as nobody wants to stand in a subway station for longer than eight minutes waiting for a train.
I think that is exactly it. It's not transfers per se, as much as it is transfers to low-frequency services. If frequencies are anything less than 5 min for trains or 10 mins for buses, transfers become problematic.
Reply With Quote
     
     
  #224  
Old Posted Aug 18, 2021, 7:56 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by phil235 View Post
I think that is exactly it. It's not transfers per se, as much as it is transfers to low-frequency services. If frequencies are anything less than 5 min for trains or 10 mins for buses, transfers become problematic.
With the exception of Line 1, our system fails most of the time to meet your specification.
Reply With Quote
     
     
  #225  
Old Posted Aug 18, 2021, 7:58 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,612
Quote:
Originally Posted by lrt's friend View Post
With the exception of Line 1, our system fails most of the time to meet your specification.
And it doesn't even come close in most cases, even on major arteries in the urban core like Bronson and Montreal Rd.
Reply With Quote
     
     
  #226  
Old Posted Aug 18, 2021, 8:23 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by phil235 View Post
And it doesn't even come close in most cases, even on major arteries in the urban core like Bronson and Montreal Rd.
This is what happens when we introduce capacity planning at the same time as rail transit, which requires more frequent transfers. We build a system that is not transfer friendly. A perfect example is how we allowed capacity planning to determine the design of Line 2, with no consideration on how users were going to transfer off and on to it.
Reply With Quote
     
     
  #227  
Old Posted Aug 19, 2021, 12:00 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #228  
Old Posted Aug 20, 2021, 4:36 AM
Nowhere Nowhere is offline
Registered User
 
Join Date: May 2018
Posts: 228
Quote:
Originally Posted by originalmuffins View Post
Lol I don't agree at all with all the hard objection to Stage 3 to include Barrhaven (especially considering it's not planned to be done before 2030). Most major suburbs are within the plan to be apart of Stage 2 and 3 (Orleans, Kanata, Riverside South, etc.). Don't see why they wouldn't include one of the fastest growing areas in the city with an actual plan for densification in its core as well. The city boundaries are already grown. The baseline BRT is still within the plans so it's not one or the other. Really weird to see the insistence that it is one or the other. Both are in the plans to get done.
I'm not against the Barrhaven LRT, I'm just trying to stay realistic. In an ideal world, both the Baseline transitway and the Barrhaven LRT would be built, but governments, whether municipal, provincial or federal, are increasingly indebted and I think we can expect less transit infrastructure spending for the following years and decades.

If the Feds and Queen's Park are willing to fund both of them then sure, let's build the Barrhaven LRT.
Reply With Quote
     
     
  #229  
Old Posted Aug 21, 2021, 11:44 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Acajack View Post
And hope that they can get away with it?
The city has zero say in a bridge anyway, the Feds will build it, or not, in a place the city wants, or not. Really both Gatineau and Ottawa are mere passengers along for the ride, but the NCC seems content to just issue a new bridge study every 20 years or so and call it a day

Edit... Nvm, I seem to have replied to an ancient post ������
Reply With Quote
     
     
  #230  
Old Posted Dec 10, 2021, 12:45 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Part of the Draft TMP is out! Policies and consultation on active transportation network

https://engage.ottawa.ca/transportation-master-plan?s=09
Reply With Quote
     
     
  #231  
Old Posted Dec 10, 2021, 7:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
So far, transit wise, basically no change in 15 years. Way to evolve with the times.

I like how they identify "Equity priority neighbourhoods" on the page 124 map, yet those have little to no rapid transit planned, unless they happen to be on the way to commuter, high-income suburbs.

https://ehq-production-canada.s3.ca-cent...b253fbba4991899c5f1dadd2ddef5e7e862c8b0b
Reply With Quote
     
     
  #232  
Old Posted Dec 10, 2021, 9:05 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
I like the examples of multi-modal trips, which most would find very inconvenient. Most people want their trips to be as simple as possible. That is why the automobile is so popular.
Reply With Quote
     
     
  #233  
Old Posted Dec 10, 2021, 9:11 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by J.OT13 View Post
So far, transit wise, basically no change in 15 years. Way to evolve with the times.

I like how they identify "Equity priority neighbourhoods" on the page 124 map, yet those have little to no rapid transit planned, unless they happen to be on the way to commuter, high-income suburbs.

https://ehq-production-canada.s3.ca-cent...b253fbba4991899c5f1dadd2ddef5e7e862c8b0b
I noticed that too. Well, there is so much emphasis that biking can get you so much further in 10 minutes, 2.5 km, if you are young enough and fit enough and the weather is good enough and if you actually have a bike.

Of course, there is also the emphasis on private services such ride share, bike share and e-scooter share. I think that does not service equity seeking communities or anybody on limited income well.
Reply With Quote
     
     
  #234  
Old Posted Feb 11, 2022, 3:05 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
What’s the Matter with American Cities?
Research shows that the average resident in a typical western U.S. city, such as Los Angeles or Phoenix,
contributes approximately six times more carbon to the atmosphere per capita than an average European city resident.
https://www.archdaily.com/976607/whats-t...tm_source=ArchDaily%20List&kth=6,434,405
Reply With Quote
     
     
  #235  
Old Posted Feb 11, 2022, 4:56 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by J.OT13 View Post
So far, transit wise, basically no change in 15 years. Way to evolve with the times.

I like how they identify "Equity priority neighbourhoods" on the page 124 map, yet those have little to no rapid transit planned, unless they happen to be on the way to commuter, high-income suburbs.

https://ehq-production-canada.s3.ca-cent...b253fbba4991899c5f1dadd2ddef5e7e862c8b0b
I am replying to an old post, but I'm not sure if everyone on the forum realizes that the TMP is not updating the map of rapid transit/road projects until 2024. This is because the origin-destination (transportation trip) survey has been delayed and won't be complete until end of 2022 at the earliest. The current consultation is only about policies - that is why the map still looks exactly like the 2013 TMP.
Reply With Quote
     
     
  #236  
Old Posted Feb 13, 2022, 3:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Multi-modal View Post
I am replying to an old post, but I'm not sure if everyone on the forum realizes that the TMP is not updating the map of rapid transit/road projects until 2024. This is because the origin-destination (transportation trip) survey has been delayed and won't be complete until end of 2022 at the earliest. The current consultation is only about policies - that is why the map still looks exactly like the 2013 TMP.
Point taken. I still have little faith the City will make any dramatic (and needed) changes unless we elect a vastly different Council this Fall.
Reply With Quote
     
     
  #237  
Old Posted Apr 28, 2022, 11:27 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Reply With Quote
     
     
  #238  
Old Posted Aug 4, 2022, 6:37 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Reply With Quote
     
     
  #239  
Old Posted Aug 6, 2022, 2:45 PM
DarthVader_1961 DarthVader_1961 is offline
Registered User
 
Join Date: Jun 2009
Posts: 478
Quote:
Originally Posted by waterloowarrior View Post
This line caught my attention in the Curbside mgmt section..

“ There should be no on-street parking on commercial main streets. “

Would Bank Street fall in this category?
Reply With Quote
     
     
  #240  
Old Posted Aug 6, 2022, 3:39 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by DarthVader_1961 View Post
This line caught my attention in the Curbside mgmt section..

“ There should be no on-street parking on commercial main streets. “

Would Bank Street fall in this category?
Without parking on Bank it would become a major throughfare unless they narrow it some other way.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.