Old Posted Jan 6, 2022, 12:37 PM
skisail_ott skisail_ott is offline
Registered User
 
Join Date: Sep 2019
Location: Ottawa
Posts: 49
Quote:
Originally Posted by bartlebooth View Post
Thanks for sharing the pictures! It's been hard to follow progress working from home so it's nice to see your images.

I believe the block you're referring to is #11. Someone posted a site plan on page 41. There's also a render of what we should expect but I don't recall what page it's on. I don't think it's too far from this page.
Here's a more recent site plan - from the April 2021 One Planet Living report.

Reply With Quote
     
     
  #1402  
Old Posted Jan 11, 2022, 8:40 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,432
Quote:
Originally Posted by ponyboycurtis View Post


Balcony glass is approaching the halfway mark. This building is really growing on me.
I'm kind of torn on this one. Not a fan of the beige brick. Maybe if the podium had been a different colour, like a more classic red. Really looks like a 70s industrial building (and I get that the podium IS an industrial building, basically). Some murals on the mostly blank faces might help.
Reply With Quote
     
     
  #1403  
Old Posted Jan 11, 2022, 8:51 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,925
So far, architectural speaking, i much prefer the buildings that have been built on the Ottawa side than the Gatineau side. Same thing can be said for the under construction tower on the ottawa side vs the U/C O II in gatineau just by looking at the renderings.

Last edited by SL123; Jan 12, 2022 at 1:21 AM.
Reply With Quote
     
     
  #1404  
Old Posted Jan 14, 2022, 11:30 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,347


Reply With Quote
     
     
  #1405  
Old Posted Jan 18, 2022, 12:43 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by skisail_ott View Post
Here's a more recent site plan - from the April 2021 One Planet Living report.

This is why I love the Zibi project so much. It is a great mix of retail, residential, and greenspace. Dream is doing a great job so far.

A great idea for the rock beachfront area would be a marble beach style.

Reply With Quote
     
     
  #1406  
Old Posted Jan 18, 2022, 12:53 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,878
I hope the path in that render doesn't actually end up being a concrete sidewalk with cross-lying strain-relief grooves. I'd rather see an asphalt MUP here.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1407  
Old Posted Jan 18, 2022, 12:59 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,925
Quote:
Originally Posted by Harley613 View Post
I hope the path in that render doesn't actually end up being a concrete sidewalk with cross-lying strain-relief grooves. I'd rather see an asphalt MUP here.
Definitely wont be a MUP. This path leads to a staircase and they already planned another MUP behind that path


Last edited by SL123; Jan 18, 2022 at 1:13 PM.
Reply With Quote
     
     
  #1408  
Old Posted Jan 18, 2022, 3:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,432
Reply With Quote
     
     
  #1409  
Old Posted Jan 18, 2022, 4:14 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,792
Quote:
Originally Posted by Harley613 View Post
I hope the path in that render doesn't actually end up being a concrete sidewalk with cross-lying strain-relief grooves. I'd rather see an asphalt MUP here.
Probably planned as concrete to be more resilient to flooding. Same reason the path through the Billings Bridge underpass is concrete.
Reply With Quote
     
     
  #1410  
Old Posted Jan 18, 2022, 7:18 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,878
Ok makes sense now! Thanks guys! I didn't bother looking at the plan, it looked like the only path in the render.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1411  
Old Posted Jan 18, 2022, 7:47 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,347
Quote:
Originally Posted by SL123 View Post
Definitely wont be a MUP. This path leads to a staircase and they already planned another MUP behind that path
Hmm it does look like a staircase. For some reason I thought it would be a wide enough concrete MUP.

Accessing river pathway from some parking entrance driveway? Seems like they didn't think this one through.
Reply With Quote
     
     
  #1412  
Old Posted Jan 31, 2022, 5:46 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,473
Global co-working giant Spaces opens Zibi Ottawa location

By: OBJ staff
Published: Jan 28, 2022 4:39pm EST




Ottawa’s Zibi development continues to take shape, with the world’s largest provider of co-working space officially opening a new location at the waterfront site.

Spaces, a division of Switzerland-based International Workplace Group, unveiled the 26,000-square-foot property, which is housed in a four-storey former paper mill on Chaudière Island, this month. It joins a 29,000-square-foot Spaces location that opened last year on the Gatineau side of the Zibi project in former industrial buildings just east of Eddy Street.

Spaces’ second Zibi site marks the company’s latest expansion in the National Capital Region. The firm opened its first Ottawa location on Slater Street in 2019, and parent company IWG also operates three other co-working spaces in the downtown core under the Regus banner.

Wayne Berger, who heads IWG’s operations in the Americas, says the company has seen surging demand for its offerings during the pandemic as more employers embrace a hybrid model that allows employees to work from home or occupy short-term office space as needed.

“The pandemic has sped up the shift away from the traditional office towards a more flexible approach to the world of work,” Berger said in a statement.

IWG says it plans to add five new Spaces locations totalling nearly 175,000 square feet to its Canadian footprint in early 2022, with additional openings slated for later in the year.

The mixed-use Zibi neighbourhood, located just west of downtown on both sides of the Ottawa River, is a multibillion-dollar partnership between Toronto-based developer Dream Unlimited and Ottawa’s Theia Partners.

The developers anticipate that between 400,000 and 600,000 square feet of new office, retail and residential space will be added to Zibi each year through 2027. When complete, the site is expected to house 5,000 residents and employ 6,000 people in more than a million square feet of space.

https://www.obj.ca/index.php/article/rea...-giant-spaces-opens-zibi-ottawa-location
Reply With Quote
     
     
  #1413  
Old Posted Feb 10, 2022, 12:58 AM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 414
Dream has Block 7 listed to be available August 2023, I'd imagine they would be having to break ground pretty soon to meet that.

https://leasing.dream.ca/building/6-booth-st?search=&min=0&max=300000&type=A

Reply With Quote
     
     
  #1414  
Old Posted Feb 10, 2022, 1:42 AM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 479
Quote:
Originally Posted by UrbOttawa View Post
Dream has Block 7 listed to be available August 2023, I'd imagine they would be having to break ground pretty soon to meet that.

https://leasing.dream.ca/building/6-booth-st?search=&min=0&max=300000&type=A
Any idea who the architect is?

Edit: Looks like it's this firm

Last edited by bartlebooth; Feb 10, 2022 at 1:53 AM.
Reply With Quote
     
     
  #1415  
Old Posted Feb 10, 2022, 3:54 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,878
Interesting...a grocery store on the main floor. The building seems a little bit small for that, especially since Quebec doesn't have Farm Boy.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1416  
Old Posted Feb 28, 2022, 11:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,432
Sustainable redevelopment: Zibi opens its first rental units with self-contained energy plant

Anita Murray, Ottawa Citizen
Feb 23, 2022


The sustainable redevelopment of the former Domtar and E.B. Eddy site straddling the Ottawa River between downtown Ottawa and Gatineau has reached a new milestone with the opening of its first rental apartment building, as well as the completion of the self-contained energy plant that will run everything in the 34-acre project.

Called Aalto — meaning wave — the 15-storey rental tower is built on top of the energy plant so that the plant does not impede the stunning views no matter which side of the building you’re on.

“We really see this building as a cornerstone of the community’s Net Zero ambition,” says Justin Robitaille, who is vice-president of development at Dream Unlimited, which is building Zibi. It’s such a cornerstone that a viewing gallery facing Eddy Street let’s you see into the plant that takes up much of the building’s basement.

“We wanted this to be highly visible for people; we want sustainability on display,” says Robitaille. “We look at it as an opportunity to really demonstrate how we’re getting that done at a community scale, which is really the first of its kind in the region.”

Known officially as the Zibi Community Utility, the district power plant is a partnership between Dream, Theia Partners and Hydro Ottawa that relies on energy recovery from effluents from the nearby Kruger Products tissue plant for heating and the Ottawa River for cooling, he says. The system will provide zero-carbon heating and cooling for all Zibi tenants and residents.

The power plant and the rental building built on top of it speak to the uniqueness of Zibi. A residential tower with a power plant in the basement is not a common thing. And the revival of the area unlocks prime waterfront vistas and property that have been hidden from view for a century.

But the project also takes a holistic approach to development. It’s mindful of Aboriginal sensitivities (the land is unceded Algonquin Anishinaabe territory), it preserves as many of the site’s historic buildings as possible, it restores much of the shoreline to a natural state, and it emphasizes inclusive development in creating a community for all — and one that embodies a lifestyle of living, working and playing in your community.

The development is Canada’s first designated One Planet Community, an initiative developed by U.K.-based charity BioRegional and the World Wide Fund for Nature to promote improved stewardship of the Earth’s resources. It follows 10 principles that guide community development, “everything from zero-carbon energy to reducing waste consumption and generation,” says Robitaille.

Keeping to that approach is important to Dream and the Zibi team. Attention is paid as much to small things, such as promoting health and happiness by ensuring Aalto’s theatre room is stocked with movies or the games room has board games, as it is to the big things, like building a self-contained energy plant so that all buildings can be carbon neutral.

“Zibi is committed to achieving a number of sustainability criteria through the One Planet Living framework,” Robitaille says. As a result, Aalto “is a testament to some of our commitments.”

The building offers 162 one-bedroom, one-bedroom-plus-den and two-bedroom apartments, ranging from 503 to 1,007 square feet, and there is a mix of accessible, affordable and market-rate units. All come with six appliances, including in-unit laundry, bike storage and access to storage lockers.

Building amenities, all with generous terraces overlooking the Chaudière Falls, include a co-working space, fitness centre, theatre room, games room and party room with full kitchen.

“What we’ve noticed, especially during the pandemic, is that renters are really looking for more versatility in their living accommodations,” says Robitaille. “We’ve really tried to accommodate a lot of their living needs within the building itself.”

Because of the energy plant in the basement, there is no parking garage, but parking will be available in the rental building that’s under construction next door. In the meantime, there is surface parking close by.

For early tenant Hamza Balafrej, who moved in Dec. 1, being able to rent in a new, modern and well-equipped building was a big draw, as was its sustainability features and, of course, “the view is amazing,” he says. His west-facing apartment overlooks the Chaudière Falls. “In the summer, I can put my new chairs on the terrace and enjoy the nice view.” (East-facing units see Parliament Hill.)

Zibi, which launched in 2015, is now about 20 per cent complete, Robitaille says. Of the 40 buildings that will eventually be built to house a mixture of residential, commercial and retail, about eight are now done.

Retail is slow to gravitate to the site, hampered by the pandemic, but Robitaille says Dream is in talks with restaurants for both sides of the river and has brought in pop-up retail in the past, something it continues to explore.

A few office buildings have been completed. Early tenants include the federal government, IBM and the co-working company Spaces.

Some public spaces are also done. On the Ottawa side, Head Street Square is the main public plaza and gathering space for Zibi, while Pangishimo Park sits on the western tip of Chaudière Island. There is also now access to the falls themselves. Later this year, Tesasini Park and a bike pathway along the river are expected to open in Gatineau.

And, of course, there’s the popular Interzip Rogers zipline over the Ottawa River that opened last year. “I definitely recommend it,” says Robitaille, who has been on it, noting its adrenalin rush.

Up next are more rental buildings for both Gatineau and Ottawa, including one that is expected to offer a couple floors of co-living. The co-living units would likely combine three to five individually rented bedrooms with shared common space.

“These are fully furnished units (with rents) lower than a traditional one-bedroom,” Robitaille says.

But it will be a while before there are more condos. There are still a handful of units available in the first two condo buildings built (O in Gatineau and Kanaal in Ottawa), but Robitaille expects it will be three or four years before new condos are introduced.






Zibi Aalto

What A 15-storey environmentally conscious rental building along the Ottawa River in Gatineau

Builder Dream Unlimited

Rents From $1,425 for a one-bedroom apartment

Rental office By appointment, 10 rue Jos-Montferrand

Contact aaltosuites.ca; 613-224-0134

https://ottawacitizen.com/life/zibi-open...%20self,the%20building%20you're%20on.
Reply With Quote
     
     
  #1417  
Old Posted Mar 1, 2022, 6:14 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,347
Crane on the Quebec side is up. Now there are 3 cranes at Zibi.
Reply With Quote
     
     
  #1418  
Old Posted Mar 15, 2022, 1:20 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,432
From Rail Fans Canada Discord:













Reply With Quote
     
     
  #1419  
Old Posted Mar 15, 2022, 1:34 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,925
Wow great pics. Been looking forward to new aerial shots of Zibi. Good to see Block 206/207 almost at grade. We're only a few months away from having both sides of Booth Street complete on the island.
Reply With Quote
     
     
  #1420  
Old Posted Mar 18, 2022, 2:59 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 414
If they stay alive, the trees in the new park appearing to come straight out of bed rock will be a pretty unique feature. It's also a nice touch that you're able see into the energy plant.




Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 6:18 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.