Quote:
Originally Posted by twoNeurons
I don't think the Canada Line will be rebuilt. It would be cheaper and more beneficial to build out a parallel North/South Line. And I'm not even sure it needs to go all the way to the downtown peninsula. Once the M-Line is built, we may see a significant shift away from downtown along that corridor. A North/South Line along Knight/Fraser (could even be elevated for a lot of its length) connecting with the M-Line at VCC-Clark (maybe with an infill station on the Expo Line there as well) and then continuing on to the Hastings Line.
Or how about a Victoria Line. The #20 Victoria Bus is 5th busiest bus route after all (I don't know how much is because of the section on Hastings, though)
I know Arbutus seems like an obvious choice, but in respect to TOD, East Vancouver probably has more potential. You could cross the bridge East of Knight Street and continue on to become an East/West Line in Richmond along Bridgeport... or depending on where the traffic is coming from on the Canada Line, turn down Marine and terminate at Marine Gateway.
Roads aren't only going to be used by autonomous cars. We may see some degree of automation on highways, but autonomous cars will be mixed with other vehicles that use up every bit of width (like buses) for a long time to come.
Which I'm not sure is a bad idea. The parks board wants to shut Stanley Park down to cars before 2050 anyhow. Reducing traffic through there is also good. One idea I was thinking about is having the center lane a one-way transit-only use. Not sure how long it would take to cross the Lion's Gate but it could work if signalled properly.
True, but downtown COULD be better served by the Lions Gate bridge and either a tram-line or rapid bus service.
I'm mixed on it. But it does have one VERY significant advantage, you increase capacity on the Expo Line in the OFF-Peak direction. Hastings Riders going to Stadium will just stay on the train.
Hastings to Metrotown
Hastings to Commercial Drive
You get to use your off-peak direction more efficiently. I know it makes the Expo line longer, but terminating Expo Trains at Phibbs could potentially solve that as well. Perhaps additional tracks and switches to shunt around problems as the line gets longer.
|
One needs to be careful about the assumption a parallel line solves all your problems. I'm not against it, but it's a naive assumption.
You'll be attracting new users by its nature, reducing the ability for the parallel line to provide relief. It's also not really serving the same users, only a subsection of them.
The multi-billion dollar relief line (as originally proposed-the short version) was only expected to cover the immediate growth in ridership from population growth to 2031. The Yonge North extension required the switch to the Ontario Line (Relief Line North)- and it's
still not a long-term solution.
I wonder if there's a precedent for a 4-track subway. So the old subway is 2 tracks, then 2 tracks are built on above/below the old tracks. Wonder how well that works.
Also, side note, but Knight is not a good selection. It's a car road due to the Knight St. Bridge funneling traffic into it.
I'm actually referring to the BRT guide.
https://brtguide.itdp.org/branch/master/...dway-configurations#fixed-guided-busways
Each lane is 3.3m wide. Better automation and guidance could theoretically get it down to 3m.
Certainly cars are narrower, but there's only 2 lanes and some extra stuff here, not much to work with.
I guess you could have 4 lanes be for cars (say, 2.3m - the width of an SUV generally maxes out at 2m) and have the BRT lane be for trucks as well. Banning trucks on Marine allows the use of a dedicated tram-train. Ditto what's happen to the buses on Marine.
Note that this would leave 2.8m of extra space on Marine. That's either bike lanes, station platforms, or center turn lanes.
I'm not entirely against the idea either.
Lions Gate and the entire 99 corridor across West Van and DT Vancouver is hell to get across by car.
99 would need to be rereouted, though.
Though, using the same calculations for above for Lions' Gate would allow for a tram-train or BRT across Lions' Gate if the 2 remaining car lanes are all automated (and no trucks!) If you're going the tram-train route, you need to find somewhere to move the buses off of, however.
You could connect a tram to the proposed DT streetcar and Arbutus as well.
You know what? I'm starting to like this idea.
Quote:
Originally Posted by twoNeurons
I agree, although being able to use the reverse-peak of the EXPO line is pretty attractive. The trick would be getting over to Georgia (but I suppose the same problem exists when trying to get from Waterfront to Hastings).
Not sure if the old Railway corridor that bisects Tinseltown would work or not but if so, that also goes directly under Stadium station, offering another place to Transfer.
Something like this perhaps? Only one new station needed downtown:

|
As long as Tinseltown is still standing, that's not going to be easy.
Perhaps the plan would involve demolishing the site and redeveloping it?
Quote:
Originally Posted by Migrant_Coconut
Maybe, maybe not. Right now the Expo's operating at 15k right now, and despite serving a longer corridor than Cambie/Richmond, the downtown segment isn't excessively crowded. Though it probably wouldn't hurt to have RapidBuses on Burrard and Granville...
Above-grade north of King Ed was never likely: even if the disruption wasn't a deal breaker, the elevation would be.
If the Purple Line would be useless to Vancouver commuters, then a consolidation at Waterfront would be useless to anybody east of Commercial. Not much point in consolidation when each Narrows serves different catchments entirely - and having Canada Line riders switch east on a 41st Line to get to the North Shore would ease the hypothetical crunch in the Broadway/Downtown stretch.
Why wouldn't TransLink bring the Park Royal extension to the SeaBus if it were possible? And why would they drag the tunnel west out into the deeper part of the channel? It's a general alignment, but most likely the optimal one.
|
And the cut-and cover distruption was?
Note that South of King Ed is still half the entire line.
Why is elevated on the median of Lougheed acceptable, but not on Cambie?
OK, this is talking about 2 different things.
I was partially playing devil's advocate as well.
When I talk about the 'mid-harbour' connector, I'm talking about the 'EverBlue' Line in

.
The issue with Purple for Canada Line riders is that it's a pretty big detour, and there's not much outside the densification area immediately around Phibbs- and
definitely nothing east of Phibbs.
http://www.metrovancouver.org/services/r...cel-basedLandUseDesignationMapPoster.pdf
Quote:
Originally Posted by Migrant_Coconut
It's less about those stations and more about a circle connection to the Canada and Expo at the same time; with two near-empty stations, transfers can skip the CBD altogether and free up space in the "triangle."
Besides, I don't think we want to close down Burrard Station for another two years.
|
What we
really need is some sort of underground walkway to connect Vancouver City Center and Granville if you want to cut congestion on Waterfront. Or the Waterfront Transit hub plan. But the former is probably a better immediate idea.
Plus, Millennium Line extension.