If you require a helicopter to go to the hospital, you will either go the the closest hospital or the hospital with the specialized equipment/doctors you need.

VGH is just seconds away from this site and already has all the equipment you may need.

If you are a bit further out, you will be going to Abbotsford or Surrey Memorial
__________________
i have no idea what's going on
Reply With Quote
     
     
  #782  
Old Posted Dec 31, 2021, 5:34 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,290
Quote:
Originally Posted by djmk View Post
If you require a helicopter to go to the hospital, you will either go the the closest hospital or the hospital with the specialized equipment/doctors you need.

VGH is just seconds away from this site and already has all the equipment you may need.

If you are a bit further out, you will be going to Abbotsford or Surrey Memorial
Not necessarily. VGH and St Paul's aren't identical - some services are unique to one of the hospitals. For example, St Paul's carries out kidney transplants; VGH doesn't. Organ donations are very time sensitive, and right now have to arrive by road at St Paul's. If they've come from a donor elsewhere, they can be brought by air to Waterfront, and then have to be transferred to the hospital by road.

In a major incident generating multiple casualties, VGH could find their ICU full, but St Paul's might still have capacity. Bringing the injured directly to the hospital makes much more sense than adding in a road transfer as well.

Royal Columbian in New Westminster also has a helipad.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #783  
Old Posted Dec 31, 2021, 6:31 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,682
VGH and RCH are the Level 1 trauma centres for Metro Vancouver. If you get shot/stabbed in the middle of the night this is where you will go. It's not only about helipads, but certain staffing levels 24/7 and preparations for immediate life and death trauma response.

It's feasible they will shift this from VGH to SPH in the future, or as a backup, or have 2 in Vancouver.

BC Women's and Children's has the helipad for kids and maternity cases, obviously.

Sometimes more complex cases get flown in from around the province as well as these are the expert centres for BC.
Reply With Quote
     
     
  #784  
Old Posted Dec 31, 2021, 7:06 PM
djh djh is offline
Registered User
 
Join Date: Jul 2003
Location: Vancouver
Posts: 1,977
Quote:
Originally Posted by djmk View Post
If you require a helicopter to go to the hospital, you will either go the the closest hospital or the hospital with the specialized equipment/doctors you need.

VGH is just seconds away from this site and already has all the equipment you may need.

If you are a bit further out, you will be going to Abbotsford or Surrey Memorial
St. Pauls and Women's & Childrens are the two hospitals in Vancouver with maternity wards. If you go into birth and are flown into VGH, they wouldn't be able to help you.
Reply With Quote
     
     
  #785  
Old Posted Feb 23, 2022, 1:54 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,290
Update to Strathcona residents:

Excavation, which has been ongoing since November, is expected to continue through May. Through at least March, it will continue 24 hours a day during the week in order to reduce traffic congestion, carbon emissions and the overall duration of the work.

In March, they will tie into the existing storm drain, which will involve running lines under Prior St. As with recent BC Hydro work, one lane of traffic will remain open in each direction throughout.

Structural work will begin in late February, with the installation of the first of four tower cranes. Concrete will start arriving soon after, using the National gate and the same circuit strategy to minimize noise. Main St. and Terminal will remain the preferred access routes. There are currently around 130 workers on site. That number will rise to 500+ by fall.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #786  
Old Posted Feb 23, 2022, 2:38 AM
Sheba Sheba is online now
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,594
Quote:
Originally Posted by WarrenC12 View Post
VGH and RCH are the Level 1 trauma centres for Metro Vancouver. If you get shot/stabbed in the middle of the night this is where you will go. It's not only about helipads, but certain staffing levels 24/7 and preparations for immediate life and death trauma response.


When my friend was injured in a hit and run (in Richmond) they took him to VGH due to it being Level 1 trauma. There's a list of BC hospitals by what level they're in here (under Trauma Care In BC).

Since the pandemic I wouldn't be surprised to see some of them upgrade to move up a level but I can't see many moving up to Level 1 due to the cost of keeping a hospital fully staffed 24/7.
Reply With Quote
     
     
  #787  
Old Posted Feb 23, 2022, 4:36 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by Changing City View Post
Not necessarily. VGH and St Paul's aren't identical - some services are unique to one of the hospitals. For example, St Paul's carries out kidney transplants; VGH doesn't. Organ donations are very time sensitive, and right now have to arrive by road at St Paul's. If they've come from a donor elsewhere, they can be brought by air to Waterfront, and then have to be transferred to the hospital by road.

In a major incident generating multiple casualties, VGH could find their ICU full, but St Paul's might still have capacity. Bringing the injured directly to the hospital makes much more sense than adding in a road transfer as well.

Royal Columbian in New Westminster also has a helipad.
Yes. In other words exactly what he said.
Reply With Quote
     
     
  #788  
Old Posted Feb 23, 2022, 9:57 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,743
Yeah the hole is getting pretty deep now.

Video Link
Reply With Quote
     
     
  #789  
Old Posted Mar 15, 2022, 7:46 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,290
The first tower crane is up. Presumably this has now moved beyond 'proposed'?
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #790  
Old Posted Mar 18, 2022, 9:34 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
concrete is now being poured. crane #1 is up at the SW Corner of the excavation.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #791  
Old Posted Mar 18, 2022, 9:55 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,743
Seems like they are a bit behind schedule but we'll see a second crane soon. Interesting it will take another 10 months for the parking levels to be completed. I guess there's a lot of excavation work left as well and maybe a lot of piling work.

Quote:
The first two cranes are expected to be installed in February, with the rest (for a total five) to follow throughout the spring.
By the end of 2022, concrete slabs will be placed for each floor of the 4-level parkade. Once that’s done, the construction crews can start to build the structure of the future 11-storey hospital in 2023!
https://thenewstpauls.ca/2021-wrap-up/

And a new webcam view for us. Someone email them and ask them for links for the other cams



https://webcampub.multivista.com/index.c...UID=47B9FB5D-4B52-406E-82DE-2FCBF52F03B5
Reply With Quote
     
     
  #792  
Old Posted Mar 18, 2022, 11:43 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
should this be U/C now?
Reply With Quote
     
     
  #793  
Old Posted Mar 20, 2022, 3:18 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,716
Quote:
Originally Posted by VancouverOfTheFuture View Post
should this be U/C now?
By any rational interpretation, yes. However, my recollection of SSP forum rules/convention requires that foundations are poured and vertical structure is being built for it to technically be considered 'under construction'.

Excavation on its own doesn't count. I can dig a hole in my garden but it doesn't mean I'm putting an addition on the house.

I think that this rule originally arose when a lot of projects in the International Village neighbourhood had excavation occur and then sat dormant as small lakes for years.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #794  
Old Posted Mar 20, 2022, 9:56 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Cranes up so at least a part of the foundation of structure has been poured
Reply With Quote
     
     
  #795  
Old Posted Mar 20, 2022, 10:25 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,198
Once part of the structure is above grade.
Reply With Quote
     
     
  #796  
Old Posted Mar 21, 2022, 12:34 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by SFUVancouver View Post
By any rational interpretation, yes. However, my recollection of SSP forum rules/convention requires that foundations are poured and vertical structure is being built for it to technically be considered 'under construction'.
i see its U/C now. thats good.

i always thought it was done by a crane going up thats why i mentioned it with the crane pics.
Reply With Quote
     
     
  #797  
Old Posted Apr 2, 2022, 1:27 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
do we know when National Street will return to 2 lanes from the current 1 lane with alternating traffic with a temp traffic signal?
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #798  
Old Posted Apr 2, 2022, 2:22 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,743
Quote:
Originally Posted by hollywoodnorth View Post
do we know when National Street will return to 2 lanes from the current 1 lane with alternating traffic with a temp traffic signal?
The January 2022-Octobe 2023 slide said it was supposed to be open at this point. With a full road closure prior to this.

https://thenewstpauls.ca/app/uploads/2021/03/Community-Open-House-full-PP-March-18.pdf

Maybe once they finish civil works/getting the access road built it will reopen.
Reply With Quote
     
     
  #799  
Old Posted Apr 10, 2022, 5:20 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,743
Update from St Pauls



Quote:
Majority of excavation is wrapping up this spring. PCL Construction has dug to the glacial till to ensure the new hospital is built on stable ground to help it stand up to earthquakes and floods.
Anchoring the secant wall will finish in 2022. This underground waterproofed perimeter surrounding the hospital’s foundation helps protect it from erosion, groundwater, floods, and rising sea levels.
Four more cranes will arrive on site. Trucks are delivering concrete used to pour floors and pillars for each level of the hospital. PCL will start with the 4-level underground parkade and work their way up. By the end of 2022, you might even see the main floor of our new hospital peek out from the ground.
Road and utility infrastructure work is ongoing. Work is being done to lay the necessary underground infrastructure for water, sewer, hydro, telecommunication and gas lines, as well as new roads, sidewalks, and parkade ramps.
https://thenewstpauls.ca/kicking-off-building-phase/

Seems like a new animation as well

Video Link


And for anyone who missed it here's the 2nd webcam

https://webcampub.multivista.com/index.c...UID=47B9FB5D-4B52-406E-82DE-2FCBF52F03B5

And usually a 4K feed here

https://www.youtube.com/channel/UCNDVyL_iDsXuZmm_dxllkbQ

Last edited by jollyburger; Apr 10, 2022 at 5:37 AM.
Reply With Quote
     
     
  #800  
Old Posted Apr 10, 2022, 4:18 PM
zahav zahav is offline
Registered User
 
Join Date: Apr 2009
Location: Vancouver
Posts: 2,052
I thought for noe they were only doing site prep, didn't realize the DP had been issued already allowing them to start building construction, but looks like it was in February:

The Development Permit Board approved this application, and a Development Permit was issued on February 11, 2022.

So the design is final. Not crazy about it but I love everything single other thing about this project; the location, the scale, the resulting spinoff building and precinct it's hoping to create, the brand new top of the line hospital facilities, the fact that a massive chunk of downtown will now be home to skyscrapers, not to mention the massive funds from the downtown land sale made this project incredibly cheap from a tax payer perspective. To get something this major without a huge commitment from government is pretty amazing. Of course they are still spending a lot, but it's a bargain considering the land was existing and the old site was worth a fortune. Really looking forward to seeing this rise, probably the project I'm most excited to see come to fruition
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:47 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.