Possession has slipped from Q1 2025 to Q4 2025 since the update earlier this year, and despite saying 'Summer 2024' on their website.


Source.

They've also updated their website with some new construction photos.


Reply With Quote
     
     
  #1042  
Old Posted Oct 15, 2021, 7:08 PM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
Encouraging signs that its actually gonna get built at the very least
Reply With Quote
     
     
  #1043  
Old Posted Oct 15, 2021, 11:09 PM
McDonald's Racoon McDonald's Racoon is offline
 
Join Date: May 2021
Posts: 163
Saw a few excavators on site. Might be for the LRT or the pedestrian bridge but it's nice to see things happening.
Reply With Quote
     
     
  #1044  
Old Posted Oct 16, 2021, 6:06 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is online now
 
Join Date: Apr 2021
Posts: 1,692
I walked by there earlier today. I can just about assure everyone that the vehicles on site are limited to the overpass and possibly supplementing the Bayview platform. 2 Taggart excavators and a handful of small trucks.

No piling equipment or anything like that yet.
Reply With Quote
     
     
  #1045  
Old Posted Oct 21, 2021, 2:38 AM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Everything going on today:
DJI_0597 by harley613, on Flickr
DJI_0598 by harley613, on Flickr
DJI_0600 by harley613, on Flickr
Reply With Quote
     
     
  #1046  
Old Posted Oct 25, 2021, 3:34 PM
capsilon1 capsilon1 is offline
 
Join Date: Oct 2021
Posts: 2
Its pretty amazing to see what is going on in Ottawa. Aside from Toronto and Montreal, the growth for a city this size is amazing. I know that this project is around the corner. They have worked very hard to climb through all the obstacles. The seemed to have crossed most of them. Keep in mind though, I remember them clearing the land 5 years ago. I saw a bunch of bulldozers the other day. I hope they start soon, as I think this will be gateway to whole bunch of other interesting venues and things to do around town.
Reply With Quote
     
     
  #1047  
Old Posted Oct 25, 2021, 4:45 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,719
Quote:
Originally Posted by capsilon1 View Post
Its pretty amazing to see what is going on in Ottawa. Aside from Toronto and Montreal, the growth for a city this size is amazing. I know that this project is around the corner. They have worked very hard to climb through all the obstacles. The seemed to have crossed most of them. Keep in mind though, I remember them clearing the land 5 years ago. I saw a bunch of bulldozers the other day. I hope they start soon, as I think this will be gateway to whole bunch of other interesting venues and things to do around town.
Welcome to the forum!
Reply With Quote
     
     
  #1048  
Old Posted Oct 26, 2021, 7:58 PM
capsilon1 capsilon1 is offline
 
Join Date: Oct 2021
Posts: 2
thx
Reply With Quote
     
     
  #1049  
Old Posted Nov 8, 2021, 5:47 PM
alamgirkhan alamgirkhan is offline
 
Join Date: Jun 2018
Posts: 84
https://interrentreit.com/documents/ip/2021_Q3_IP.pdf

If I’m reading slide 16 correctly, construction won’t begin until at least the first half of 2023. I’m losing interest in this project.
Reply With Quote
     
     
  #1050  
Old Posted Nov 8, 2021, 6:10 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by alamgirkhan View Post
https://interrentreit.com/documents/ip/2021_Q3_IP.pdf

If I’m reading slide 16 correctly, construction won’t begin until at least the first half of 2023. I’m losing interest in this project.
I blame Stage 2 Trillium. They may not want to start anything until they know SNC will no longer need to use their site as a staging area.
Reply With Quote
     
     
  #1051  
Old Posted Nov 8, 2021, 6:44 PM
DTcrawler DTcrawler is offline
 
Join Date: Feb 2019
Posts: 998
And to think Melnyk (supposedly) cancelled the Lebreton project over this development...
Reply With Quote
     
     
  #1052  
Old Posted Nov 8, 2021, 6:59 PM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
Quote:
Originally Posted by alamgirkhan View Post
https://interrentreit.com/documents/ip/2021_Q3_IP.pdf

If I’m reading slide 16 correctly, construction won’t begin until at least the first half of 2023. I’m losing interest in this project.
Just trying to be optimistic here although im starting to lose hope as well, but technically First half of 2023 could mean only a year from now
Reply With Quote
     
     
  #1053  
Old Posted Nov 8, 2021, 7:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by DTcrawler View Post
And to think Melnyk (supposedly) cancelled the Lebreton project over this development...
Arena would be completed by now, and for far cheaper than what it could be built today. A few towers would have been built. No competition from 900 Albert thus far.
Reply With Quote
     
     
  #1054  
Old Posted Nov 8, 2021, 7:03 PM
SL123 SL123 is offline
 
Join Date: Mar 2021
Posts: 1,980
Quote:
Originally Posted by J.OT13 View Post
I blame Stage 2 Trillium. They may not want to start anything until they know SNC will no longer need to use their site as a staging area.
Yeah they've also use their site for Trillium path detour of detour. there seem to be A detour FOR the previous detour every time i bike there
Reply With Quote
     
     
  #1055  
Old Posted Nov 11, 2021, 6:20 AM
originalmuffins originalmuffins is offline
 
Join Date: Jun 2018
Posts: 877
Quote:
Originally Posted by DTcrawler View Post
And to think Melnyk (supposedly) cancelled the Lebreton project over this development...
God, I hate Melnyk so much right now. What a waste of what would've transformed the lens of the city. I wish he never won the proposal because all he did was waste everyone's time.
Reply With Quote
     
     
  #1056  
Old Posted Nov 11, 2021, 2:11 PM
daud's Avatar
daud daud is offline
 
Join Date: Jun 2012
Posts: 764
Quote:
Originally Posted by originalmuffins View Post
God, I hate Melnyk so much right now. What a waste of what would've transformed the lens of the city. I wish he never won the proposal because all he did was waste everyone's time.
Historically I have despised Mr. Melnyk as owner of the senators and the way this Lebreton project was mangled. Because I really really wanted to see it happen. But...

If I was Mr. Melnyk, and I was going to drop a wad of my life savings to build an arena and participate in a revenue sharing agreement with a developer, I would not want the developer to build a property next to the site, outside the agreement and — up 5 years worth of demand before a shovel hits the ground at lebreton.

I think this was a business deal that went awry and both sides had their positions. The more I reflect, the more I understand his side. He still may be batsh*t crazy, and his asks may have been unrealistic but at the same time, I'd be pissed if my partner beat me to the cookie jar and took half the jar for himself before sharing.
Reply With Quote
     
     
  #1057  
Old Posted Nov 11, 2021, 2:50 PM
phil235's Avatar
phil235 phil235 is offline
 
Join Date: Sep 2006
Posts: 4,620
Quote:
Originally Posted by daud View Post
Historically I have despised Mr. Melnyk as owner of the senators and the way this Lebreton project was mangled. Because I really really wanted to see it happen. But...

If I was Mr. Melnyk, and I was going to drop a wad of my life savings to build an arena and participate in a revenue sharing agreement with a developer, I would not want the developer to build a property next to the site, outside the agreement and — up 5 years worth of demand before a shovel hits the ground at lebreton.

I think this was a business deal that went awry and both sides had their positions. The more I reflect, the more I understand his side. He still may be batsh*t crazy, and his asks may have been unrealistic but at the same time, I'd be pissed if my partner beat me to the cookie jar and took half the jar for himself before sharing.
Not sure how Melnyk thought that Trinity (or anyone else for that matter) was going to stop building during the many years it would take to develop Lebreton. It clearly wasn’t part of the agreement, and frankly while he would be competing for sales with any project downtown, more development in the immediate area could just as easily be helpful to his project.

I think the whole 900 Albert argument is a red herring that he has thrown out to distract from the real reasons he wanted out of the deal - that a) Leeder made a deal that he didn’t like while he was in hospital and b) it became clear that he wasn’t getting public money for the arena.
Reply With Quote
     
     
  #1058  
Old Posted Nov 11, 2021, 7:38 PM
daud's Avatar
daud daud is offline
 
Join Date: Jun 2012
Posts: 764
Quote:
Originally Posted by phil235 View Post
Not sure how Melnyk thought that Trinity (or anyone else for that matter) was going to stop building during the many years it would take to develop Lebreton. It clearly wasn’t part of the agreement, and frankly while he would be competing for sales with any project downtown, more development in the immediate area could just as easily be helpful to his project.

I think the whole 900 Albert argument is a red herring that he has thrown out to distract from the real reasons he wanted out of the deal - that a) Leeder made a deal that he didn’t like while he was in hospital and b) it became clear that he wasn’t getting public money for the arena.
you are definitely right on #1 but I do think it was because of trinity in particular. This article outlines the fracture and points to trinity development in particular:

https://www.cbc.ca/news/canada/ottawa/senators-eugene-melnyk-sues-trinity-1.4918094

Quote:
According to the claim, which hasn't been tested in court, "the joint venture failed because of an egregious conflict of interest on the part of Trinity and its principal, John Ruddy."

CSMI claims the conflict arose when Trinity began developing an adjacent property at 900 Albert St. "in direct competition" with the LeBreton project.
As for point 2 you could also be correct.

the devil is in the details but I think 900 albert was part of the problem.
Reply With Quote
     
     
  #1059  
Old Posted Dec 16, 2021, 2:51 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
 
Join Date: Nov 2005
Posts: 9,255
Minor update - they are renewing their permit to take water for construction dewatering..
https://ero.ontario.ca/notice/019-4766
Reply With Quote
     
     
  #1060  
Old Posted Dec 26, 2021, 4:28 AM
brickpreviews brickpreviews is offline
 
Join Date: Dec 2021
Posts: 5
Is this going to be rentals only or condos as well?

Quote:
Addressing the growing demand for rental units in Ottawa, 1,300 units will be included in the residential component of the development.
Make me think it is rentals only. Sad
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 5:20 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.