Drew Dilkens went to
Queen's Park this week to push for an expansion of E.C. Row (widening and new interchange at Banwell), as well as a new 401 interchange at Lauzon and the incorporation of the Ojibway Prairie Provincial Nature Reserve into the proposed National Urban Park.
It looks like much of the E.C. Row corridor is capable of being expanded to 4 lanes in each direction, but I can't see it requiring any more than 3 in each direction for the foreseeable future. Regardless, planning for this should begin, but it shouldn't be a priority. As for the Banwell interchange, that is much needed and should be prioritized. They should also begin looking into interchanges at Manning and Patillo, which I believe have already been planned in the past. I also believe that the 401/Lauzon interchange should be prioritized as well, it would be nice to have that coincide with the Lauzon/CR42 realignment.
I'm also really happy to see a big push for the national urban park, and would like to see the Ojibway Prairie included as part of the plan. Having a major, extensive urban park would be a huge boon to a city like Windsor, where park space is super limited as it is.