From the MOU,
Quote:
In all aspects of the Project, including design and construction, Metrolinx will, or
will cause Project Co to, take all reasonable efforts to minimize impacts to trees
and parks and City lands. The Parties acknowledge that tree replacement or
compensation to the City in lieu thereof is, at minimum, in accordance with the
provisions set out in the City’s by-laws or standards applicable to tree
replacement. Metrolinx will consult with the City in accordance with the City’s bylaws
or standards applicable to a tree replacement plan prior to any tree removal, provided
that pending the determination of a replacement plan or compensation
in lieu thereof, Metrolinx may at its risk remove such trees as may be required to
facilitate construction of the Project. Nothing in this Section 10.13 derogates from
Metrolinx’s expropriation authority including with respect to trees owned by the
City or third parties.
|
Quote:
Metrolinx will pay for the repair or replacement of any and all roads, sidewalks
trees, parks, plants and streetscape generally damaged by the Project
(collectively, the “Streetscape”). Any such damaged Streetscape will be restored
or replaced on a like for like basis to a standard commensurate in cost with the
cost of repairing and replacing comparable streetscape in the vicinity of the
Project at the date of this Agreement, as agreed to by the City and Metrolinx,
acting reasonably during the Pre-Market or the In-Market Period in sufficient time
to enable it to be included in the PSOS (the “Streetscape Standard”). Any
upgrades from the Streetscape Standard requested by the City will constitute
Additional Infrastructure and be dealt with in accordance with the terms of this
Agreement applicable to Additional Infrastructure.
|
|