Quote:
Originally Posted by Truenorth00
Those Canadian citizens (through their governments) should have paid to buy or maintain the track, if it was that valuable. They didn't. Clearly not as valuable to the average citizen as you suggest.
Contrast that with Metrolinx who has actually purchased a whole lot of track in the GGH for GO and is now investing further capital to fully grade separate and electrify those corridors.
|
The average Canadian citizen does not have any knowledge of the rail network now or before and the traffic flows that on each of the lines. Unfortunately most of them want pavement, but that may change with climate change. Even the towns along the route in the Ottawa Valley wanted the railway out of town for their own co called local benefit. The local MP, Conservative Cheryl Gallant was in favour of getting rid of the railways in the valley. There was an agreement between CN and CP to operate a joint venture between Montreal and Sudbury but CN scuttled the deal because they did not want to operate it with unionized labour. There was sufficient traffic between the 2 railways to have a profitable operation with maintenance and capital costs focused only on one route.
The effect of this is to increase congestion on the Lakeshore route and delay Via trains so that their average speed is less than it was in the 1980's and more unreliable. This is after the Harper government spent 900$ million to triple track part of the route. We could have taken part of that money and relaid the tracks in the Valley, forced the railways to maintain some reasonable train service and avoid the blockades on the Lakeshore route put in place by the Mohawks of Tyendinaga every time they want to protest anything. The only reroute for freight trains is to use the CP route as they do not run through the reservation but it is only single track.
Other routes which have impacted the rail network in a similar fashion are;
1) the Newmarket sub through Barrie and Orilla where the few passenger trains that formerly used the route are stuck in traffic on the Bala sub on the east side of Lake Simcoe,
2) the BCR route where CN has downgraded the route and the operating employees that were certified on the route have either retired, quit, laid off or been reassigned to different terminals so it is not possible for CN to quickly divert trains to Vancouver via Prince George. Although the track profile might not allow for the long trains that CN runs on its mainline it could change the size of trains on the BCR. CN has done this for short term gain but until the route through the Fraser Canyon is rerouted to avoid the ever present mudslides, rock slides and avalanches they will always be subject to disruptions.
3) Ste Foy QC where the route along the south shore has be cut. This is mostly due to the federal government cutting back on Via service to the Gaspe and the Maritimes.
You cannot expect citizens in different parts of the country to be aware of these actions allowed by the federal government or to feel they have any vested interest in protecting these routes, which as a country we should have to protect the redundancy of the network. This is particularly important as long as railways are transporting important exports and imports not only to/from Canada but also goods transiting Canada destined to the US.