HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #15461  
Old Posted Nov 28, 2021, 6:21 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
I would think that running a train on a dedicated ROW is less demanding than a tram on a street, since stopping and starting usually presents more challenges than staying in motion. I’m not really buying the argument that we’re stretching the capabilities of the vehicle, more like the capabilities of the train haven’t lived up to standard because of poor engineering, design and manufacturing. So, yeah, they’re lemons. We shouldn’t be purchasing more of these without guarantees that the new ones will be significantly better, otherwise shop around for alternatives.
     
     
  #15462  
Old Posted Nov 28, 2021, 6:37 PM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by swimmer_spe View Post
Can you explain why the Skytrain isn't reporting issues? They have been fully automated from the start. This isn't new technology. Why not blame the humans involved? Why not blame shoddy workmanship? The technology is proven. Those Boeing crashes were all human error to a new system, not the system in error.
Skytrain did have a bunch of issues when it was first deployed in the late 80’s (I remember lots of complaints about squeezing wheels on corners for one). Maybe not as many as the O-train has, but to suggest that it never has any issues is not true. They have had a lot more time to work out the kinks.
     
     
  #15463  
Old Posted Nov 28, 2021, 9:36 PM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by thewave46 View Post
They have been.

Apparently 'proven technology' and 'good maintenance' were not part of Alstom's process for the Confederation Line.

It's more frustrating to me as I've seen repeated examples of 'This should work properly because it's proven that we can do this reliably' in many modern facets of life and yet somehow end up with stuff that doesn't work.
The problem is, no one wants to admit they made a mistake. No one wants to say that there is a problem unless it can be placed on something other than shoddy work.

Quote:
Originally Posted by roger1818 View Post
Skytrain did have a bunch of issues when it was first deployed in the late 80’s (I remember lots of complaints about squeezing wheels on corners for one). Maybe not as many as the O-train has, but to suggest that it never has any issues is not true. They have had a lot more time to work out the kinks.
How many derailments in their first 5 years?
     
     
  #15464  
Old Posted Nov 28, 2021, 10:08 PM
Truenorth00 Truenorth00 is offline
 
Join Date: May 2017
Posts: 29,131
Quote:
Originally Posted by Kitchissippi View Post
I would think that running a train on a dedicated ROW is less demanding than a tram on a street, since stopping and starting usually presents more challenges than staying in motion. I’m not really buying the argument that we’re stretching the capabilities of the vehicle, more like the capabilities of the train haven’t lived up to standard because of poor engineering, design and manufacturing. So, yeah, they’re lemons. We shouldn’t be purchasing more of these without guarantees that the new ones will be significantly better, otherwise shop around for alternatives.
Yes and no. Calling it a lemon is still a tad premature. Though, getting closer....

I wonder, though if these LRVs are facing issues because they are running at higher speeds and frequencies than normally intended for a tram. It's not like trams regularly hit 70 kph when running on the street.
     
     
  #15465  
Old Posted Nov 28, 2021, 11:12 PM
Harley613's Avatar
Harley613 Harley613 is offline
 
Join Date: Jun 2009
Posts: 6,896
Quote:
Originally Posted by Truenorth00 View Post
Yes and no. Calling it a lemon is still a tad premature. Though, getting closer....

I wonder, though if these LRVs are facing issues because they are running at higher speeds and frequencies than normally intended for a tram. It's not like trams regularly hit 70 kph when running on the street.
The Citadis Spirit is Tram-like but it's specifically designed as a hybrid vehicle designed for both street operations and high speed metro/suburban light rail. It's rated up to 105 km/h. The door and electrical issues had nothing to do with speeds. The wheel and axle issues are the big problem here. Considering the rated speed the vehicles should be able to handle the Confederation Line without issue. I blame the wheel and axle issues on the fact that we are the launch customer of a new model and bugs will inevitably occur in any new model. I just hope they can iron them out soon.
     
     
  #15466  
Old Posted Nov 29, 2021, 2:17 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
Proper engineering should figure out appropriate margins from points of failure. If the Citadis Spirit is rated at 105 kph it should capable of even going at least +10%. The trains also don’t couple/uncouple easily as promised, to the point that they’ve given up on this feature that was supposed to save energy and wear and tear..

Lemon : something (such as an automobile) that is unsatisfactory or defective. The definition seems to fit the current situation. There’s nothing that says lemons can’t be fixed
     
     
  #15467  
Old Posted Nov 29, 2021, 6:20 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,813
My understanding, when a car is considered a lemon, it usually has a myriad of problems that never seem to get fixed properly. Or, one problem leads to another and another and so on.
     
     
  #15468  
Old Posted Nov 29, 2021, 7:08 PM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by lrt's friend View Post
My understanding, when a car is considered a lemon, it usually has a myriad of problems that never seem to get fixed properly. Or, one problem leads to another and another and so on.
I think this line would qualify for being called a lemon then.
     
     
  #15469  
Old Posted Dec 1, 2021, 9:16 PM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by swimmer_spe View Post
I have several friends who work for the federal government. Some are pretty high up. They have been told not to expect a physical office in a building going forward. Since Ottawa is a big government town, I don't see how what you say would be true.
It is (going to prove to be true) because in almost every other society remotely comparable to Canada, once people were given the opportunity to go back to working at work, they went to work at work.

And also because private-sector employers have noticed the productivity impact. The public sector is a little slow.

The death of the office is greatly, greatly exaggerated.
     
     
  #15470  
Old Posted Dec 1, 2021, 9:48 PM
Truenorth00 Truenorth00 is offline
 
Join Date: May 2017
Posts: 29,131
Quote:
Originally Posted by Uhuniau View Post
The death of the office is greatly, greatly exaggerated.
Perhaps.

But our transit systems (in North America) aren't so much designed around getting commuters to work, at they are designed around specifically getting commuters to work at specific travel peaks. Our system might look different if it's not sized around peak travel to the core.
     
     
  #15471  
Old Posted Dec 1, 2021, 9:52 PM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Uhuniau View Post
It is (going to prove to be true) because in almost every other society remotely comparable to Canada, once people were given the opportunity to go back to working at work, they went to work at work.

And also because private-sector employers have noticed the productivity impact. The public sector is a little slow.

The death of the office is greatly, greatly exaggerated.
If what you are saying is to be believed, we need to expect a massive construction boom caused by the shear number of government workers who, if were told to work in an office, would have no spot for them. Remember, the government has hired more people to deal with backlogs in many ministries. Those people never had an office space to begin with.

If anything, the government can use carbon targets as an excuse to keep them home. Anyone who thinks the government cars about productivity has never dealt with the government.
     
     
  #15472  
Old Posted Dec 2, 2021, 12:22 AM
Nowhere Nowhere is offline
 
Join Date: May 2018
Posts: 228
Quote:
Originally Posted by Uhuniau View Post
It is (going to prove to be true) because in almost every other society remotely comparable to Canada, once people were given the opportunity to go back to working at work, they went to work at work.

And also because private-sector employers have noticed the productivity impact. The public sector is a little slow.

The death of the office is greatly, greatly exaggerated.
Transport Canada already announced that they're permanently switching to remote working, so I wouldn't be surprised if other government departments follow.

If people end up working 2-3 days a week at the office, they're probably not going to bother to buy a monthly transit pass and they might simply end up driving to downtown for these 2-3 days with the extra parking now available because of remote working.

No, the office will not die entirely, but OC Transpo needs to find a new business model than 9-5 downtown office jobs workers.
     
     
  #15473  
Old Posted Dec 2, 2021, 1:23 PM
DarthVader_1961 DarthVader_1961 is offline
 
Join Date: Jun 2009
Posts: 480
Quote:
Originally Posted by Nowhere View Post
Transport Canada already announced that they're permanently switching to remote working, so I wouldn't be surprised if other government departments follow.

If people end up working 2-3 days a week at the office, they're probably not going to bother to buy a monthly transit pass and they might simply end up driving to downtown for these 2-3 days with the extra parking now available because of remote working.

No, the office will not die entirely, but OC Transpo needs to find a new business model than 9-5 downtown office jobs workers.
I worked at the CRA offices in bells corners.. we cleaned out our offices in August. We are now working from home permanently…. The buildings we cleared out will be converted to temporary offices and meeting rooms
     
     
  #15474  
Old Posted Dec 2, 2021, 1:55 PM
Truenorth00 Truenorth00 is offline
 
Join Date: May 2017
Posts: 29,131
Quote:
Originally Posted by Nowhere View Post
Transport Canada already announced that they're permanently switching to remote working, so I wouldn't be surprised if other government departments follow.

If people end up working 2-3 days a week at the office, they're probably not going to bother to buy a monthly transit pass and they might simply end up driving to downtown for these 2-3 days with the extra parking now available because of remote working.

No, the office will not die entirely, but OC Transpo needs to find a new business model than 9-5 downtown office jobs workers.
I dunno if commuting by transit to the core disappears for 2-3 days per week. Parking is still expensive. And driving in the core is annoying. And people are far less likely to mind putting up with a bus, if the bus is less crowded and only need to do so a few times per week. Also, in the long run, this provides a great excuse to redevelop every parking lot in the downtown core. It was heading that way. But now that parking generates less revenue, the push is likely to be even stronger.

I do agree though, that the system was optimized for peak travel to the core. And going forward, OC Transpo needs to become a much more non-commuter system, focusing on local transport. Higher bus frequencies. And a lot less rail expansion. Stage 3 will need to be scaled back to Fallowfield and Terry Fox, focused on cutting bus mileage through the greenbelt. Beyond that, all capital needs to be focused on improving local bus services.


Quote:
Originally Posted by DarthVader_1961 View Post
I worked at the CRA offices in bells corners.. we cleaned out our offices in August. We are now working from home permanently…. The buildings we cleared out will be converted to temporary offices and meeting rooms
There's also the possibility of a different posture. For example, the feds could setup coworking spaces throughout the city for all federal employees. Less travel. Book as needed. This way departmental offices and meeting rooms are kept strictly for departmental needs. Will add, this is a good opportunity for the federal government to update its ridiculously outdated identification and key card infrastructure to something closer to FIPS 201 or CAC in the US, combining and ID, PKI card and two factor authentication for facility access.
     
     
  #15475  
Old Posted Dec 2, 2021, 2:17 PM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by Nowhere View Post
If people end up working 2-3 days a week at the office, they're probably not going to bother to buy a monthly transit pass and they might simply end up driving to downtown for these 2-3 days with the extra parking now available because of remote working.
I agree they won't buy a monthly transit pass if they are working 2-3 (or even 4) days a week, but equally I don't think they will buy an even more expensive monthly parking pass either. Given that, by looking at Parkopedia, downtown parking is still expensive over 1½ years after pandemic WFH started, I don't see downtown parking becoming cheap any time soon. While some may make the switch to driving, I think most will still take the bus, but will switch to using their Presto e-Purse rather than buying a monthly pass.

Quote:
Originally Posted by Nowhere View Post
No, the office will not die entirely, but OC Transpo needs to find a new business model than 9-5 downtown office jobs workers.
WFH or not, OC Transpo needs to do a better job of supporting those who aren't using transit to go downtown for work.
     
     
  #15476  
Old Posted Dec 2, 2021, 3:12 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,813
Quote:
WFH or not, OC Transpo needs to do a better job of supporting those who aren't using transit to go downtown for work.
I totally agree, but do we see any action on this front? I don't think so. We need a totally re-imagined transit system. Not every route needs to take us only to the Confederation Line. There needs to be more parallel routes.

We seem so committed to a Confederation Line and consequently a downtown focus that we can't see how transportation need has changed. This was changing long before Line 1 opened but the pandemic has accelerated these changes. OC Transpo has long focused on the public service as a cash cow and mostly ignored everybody else. It is time for this to change.

We need to see new routes, better frequency including better frequency over longer hours. Other cities have succeeded in attracting new ridership this way. The city has lost a lot when it got so focused on capacity transit planning over the last 10 years and forgot the need for innovation. The Confederation Line was the focus and the innovation but that was never going to be enough. Line 1 became the tail wagging the dog, so we forgot the need to look at the transit network as a whole and how people were to get around the city when Line 1 was not going to be the destination. The end result is longer trip times for non-downtown trips and too many transfers.
     
     
  #15477  
Old Posted Dec 10, 2021, 8:48 PM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,102
Just sayin'.... "permanent" isn't necessarily permanent.
     
     
  #15478  
Old Posted Dec 10, 2021, 11:05 PM
DarthVader_1961 DarthVader_1961 is offline
 
Join Date: Jun 2009
Posts: 480
Noticed that the coffee shop at Hurdman still has not opened… any idea what’s wrong?
     
     
  #15479  
Old Posted Dec 11, 2021, 1:57 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
 
Join Date: Apr 2021
Posts: 1,690
Quote:
Originally Posted by DarthVader_1961 View Post
Noticed that the coffee shop at Hurdman still has not opened… any idea what’s wrong?
Good question... I feel like every time I pass through Rideau the shop there is also closed.

General incompetence and buffonery?
     
     
  #15480  
Old Posted Dec 11, 2021, 2:18 AM
OCCheetos OCCheetos is offline
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by DarthVader_1961 View Post
Noticed that the coffee shop at Hurdman still has not opened… any idea what’s wrong?
I doubt they're in any rush to open given the state of transit ridership. Same with Tunney's.

Quote:
Originally Posted by ponyboycurtis View Post
Good question... I feel like every time I pass through Rideau the shop there is also closed.

General incompetence and buffonery?
They have regular hours, when are you usually passing through..?
M-F: 7-6
S: 8-5
S:10-4

I've gotten several coffees there over the last few weeks.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:54 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.