HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #6  
Old Posted Nov 26, 2021, 12:04 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,529
Here are some updated renderings from the UDRP Review (Oct 2021)

http://webcast.ottawa.ca/plan/All_Image%...u%20UDRP%20Presentation%20Oct%202021.PDF

Summary of Improvements in Response to Informal UDRP Review
  • Reduced building podium from nine (9) to six (6) storeys;
  • Reduced primary podium expression from six (6) to five (5) storeys;
  • Removed two-storey amenity component to direct emphasis to the transition from podium to tower and emphasize Mainstreet element interfacing with public realm;
  • Removed diagonal tower element to simplify the design and promote verticality;
  • Removed asymmetrical window pattern along south elevation to maintain cohesive architectural language;
  • Reduced cornice overhang above the 7th and 25th floors;
  • Extended Publicly Owned Private space (“POPS”) around the front of building to improve Rideau Street presence; and
  • Reduced tower floorplate from 804 sq. m. to 797 sq. m.

There are also some pretty interesting early design concepts in there that I won't post, as they didn't come to fruition.








Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 3:51 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.