  #5801  
Old Posted Oct 19, 2021, 11:23 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Quote:
Originally Posted by MonctonRad View Post
Estimated cost of new Moncton RCMP station rises to $57 million
New figure up $11 million from previous public estimate
Shane Magee · CBC News · Posted: Oct 15, 2021 7:00 AM AT | Last Updated: 2 hours ago
https://www.cbc.ca/news/canada/new-brunswick/codiac-rcmp-moncton-building-cost-rising-1.6211114

Moncton city council has just voted (7-4) in favour of continuing with the new Codiac RCMP HQ project, despite the inflated costs. Construction should start in the springtime.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5802  
Old Posted Oct 19, 2021, 1:46 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228


CBC article about the greenlighting of the new RCMP HQ includes a new rendering of the facility:



https://www.cbc.ca/news/canada/new-brunswick/moncton-council-rcmp-station-vote-1.6216040
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5803  
Old Posted Oct 19, 2021, 1:53 PM
Mattyyy Mattyyy is offline
Registered User
 
Join Date: Nov 2011
Posts: 361
Quote:
Originally Posted by MonctonRad View Post


CBC article about the greenlighting of the new RCMP HQ includes a new rendering of the facility:



https://www.cbc.ca/news/canada/new-brunswick/moncton-council-rcmp-station-vote-1.6216040
Looks great. It makes sense to proceed - rarely do building costs ever go down. Waiting a few years to do this because of costs could go in their favor, but at the same time it could increase by millions. The reality is it could have cost them 10-15 million less to have built it 3 years ago. Looking forward to construction starting - that end of downtown is seeing a lot of transformation.
Reply With Quote
     
     
  #5804  
Old Posted Oct 20, 2021, 1:53 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Good Huddle article about the Tire Shack Brewing expansion plans:

Tire Shack Brewing Plans Ambitious Expansion In Moncton
Oct 19, 2021by Sam Macdonald
https://huddle.today/tire-shack-brewing-plans-ambitious-expansion-in-moncton/



__________________
Go 'Cats Go
Reply With Quote
     
     
  #5805  
Old Posted Oct 20, 2021, 2:03 PM
Photo1 Photo1 is offline
Registered User
 
Join Date: Sep 2018
Posts: 226
Quote:
Originally Posted by MonctonRad View Post
Moncton city council has just voted (7-4) in favour of continuing with the new Codiac RCMP HQ project, despite the inflated costs. Construction should start in the springtime.
You'd think for that amount of money, and in such a prominent location, the architects could have designed something that wasn't so 🞵🞵🞵🞵🞵🞵 ugly.
Reply With Quote
     
     
  #5806  
Old Posted Oct 20, 2021, 3:42 PM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,280
A new tower crane is now up in downtown Moncton. Looks like they're not messing around here!

Reply With Quote
     
     
  #5807  
Old Posted Oct 20, 2021, 5:27 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,758
Quote:
Originally Posted by BlackYear View Post
A new tower crane is now up in downtown Moncton. Looks like they're not messing around here!

Another Moncton new record for tower cranes. Could we see double digit numbers of tower cranes in the near future?!
__________________
We The People
Reply With Quote
     
     
  #5808  
Old Posted Oct 20, 2021, 5:37 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,955
So Ashford is finishing up their building on the corner of Highfield & Gordon, and starting their new one at Highfield & Campbell. When the new one is completed, I wonder if they'll focus on doing something with their property south of Assomption Place. That's a major sea of asphalt that the city would dearly love to see developed.
Reply With Quote
     
     
  #5809  
Old Posted Oct 20, 2021, 5:40 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Quote:
Originally Posted by josh_cat_eyes View Post
Another Moncton new record for tower cranes. Could we see double digit numbers of tower cranes in the near future?!
Alas our number of tower cranes remains stable at seven. The tower crane at 2251 Mountain Road was recently taken down.

Current distribution:
Downtown - 4
Moncton Northwest - 2
Dieppe - 1

At some point in time, there should be a tower crane at the Tides in Riverview, and I have heard rumours of components of a tower crane on the ground at that new apartment project off Harrisville. I have not driven over to confirm this yet however. Also, the tower crane for that apartment building on Weldon will likely be coming down before the start of winter.

I think our total will remain stable in the 7-8 range.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5810  
Old Posted Oct 20, 2021, 6:13 PM
Buck17 Buck17 is offline
Registered User
 
Join Date: Nov 2014
Posts: 53
The tower crane on Weldon was taken down and moved to Highfield.
Reply With Quote
     
     
  #5811  
Old Posted Oct 20, 2021, 7:24 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,758
There could be another crane added to the northwest when that other set of 3 six storey building are started. Add in St Bernards and Promenade Neuf phase 2 and the Tides and that makes 10. If they put one up at the project in Gunningsville Blvd and the chocolate river station project that will be well into double digits.
__________________
We The People
Reply With Quote
     
     
  #5812  
Old Posted Oct 20, 2021, 11:00 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Here is my (lousy) photo of the tower crane at 51 Highfield. It was dark and rainy at the time, and the image is backlit from blue sky in the distance - oh well.......

__________________
Go 'Cats Go
Reply With Quote
     
     
  #5813  
Old Posted Oct 22, 2021, 5:06 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Bella Promessa (bridal shop) has moved into the Higgins Block (second floor I believe).
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5814  
Old Posted Oct 28, 2021, 1:21 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Interesting article regarding the new RCMP station:

Could another police force use planned Moncton RCMP station? It depends, designer says
Building's size an issue amid discussions of future of RCMP in province
Shane Magee · CBC News · Posted: Oct 28, 2021 6:00 AM AT | Last Updated: 4 hours ago
https://www.cbc.ca/news/canada/new-bruns...Cbp-JDol9mA0qI0d1yCjSE-5-9le_Lc_2KElUOOY

In essence the argument is that a regional municipal force to replace the RCMP would likely be larger, and would require forensic space that is not included in the current building, because the RCMP use the forensic lab in their regional building on McBeath Avenue. The opponents of the project are using this as an excuse to delay or cancel the project until there is additional "clarity" regarding the future of RCMP municipal policing.

My point of view is:

1) the metro area needs a new police HQ anyway. The existing building is too small, and is virtually beyond repair. The project should proceed as is.
2) if the feds decide to get out of municipal policing, then we can look at what needs to be done to support an expanded municipal policing force at that time. In particular, Riverview and Dieppe might prefer to have small satellite policing stations in their own communities to keep policing services closer to their communities and perhaps shorten response times. The entire municipal force does not have to be housed in a single building.
3) simlar with 911 services and forensics, they don't necessarily have to be housed in the main building. They could be located elsewhere in the community (much as is RCMP forensic services right now).

Let's get on with building this new HQ building, it's time............

Finally, in the CBC article is embedded a render of the lobby of the new proposed Codiac RCMP headquarters building:

__________________
Go 'Cats Go
Reply With Quote
     
     
  #5815  
Old Posted Oct 28, 2021, 3:19 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
The T&T is reporting approval for a new 21 unit apartment building (one bedroom and bachelors) on the SW corner of St. George & Steadman Streets in the downtown east end. This is kitty corner to the other recently approved small apartment building currently under construction on the NE corner of this intersection.

Renders available on the PAC document seem to show it will be identical to the building under construction on the NE corner of this intersection:

https://www5.moncton.ca/docs/pac/PAC/October_27_2021/6_b_34_St_George.pdf

__________________
Go 'Cats Go
Reply With Quote
     
     
  #5816  
Old Posted Oct 28, 2021, 4:20 PM
MonctonPerson MonctonPerson is offline
Registered User
 
Join Date: Apr 2021
Posts: 146
Quote:
Originally Posted by MonctonRad View Post
The T&T is reporting approval for a new 21 unit apartment building (one bedroom and bachelors) on the SW corner of St. George & Steadman Streets in the downtown east end. This is kitty corner to the other recently approved small apartment building currently under construction on the NE corner of this intersection.

Renders available on the PAC document seem to show it will be identical to the building under construction on the NE corner of this intersection:

https://www5.moncton.ca/docs/pac/PAC/October_27_2021/6_b_34_St_George.pdf

It's unclear if it will be identical.

Rising Tide purchased the property on the northwestern corner of the intersection where developer Daniel Gautreau had proposed this building and had received approval by PAC.

Since the property was sold to Rising Tide, Gautreau purchased the southeastern corner and resubmitted the building plans for that site.

He owned a couple buildings in the Fleet/Highfield area with a mix of subsidized units and market rent that were sold a year or two ago.
Reply With Quote
     
     
  #5817  
Old Posted Oct 28, 2021, 4:57 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228


Good to know. I wasn’t aware of the change in plans.

It’s good to see two corners of this intersection being developed. It will add density to the neighbourhood, and will provide affordable housing options to the area.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5818  
Old Posted Oct 28, 2021, 7:49 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
According to the T&T, Skyzone will officially reopen at 2 PM tomorrow in their expanded new location in the old Chrysler building on St. George Blvd.

At 28,000 sq ft, it will be the largest indoor play park in Atlantic Canada. The business will have 35 employees.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #5819  
Old Posted Oct 28, 2021, 9:23 PM
LewisVillis LewisVillis is offline
Registered User
 
Join Date: Jul 2020
Location: Moncton
Posts: 55
Quote:
Originally Posted by MonctonRad View Post
According to the T&T, Skyzone will officially reopen at 2 PM tomorrow in their expanded new location in the old Chrysler building on St. George Blvd.

At 28,000 sq ft, it will be the largest indoor play park in Atlantic Canada. The business will have 35 employees.
A good way to work off all those sugar donuts from Mrs Dunster's next door (which, with the all baking, has nicely added to the aroma of my neighborhood).
Reply With Quote
     
     
  #5820  
Old Posted Oct 29, 2021, 6:47 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,228
Quote:
Originally Posted by MonctonRad View Post
The T&T is reporting approval for a new 21 unit apartment building (one bedroom and bachelors) on the SW corner of St. George & Steadman Streets in the downtown east end. This is kitty corner to the other recently approved small apartment building currently under construction on the NE corner of this intersection.

Renders available on the PAC document seem to show it will be identical to the building under construction on the NE corner of this intersection:

https://www5.moncton.ca/docs/pac/PAC/October_27_2021/6_b_34_St_George.pdf

According to Huddle, this development for east St. George Street has been approved by PAC, with construction to begin almost immediately, and to be completed by late next spring.

These apartments are designed to be affordable:

Quote:
Price points for the 21 bachelor and one-bedroom apartments will range between $800 and $950 a month.

The air-conditioned apartments will range in size from 350 to 700 square feet, situated on the building’s three, 3,500-square-foot floors.
https://huddle.today/shediac-developer-approved-to-build-21-affordable-apartments-in-moncton/

Given the outcry over the absence of "affordable" housing in the city core these days, we need more of these modest and low cost buildings to be built in the city (in addition to the larger and more flashy developments).
__________________
Go 'Cats Go
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 7:35 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.