Quote:
Originally Posted by TallerIsBetter View Post
That's cool. Is there a link? Was it just the south tower or is the North tower increased some as well?

Thanks for the info. Taller is Better!!
North tower is now 110 floors & 1100 feet tall.
Reply With Quote
     
     
  #182  
Old Posted Oct 21, 2021, 10:55 PM
sparky212's Avatar
sparky212 sparky212 is offline
Registered User
 
Join Date: Jul 2008
Location: London Ont.
Posts: 506

Tonight
Reply With Quote
     
     
  #183  
Old Posted Oct 25, 2021, 1:33 PM
Puddin74 Puddin74 is offline
Registered User
 
Join Date: Jul 2021
Location: London
Posts: 13
Quote:
Originally Posted by GreatTallNorth2 View Post
Just wondering - did the 40 floor tower get bumped to 135 metres?
The proposed Building height is 129m (which is livable units) the 136.4 is to top of penthouse.
Reply With Quote
     
     
  #184  
Old Posted Oct 25, 2021, 1:46 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,758
Why would there be a distinguishing between the two - is the building not 136.4 then?
Reply With Quote
     
     
  #185  
Old Posted Oct 25, 2021, 2:04 PM
Puddin74 Puddin74 is offline
Registered User
 
Join Date: Jul 2021
Location: London
Posts: 13
















Reply With Quote
     
     
  #186  
Old Posted Oct 25, 2021, 2:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Terrific photos!



Nearly done the second row of horizontal cable bracing in the north end of pit. Should see the excavation go down to the bottom depth soon.
Reply With Quote
     
     
  #187  
Old Posted Oct 25, 2021, 3:16 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Great pictures, thanks for posting them.

If possible keep posting as progress continues, I assume you work at the site?
Reply With Quote
     
     
  #188  
Old Posted Oct 25, 2021, 6:33 PM
Goldenamishplumber Goldenamishplumber is offline
Registered User
 
Join Date: May 2021
Posts: 44
Great photos! definitely a nice change to see the site behind the barriers
Reply With Quote
     
     
  #189  
Old Posted Oct 28, 2021, 3:19 PM
Puddin74 Puddin74 is offline
Registered User
 
Join Date: Jul 2021
Location: London
Posts: 13
Quote:
Originally Posted by MrSlippery519 View Post
Great pictures, thanks for posting them.

If possible keep posting as progress continues, I assume you work at the site?
I actually don't work at the site. I was there testing/training some new equipment with my company. We picked up a Hilti Total Station.

But never know with that project, I might end up there a few times.
Reply With Quote
     
     
  #190  
Old Posted Nov 2, 2021, 11:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Most of the 3rd floor slab forming now up. Suspect steel rebar being installed now and we should see concrete pour very soon.
Reply With Quote
     
     
  #191  
Old Posted Nov 7, 2021, 1:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Have some of the 3rd floor slab now poured as they are forming 3rd floor posts now on the west side. Still have not dug the pit any deeper at the north end.
Reply With Quote
     
     
  #192  
Old Posted Nov 10, 2021, 4:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Concrete pump truck onsite today pouring the 3rd floor slab above the parking entrance off Fullerton St today.
Reply With Quote
     
     
  #193  
Old Posted Nov 13, 2021, 9:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Some of the 3rd floor posts are now poured.
Reply With Quote
     
     
  #194  
Old Posted Nov 18, 2021, 6:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
They have rebuilt the dirt ramp down into the pit along the west wall. Likely to allow heavy equipment to excavate the pit to its final depth along the east side.
Reply With Quote
     
     
  #195  
Old Posted Dec 2, 2021, 6:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Forming for 4th floor slab now starting on west side of south tower. Have also poured the north end tower crane base and installed the tower base steel for 2nd crane. They don't appear to be as deep in the north end of pit along the north and east pit walls as the south end.
Reply With Quote
     
     
  #196  
Old Posted Dec 7, 2021, 1:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,300
Giant mobile crane onsite now to assemble the tower crane for north end 29s condo tower.
Reply With Quote
     
     
  #197  
Old Posted Dec 8, 2021, 12:05 AM
Goldenamishplumber Goldenamishplumber is offline
Registered User
 
Join Date: May 2021
Posts: 44
I was able to get a picture of it too!
Reply With Quote
     
     
  #198  
Old Posted Dec 8, 2021, 1:26 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,292
Nice. I was at McKenzie Lake one day last week and wanted to get a picture, which would have been this angle I think, but the receptionist didn't want me to go behind their door or take my phone and take the picture because of covid.
Reply With Quote
     
     
  #199  
Old Posted Dec 8, 2021, 1:42 AM
Goldenamishplumber Goldenamishplumber is offline
Registered User
 
Join Date: May 2021
Posts: 44
That doesn't surprise me, lawyers going to lawyer!

I was next door at 500 Talbot, and the owner of the unit was very accommodating to let me take photos, was telling me how he's been watching them work.

Also had a pretty cool view of one richmond, but I didn't think to take a photo.
Reply With Quote
     
     
  #200  
Old Posted Dec 9, 2021, 1:19 AM
sparky212's Avatar
sparky212 sparky212 is offline
Registered User
 
Join Date: Jul 2008
Location: London Ont.
Posts: 506
Tonight

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.