It's a big site. I wonder how much below the river level parking will go?
Reply With Quote
     
     
  #202  
Old Posted May 12, 2021, 1:58 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
Quote:
Originally Posted by Klazu View Post
It's a big site. I wonder how much below the river level parking will go?
Have a look on page 4 of the public consultation boards, not a technical drawing but is should be close to reality.
Reply With Quote
     
     
  #203  
Old Posted Jun 8, 2021, 12:50 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,820
Opinion: Warm weather heats up complaints about New West pile-driving noise

https://www.newwestrecord.ca/local-news/...bout-new-west-pile-driving-noise-3845409
Reply With Quote
     
     
  #204  
Old Posted Jun 20, 2021, 9:20 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,860
2021, June 19

Crane is up. Change to C/U?

Untitled by Lexus LX570, on Flickr


Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr

Untitled by Lexus LX570, on Flickr
Reply With Quote
     
     
  #205  
Old Posted Jun 20, 2021, 11:49 PM
giallo's Avatar
giallo giallo is online now
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,758
Exciting. These towers are going to really stand out.
Reply With Quote
     
     
  #206  
Old Posted Oct 17, 2021, 4:25 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,217
24 hour, 4500 cubic meter monolithic concrete pour for the West tower.

Quote:
Bosa Development has firmed up its plans for a monolithic concrete pour at the Pier West site on New Westminster’s waterfront.

City council has granted Bosa Development an exemption to the construction noise bylaw from 6 a.m. on Friday, Oct. 22 until 9 a.m. on Saturday, Oct. 23. This is for a concrete pour for the creation of the west tower foundation for Pier West.

“Bosa Development have confirmed that the monolithic pour of 4,500 cubic metres for the West Tower core needs to occur as one single continuous event estimated to take approximately 24 hours,” said a staff report. “Bosa’s engineers report that the core footing needs to be a monolithic slab as it will be located below the water table due to its close proximity to the south Fraser River.”

“During the pour, there will be four concrete pump trucks located around the foundation area of the worksite and a spare concrete pump truck in case of breakdown of any pump truck,” said the report. “Concrete will (be) supplied by approximately 23 concrete supply trucks per hour for a total load of 450 trucks during the duration of the entire concrete pour.”
https://www.newwestrecord.ca/local-news/...-up-for-new-west-waterfront-site-4516414
Reply With Quote
     
     
  #207  
Old Posted Oct 17, 2021, 9:46 PM
Spr0ckets Spr0ckets is offline
Registered User
 
Join Date: Oct 2015
Posts: 1,992
Quote:
Originally Posted by madog222 View Post
24 hour, 4500 cubic meter monolithic concrete pour for the West tower.


https://www.newwestrecord.ca/local-news/...-up-for-new-west-waterfront-site-4516414

Dang!
23 trucks an hour and 450 trucks total in 24 hours.

Goodbye to any sleep for anyone who lives in the nearby vicinity for that time period.
Probably a good time to go visit the country cottage or go for a ski trip weekend at Whistler. A trip to Victoria maybe.

For that matter, traffic in the area is going to be a nightmare with all those trucks about, unless they're freighting most of the concrete in via barge and the river. ( I don't even know if that's possible with that location)

That's a dang whole lot of concrete.
I can get why they have to do it as one continuous pour.
Probably can't afford to have any seams that far below the water table.

EDIT :
(*Yep. It seems like seams would be the major concern for separate or non-continuous pours according to the article.
Also, it seems like the only thing the process can't interrupt is the train traffic and train schedule which will continue as usual regardless of whatever disruption they cause to the trucks and the truck routes (which will then have to find alternative routes in case of trains crossing interruptions.

Again, bye-bye to any usual road traffic sanity in that area for that 24 hour period.

It also says in the article that the trucks have a 90 minute window to get the concrete to the site, so I guess that answers the question of whether they could get it to the site via a barge or the waterway)
Reply With Quote
     
     
  #208  
Old Posted Oct 17, 2021, 10:26 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by Spr0ckets View Post
Dang!
Goodbye to any sleep for anyone who lives in the nearby vicinity for that time period.
Probably a good time to go visit the country cottage or go for a ski trip weekend at Whistler. A trip to Victoria maybe.
How loud / far will the sound travel? There are some residential buildings on Columbia but most of it is retail and office. Will it travel a couple blocks up the hill, or (more likely) a few blocks to the west to the Quayside area? Still they're only talking from early Friday morning (some people may be woken up early) through overnight Fri into Saturday morning.
Reply With Quote
     
     
  #209  
Old Posted Oct 17, 2021, 11:43 PM
Spr0ckets Spr0ckets is offline
Registered User
 
Join Date: Oct 2015
Posts: 1,992
Quote:
Originally Posted by Sheba View Post
How loud / far will the sound travel? There are some residential buildings on Columbia but most of it is retail and office. Will it travel a couple blocks up the hill, or (more likely) a few blocks to the west to the Quayside area? Still they're only talking from early Friday morning (some people may be woken up early) through overnight Fri into Saturday morning.
I think it will travel up the hill fairly easily.
Remember that sound travels more effectively through solid (like both the ground and the infrastructure), than through air.

As for how loud, I'm not certain how loud they'll be relative to, let say...piling,....but when they were driving those piles not that long ago, you COULD hear them as far as those residential properties to the west.

The only thing was that that was during the daytime and when most people were away at work anyway.

But then again, pile-driving sound travels directly through the ground, so that probably helped it dissipate and spread out faster.
Reply With Quote
     
     
  #210  
Old Posted Oct 18, 2021, 12:00 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,820
Isn't Front Street literally wall to wall trucks during the day? I doubt anyone will notice compared to the train/truck noise. There is no way pumping concrete into a pit is going to generate any noise/vibrations comparable to pile driving.
Reply With Quote
     
     
  #211  
Old Posted Oct 18, 2021, 2:35 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Somehow the idea of any extra truck traffic through New Westminster makes me giggle.
Reply With Quote
     
     
  #212  
Old Posted Nov 27, 2021, 8:09 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,820
Reply With Quote
     
     
  #213  
Old Posted Nov 27, 2021, 9:36 PM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,888
Amazing to think that my pre-sale client, who purchased a very high-floor one bed suite, will wait 7-8 years for completion on his unit!
Reply With Quote
     
     
  #214  
Old Posted Nov 28, 2021, 6:37 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
There are three tower cranes on-site and there is part of the structure already above ground on the westside of the site.
Reply With Quote
     
     
  #215  
Old Posted Dec 1, 2021, 11:16 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Surprised we were only able to come up with 1 photo update in the last 5 months for such a big project/unique. I guess there isn't very many of us out in New West? I'll try getting a few shots this month if weather permits.
Reply With Quote
     
     
  #216  
Old Posted Dec 1, 2021, 2:24 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,030
I would say it is currently the least discussed major project happening.

But I feel that will change once it starts rising.

Relatively speaking this will potentially be the most impactful project of the next few years in regards to its surrounding. Coming from the Alex Fraser Bridge this will look immense.
Reply With Quote
     
     
  #217  
Old Posted Dec 1, 2021, 11:00 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by Nites View Post
Surprised we were only able to come up with 1 photo update in the last 5 months for such a big project/unique. I guess there isn't very many of us out in New West? I'll try getting a few shots this month if weather permits.
Ovation (next to New West Station) has also been largely forgotten about. I've tried to post picture links every so often as it's all I can do without a camera.
Reply With Quote
     
     
  #218  
Old Posted Dec 4, 2021, 12:22 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,860
Can anyone property post this photos from instagram?

Here is a link

https://www.instagram.com/p/CW9q4RHJYE5/?utm_source=ig_web_copy_link
Reply With Quote
     
     
  #219  
Old Posted Dec 4, 2021, 4:09 PM
connect2source's Avatar
connect2source connect2source is offline
life in the present
 
Join Date: Mar 2011
Location: Halifax
Posts: 1,888
Add 618 Carnarvon to the forgotten list, have a pre-sale buyer for that too. We need someone on the ground in New West.
Reply With Quote
     
     
  #220  
Old Posted Dec 4, 2021, 7:10 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,820
This was tagged as New West I think

https://www.instagram.com/p/CWT26QcB31Y/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 6:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.