  #761  
Old Posted Oct 9, 2021, 2:49 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,176
They have night work on the Main St on ramp scheduled for the 12th to the 15th. I think we will see it in service on the 16th.
     
     
  #762  
Old Posted Oct 9, 2021, 7:12 PM
Tvisforme's Avatar
Tvisforme Tvisforme is online now
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,152
Quote:
Originally Posted by madog222 View Post
They have night work on the Main St on ramp scheduled for the 12th to the 15th. I think we will see it in service on the 16th.
When I drove past yesterday, there appeared to be signage in place for the lights, so yes, it does seem to be getting very close to opening day.
     
     
  #763  
Old Posted Oct 11, 2021, 3:35 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
     
     
  #764  
Old Posted Oct 12, 2021, 6:14 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888

DriveBc

The latest. Also do we have any info on how far the west-most lane will be divided from the other two south-bound lanes? (eg where the yellow line is in the pic)
     
     
  #765  
Old Posted Oct 12, 2021, 7:17 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
Quote:
Originally Posted by Jimbo604 View Post

DriveBc

The latest. Also do we have any info on how far the west-most lane will be divided from the other two south-bound lanes? (eg where the yellow line is in the pic)
I assume it will be divided until those two onramp lanes merge into a single lane. It makes sense for those higher speed cars to merge at the middle or end of the bridge.



     
     
  #766  
Old Posted Oct 12, 2021, 7:23 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
Just noticed the guys who are doing the adaptive traffic signaling posted some YouTube videos:

#1 Why the Dollarton onramp creates traffic up the cut

Video Link


Seems like they also thought about having alternating greens instead of longer green lights.

Video Link
     
     
  #767  
Old Posted Oct 12, 2021, 7:46 PM
esup21 esup21 is offline
Registered User
 
Join Date: Oct 2021
Posts: 18
Quote:
Originally Posted by jollyburger View Post
Just noticed the guys who are doing the adaptive traffic signaling posted some YouTube videos:

Seems like they also thought about having alternating greens instead of longer green lights.

Video Link

That was the old ramp meter with a bus bypass option. The adaptive signal that is being built there will operate quite differently.
     
     
  #768  
Old Posted Oct 12, 2021, 7:48 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,176
Night work on the Main St onramp tonight, first of four nights in a row.
     
     
  #769  
Old Posted Oct 12, 2021, 8:10 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
Quote:
Originally Posted by esup21 View Post
That was the old ramp meter with a bus bypass option. The adaptive signal that is being built there will operate quite differently.
Our new orange vest for the onramp project?
     
     
  #770  
Old Posted Oct 12, 2021, 8:52 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by jollyburger View Post
#1 Why the Dollarton onramp creates traffic up the cut
I suspect that the total volume of traffic going southbound over the 2nd narrows isn't going to change very significantly, and that the net effect of the new merging pattern will be to trade backups up the cut for backups along Main and upstream of the Dollarton on ramp.
     
     
  #771  
Old Posted Oct 12, 2021, 9:47 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,790
Quote:
Originally Posted by aberdeen5698 View Post
I suspect that the total volume of traffic going southbound over the 2nd narrows isn't going to change very significantly, and that the net effect of the new merging pattern will be to trade backups up the cut for backups along Main and upstream of the Dollarton on ramp.
there are a lot of cars that sit way too long on the dollarton on ramp because they are too scared to merge onto the highway. This gets eliminated

However, I suspect main street might be an issue
__________________
i have no idea what's going on
     
     
  #772  
Old Posted Oct 12, 2021, 9:49 PM
esup21 esup21 is offline
Registered User
 
Join Date: Oct 2021
Posts: 18
Quote:
Originally Posted by aberdeen5698 View Post
I suspect that the total volume of traffic going southbound over the 2nd narrows isn't going to change very significantly, and that the net effect of the new merging pattern will be to trade backups up the cut for backups along Main and upstream of the Dollarton on ramp.
Actually, the new combined Main/Dollarton on-ramp will not cause any back-ups up the Cut, as it removes the existing Dollarton merge. Any upstream back-ups on the Highway from that location will be caused by the bridge itself.
     
     
  #773  
Old Posted Oct 12, 2021, 9:53 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
Quote:
Originally Posted by esup21 View Post
Actually, the new combined Main/Dollarton on-ramp will not cause any back-ups up the Cut, as it removes the existing Dollarton merge. Any upstream back-ups on the Highway from that location will be caused by the bridge itself.
I think he said he thought the Main/Dollarton onramps would backup because of the new signaling. Not that the cut would backup.
     
     
  #774  
Old Posted Oct 12, 2021, 10:18 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,176
Plus half the people driving along the highway know how terrible that merge is and move into the left lane leaving the right lane almost empty.
     
     
  #775  
Old Posted Oct 12, 2021, 11:17 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by jollyburger View Post
I think he said he thought the Main/Dollarton onramps would backup because of the new signaling. Not that the cut would backup.
Yeah, my point was that the 3 lanes of capacity on the bridge isn't changing. All we're really doing is shuffling around where the congestion will be for the cars trying to cross over. Trying to relieve waits on the cut will come at the expense of waits for cars from Dollarton and Main merging to get onto that curb lane of the bridge. Even if the cut gets better, the congestion from those other sources will likely get worse.
     
     
  #776  
Old Posted Oct 13, 2021, 12:55 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,684
Quote:
Originally Posted by madog222 View Post
Night work on the Main St onramp tonight, first of four nights in a row.
Seems like they just updated it again and removed those 9pm closures.
     
     
  #777  
Old Posted Oct 13, 2021, 2:04 AM
Tvisforme's Avatar
Tvisforme Tvisforme is online now
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,152
Hopefully, the overall reduction in choke points (the Dollarton/TC merge, the on/off ramp muddle westbound, etc) will help reduce congestion by improving the overall flow with fewer stops and slowdowns. I still remember how, even thought there were no new lanes, the overall Lions Gate traffic flow improved after they widened and improved the lanes over the bridge and through the Causeway.
     
     
  #778  
Old Posted Oct 13, 2021, 2:29 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,407
Quote:
Originally Posted by aberdeen5698 View Post
Yeah, my point was that the 3 lanes of capacity on the bridge isn't changing. All we're really doing is shuffling around where the congestion will be for the cars trying to cross over. Trying to relieve waits on the cut will come at the expense of waits for cars from Dollarton and Main merging to get onto that curb lane of the bridge. Even if the cut gets better, the congestion from those other sources will likely get worse.
100% this. I think the simulation video shows it perfectly. I have serious doubts over people's ability to get going fast enough with the new metering, not to mention semis accelerating from standstill up the bridge. I predict the third southbound lane to be badly underutilized.

Also, should there be snow, it will become very difficult to get up the bridge as the rightmost lane will be separated far up the bridge.

It is great that they had the foresight to build 2nd Narrows six lanes but man, would eight lanes have solved so many problems for us for decades to come... If only a zipper lane could have been added.
     
     
  #779  
Old Posted Oct 13, 2021, 3:15 AM
esup21 esup21 is offline
Registered User
 
Join Date: Oct 2021
Posts: 18
Quote:
Originally Posted by Klazu View Post
100% this. I think the simulation video shows it perfectly. I have serious doubts over people's ability to get going fast enough with the new metering, not to mention semis accelerating from standstill up the bridge. I predict the third southbound lane to be badly underutilized.

Also, should there be snow, it will become very difficult to get up the bridge as the rightmost lane will be separated far up the bridge.

It is great that they had the foresight to build 2nd Narrows six lanes but man, would eight lanes have solved so many problems for us for decades to come... If only a zipper lane could have been added.

The bridge has reached capacity a few years ago will all three lanes also at capacity, so no way that the curb lane goes underutilized. Slow trucks are an issue on that bridge as on any other uphill bridge sections (like the Alex Fraser Bridge).

The entire Lower Lynn project proceeded with the knowledge that we cannot replace the bridge in the foreseeable future (not until other big ticket items like the Massey Tunnel are completed) but we can still improve traffic flow, safety, and provide improvement to other road users in the meantime. The removal of the Dollarton merge by itself is going to be a huge improvement.
     
     
  #780  
Old Posted Oct 13, 2021, 4:52 AM
Tvisforme's Avatar
Tvisforme Tvisforme is online now
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,152
This might be completely impractical, but... what potential is there for making the Second Narrows Bridge (the rail crossing) drivable? I'm not suggesting that it be used every day; railway schedules would almost certainly never allow it. However, it might be possible to configure it for use by transit and emergency vehicles in the event that the IWM is closed or heavily clogged. On the north side, access would be from lower Mountain Highway along Barrow, Orwell and Railway. On the south side, the potential exit point would be the service road at the corner of Skeena and Bridgeway, which goes to a point on the track between the end of the Second Narrows bridge and the start of the Thornton tunnel.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.