Quote:
Originally Posted by aberdeen5698
Yeah, my point was that the 3 lanes of capacity on the bridge isn't changing. All we're really doing is shuffling around where the congestion will be for the cars trying to cross over. Trying to relieve waits on the cut will come at the expense of waits for cars from Dollarton and Main merging to get onto that curb lane of the bridge. Even if the cut gets better, the congestion from those other sources will likely get worse.
|
100% this. I think the simulation video shows it perfectly. I have serious doubts over people's ability to get going fast enough with the new metering, not to mention semis accelerating from standstill up the bridge. I predict the third southbound lane to be badly underutilized.
Also, should there be snow, it will become very difficult to get up the bridge as the rightmost lane will be separated far up the bridge.
It is great that they had the foresight to build 2nd Narrows six lanes but man, would eight lanes have solved so many problems for us for decades to come... If only a zipper lane could have been added.