Is it just me or are there very little buildings in Algonquin College? I thought it would/could be a dense/vibrant college community but it looks like a few scattered buildings and a sea of parking.

Does not look like a lively college with over 20,000 full-time students in attendance yearly.
Reply With Quote
     
     
  #2502  
Old Posted Sep 27, 2021, 2:22 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,654
Quote:
Originally Posted by OTSkyline View Post
Is it just me or are there very little buildings in Algonquin College? I thought it would/could be a dense/vibrant college community but it looks like a few scattered buildings and a sea of parking.

Does not look like a lively college with over 20,000 full-time students in attendance yearly.
Yes, there is a lot of surface parking but, considering its relatively surburban location, it is quite a dense cluster of buildings. It's actually quite a bustling place during the school year, just as vibrant as any Canadian college or university I have visited.

Reply With Quote
     
     
  #2503  
Old Posted Sep 27, 2021, 4:38 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
And circled in red they now have the Jack Doyle Athletics and Recreation Centre,
still under construction, almost done already, soon to open.
https://www.algonquinsa.com/athletics/arc/
Reply With Quote
     
     
  #2504  
Old Posted Sep 27, 2021, 5:18 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,828
Thanks for sharing. I guess I've never been "through" the campus. I was under the impression that Woodroffe was the centre of Campus, but really it looks like that nice building on Woodroffe and the LRT will be at the far end of the campus. With that being said, I looked through the campus on Google Maps and it doesnt seem to be a very pleasant pedestrian environment, seems very disjointed and linked by random pedestrian bridges everywhere. Seems like it could be improved a lot - by looking at other examples like Carleton or OttawaU.

i really hope they can do more around the area though. All these empty fields / grass patches fronting Woodroffe could be filled with housing or student residences (they might not all be owned by the college though).
Reply With Quote
     
     
  #2505  
Old Posted Sep 27, 2021, 7:01 PM
DEWLine DEWLine is offline
Registered User
 
Join Date: Oct 2010
Location: Ottawa-Gatineau
Posts: 337
When I attended classes there, the campus was a lot smaller. The Animation, Law Enforcement, Journalism, Museum Technologist, Nursing Assistant, and Commercial Artist programmes all shared a single "E" Block out-building with a leaky roof. By the summer of 1992, the purpose-built Hospitality block had just started holding classes!
Reply With Quote
     
     
  #2506  
Old Posted Sep 28, 2021, 4:48 PM
McDonald's Racoon McDonald's Racoon is offline
Registered User
 
Join Date: May 2021
Posts: 163
The campus is quite hard to navigate but easy to get the hang of once you've figured out the direction of each building. All the pedestrian bridges are on the second floor so that acts like the main traffic zone from building to building with clear signs pointing you in the right direction. I do agree that there is still quite a lack of connection between the buildings otherwise.
Reply With Quote
     
     
  #2507  
Old Posted Oct 7, 2021, 2:07 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Jeff Leiper
@JLeiper

·
16h
The LRT team captured some great pics of the Bailey bridge installed last weekend. This one is my favourite.

https://twitter.com/JLeiper/status/1445872413862944770
Reply With Quote
     
     
  #2508  
Old Posted Oct 11, 2021, 8:02 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,690
I'm a little confused. What is this bridge for?
Reply With Quote
     
     
  #2509  
Old Posted Oct 11, 2021, 9:13 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by ponyboycurtis View Post
I'm a little confused. What is this bridge for?
It's for the transitway detour. Once the transitway trench is closed, buses will continue down an extended Scott St. and then take this bridge across the trench to get to the SJAM.
Reply With Quote
     
     
  #2510  
Old Posted Oct 12, 2021, 12:46 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,654
Quote:
Originally Posted by OCCheetos View Post
It's for the transitway detour. Once the transitway trench is closed, buses will continue down an extended Scott St. and then take this bridge across the trench to get to the SJAM.
I assume it is temporary? Why not have a permanent connection between Scott and SJAM?
Reply With Quote
     
     
  #2511  
Old Posted Oct 12, 2021, 1:23 AM
HighwayStar's Avatar
HighwayStar HighwayStar is offline
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
Quote:
Originally Posted by AuxTown View Post
I assume it is temporary? Why not have a permanent connection between Scott and SJAM?
As a 25 year (former) resident of the area…. That proposal would set new records for NIMBY-ism.

Westboro Beach ( to the right in the photo) is a quiet little enclave with zero traffic and non-trivial homes. Putting a major thoroughfare through the area wouldn’t go over well…. And for what benefit actually? Traffic congestion on SJAM and/or Scott St is non existent at that “intersection”.
Reply With Quote
     
     
  #2512  
Old Posted Oct 12, 2021, 1:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by AuxTown View Post
I assume it is temporary? Why not have a permanent connection between Scott and SJAM?
They will rebuild the Churchill ped/cycling bridge, and Kitchi Sibi Station will offer a crossing as well. None for cars though, and that's probably for the best.
Reply With Quote
     
     
  #2513  
Old Posted Oct 12, 2021, 2:30 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Reply With Quote
     
     
  #2514  
Old Posted Oct 12, 2021, 2:34 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,654
I agree the we don't really need car crossing here but it's good to hear they will have multiple new pedestrian options. Nothing worse than living directly across from a beautiful parkway and having to walk muliptle blocks to access it :-(
Reply With Quote
     
     
  #2515  
Old Posted Oct 12, 2021, 2:49 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by AuxTown View Post
I agree the we don't really need car crossing here but it's good to hear they will have multiple new pedestrian options. Nothing worse than living directly across from a beautiful parkway and having to walk muliptle blocks to access it :-(
Still hoping that one day, the entire trench is decked-over with a linear park. That would be a massive improvement, and much needed with thousands of new residential units going up and proposed in the immediate area.
Reply With Quote
     
     
  #2516  
Old Posted Oct 12, 2021, 4:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
O-Train West Extension Construction Update
October 12, 2021

In the west, work at the Moodie Light Maintenance and Storage Facility, Queensview, Iris, Lincoln Fields, and Byron Linear Park, and the slurry plant at Rochester Field and the Sir John A. Macdonald (SJAM) Parkway is ongoing. Cut and cover tunnel construction has commenced on the Parkway Tunnel. Work has also begun at the Moodie and Pinecrest 417 interchanges.

To view a detailed and interactive map of the Stage 2 alignments, please visit Ottawa.ca/Stage2. Use the zoom function to narrow-in on your geographical area of interest, and click station names for a quick link to artistic renderings and detailed description.

Moodie Interchange, Moodie LRT Station and Moodie Light Maintenance and Storage Facility (LMSF):

  • Structural steel erection of the Service and Inspection building is underway.
  • Foundation construction for the Train Storage Shed and the Administrative Building is underway.
  • Bridge deck construction of the future westbound on-ramp from northbound Moodie Drive is ongoing.
  • Bridge deck construction of the future westbound 417 on-ramp from southbound Moodie Drive is ongoing.
  • Bridge deck construction of the west portion of Moodie Drive over the LRT track (future southbound lanes) is ongoing.

Holly Acres and Highway 417 Interchange
  • Construction work is ongoing on the toe wall on the new on-ramp.
  • Paving and median work is underway.



Bayshore Station Area
  • Bayshore bus loop construction is complete.
  • Utilities relocation is ongoing.

Pinecrest Station Area
  • Rock breaking, line drilling, and excavation are underway for the Pinecrest trench.
  • Watermain relocation is underway.
  • Grading work is occurring along westbound Highway 417.
  • Bus-only ramp abutments and decking are ongoing.

Iris Station and Pinecrest Creek Area
  • Pinecrest Creek realignment is complete.
  • Preparation to remove the old culvert has begun.
  • Support of excavation and excavation are complete for the Iris Street road-over-rail bridge.
  • Culvert, and wall construction at the Pinecrest Stormwater Management Pond are underway.

Lincoln Fields Flyover Rail Bridge (south of Lincoln Fields)
  • Work on columns and abutments for the new Woodroffe pedestrian bridge is ongoing.
  • Split-structure deck panels and super structure construction continues.

Connaught Cut and Cover Tunnel and Queensview Station Area
  • Watermain relocation in Connaught Park is ongoing.
  • Queensview Station storm line relocation work is ongoing.
  • Drilled shafts and concrete pouring for support of excavation are underway for the Connaught Tunnel along Queensview.

Lincoln Fields Station and Carling Avenue LRT Bridge
  • Concrete pouring of the deck is ongoing.
  • Structural steel and formwork installation is ongoing for the station.
  • Retaining wall footings and wall work ongoing for the station.
  • Watermain installation on Edgeworth is underway.
  • At the north end of Lincoln Fields, bridge deck work crossing Richmond and at McEwen is complete. Excavation for the tunnel is ongoing.
  • Station backfill work is ongoing.



Byron and Richmond Corridor (Byron Linear Park)
  • Sanitary line relocation work at Hartleigh Avenue continues.
  • Cylinder pile drilling, excavation and rock breaking are ongoing for tunnel work.
  • Hydro connections to complete power supply connections for the project are ongoing.
  • East of Woodroffe Avenue drilling, lagging and rock breaking are ongoing.
  • New Orchard Station structure and rebar work are underway.
  • Concrete pouring for the Parkway Tunnel walls is ongoing, requiring temporary closures along Byron Avenue until winter.





Rochester Field & Sir John A. Macdonald (SJAM) Parkway
  • Parkway Tunnel drilling, support wall construction and excavation operations are ongoing.



Kìchì Sìbì Station to Goldenrod Bridge (west of Tunney’s Pasture Station)
  • Assembly is ongoing for the bus-only bridge, followed by installation over the Transitway.
  • Scott Street utilities relocation and widening is underway in preparation for the 2022 bus detour.
  • Goldenrod bridge slab installation work is ongoing.
  • Dominion/Berkley to SJAM storm line relocation, drilling and rock breaking has started.

https://mailchi.mp/f1a845732b90/o-train-west-extension-construction-update?e=16641e8b73
Reply With Quote
     
     
  #2517  
Old Posted Oct 14, 2021, 8:31 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,690
Quote:
Originally Posted by OCCheetos View Post
It's for the transitway detour. Once the transitway trench is closed, buses will continue down an extended Scott St. and then take this bridge across the trench to get to the SJAM.
Of course. Makes perfect sense. I was somehow envisioning another route for the bus traffic, but there really isn't any practical way to serve the same area I suppose.
Reply With Quote
     
     
  #2518  
Old Posted Oct 18, 2021, 1:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
From @BenYOW2 on Twitter.

Moodie Yard.



Pinecrest.



https://twitter.com/BenYOW2/status/1449844548088254470
Reply With Quote
     
     
  #2519  
Old Posted Oct 25, 2021, 5:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
90 Day Look Ahead -Sherbourne to Lincoln Fields
October 2021

Overview

The O-Train West Extension is one of the three major extensions to Ottawa’s Light Rail Transit Project. The extension will add over 15 km of new rail and 11 new stations between Tunney’s Pasture to Moodie Drive and to Algonquin station. It also comprises a maintenance and storage facility, 10 new bridges, 14 rehabilitated bridges and 2 Cut-and-Cover Tunnels.

This notice provides an overview of upcoming activities between Sherbourne Station and Lincoln Fields Station as well as the expected community impacts including hours of work, noise from crews and equipment, pedestrian, and vehicle mobility, etc. While solid progress on the project is being made, construction activities are expected to continue to cause disruptions for area residents.

Major Works

Over the next few months, the Project focus will be around some critical activities which includes structures installation, drilling, excavation, and support of excavation activities. This quarter’s new and ongoing work comprises of roadway, bridge, tunnel, and station construction.

Byron Avenue

At Cleary Avenue, pile drilling is ongoing north side of Richmond Road. Relocation of a watermain north of Cleary Avenue is also underway. Concrete placement for the Cut-and-Cover Tunnel walls and foundation is ongoing with large machinery on the roadway periodically. Sherbourne Station construction will begin in November with walls, rebar, and pad installation. Please note that January to March 2022 there will be an eastbound detour of Richmond Road onto Byron Avenue to allow for storm, sanitary and watermain works. More details will be shared as plans are finalized closer to its implementation.



Byron Linear Park

The Cut-and-Cover Tunnel in Byron Linear Park will be excavated to an approximate depth of 10.5 metres. Cut-and-Cover Tunnel construction operations are ongoing and will continue until 2023.

Excavation, anchoring, and wall work is ongoing from Cleary Avenue to Woodroffe Avenue. Rock breaking between Woodroffe and Ancaster Avenues is ongoing and anticipated to be completed by mid-November. All Tunnel rock breaking is expected to be completed in 2022. The New Orchard Station construction is progressing with slab and wall construction.



McEwen Avenue and Edgeworth Avenue

At Richmond and Lincoln Fields, Cut-and-Cover Tunnel work is ongoing across Richmond Road. Work this fall is on the installation of roadway decking at Richmond and McEwen for Cut-and-Cover Tunnel work, a lane reduction will be in place. The roadway decking, similar to what was installed at Woodroffe Avenue, will maintain traffic mobility while construction advances underneath. Cut-and-Cover Tunnel drilling, excavation, and support of excavation will continue at Richmond Road and McEwen Avenue, and into Lincoln Fields, through the fall.

Utilities relocation work at McEwen, Richmond, Edgeworth and Hartleigh will be completed by the end of the year. Asphalt paving will be completed in mid-November on Edgeworth Avenue.

Ambleside Detour

Following the sidewalk installation on Ambleside Drive, road work will begin for the upcoming westbound detour from Richmond Road. The detour between New Orchard Avenue and McEwen Avenue will reroute westbound traffic around the Richmond Road work zone maintaining connectivity while construction progresses.

Lincoln Fields

There are several work areas operating in Lincoln Fields between Carling Avenue and Richmond Road, including structural work, Cut-and-Cover Tunnel work, and station construction. Progress will continue on structures, station pad, station walls, retaining walls and some utility work throughout the fall. The pedestrian walkway that connected the bus station to Carling Avenue is now closed to allow for construction, and Carling Avenue will undergo another lane shift in October. The Lincoln Fields Station construction will be ongoing until 2023.

South of Carling Avenue, construction on the split-structure bridge continues with deck and parapet installation. The new Woodroffe Pedestrian Bridge construction continues through the fall with pier cap construction and assembly of the steel structure; once it’s completed and opened to the public in Q2 2022 followed by removal of the current bridge.



Community Impacts

Most work is scheduled to occur from 7:00 a.m. to 6:00 p.m., Monday to Friday. However, throughout the notice period, there will be requirements for overnight work and weekend work

Night work is needed at times to accommodate work that requires traffic closures that cannot be done during the day, thus mitigating impacts on the travelling public. In addition, for works that are schedule critical, night work may be required, following a Public Notice, to meet the schedule on this large and complex project.

Noise and vibration from trucks and heavy equipment is expected. Trucks will use approved haul routes. Workers and contractors will park in designated parking areas. Street sweeping and dust suppression will be ongoing as needed.

All pedestrian, cycling, bus, and vehicular movements will generally be maintained during construction, with some detours. Pedestrians and cyclists should use extra caution when localized detours are in place, and adhere to all posted signage, speed limits, when travelling to ensure safety, as patterns change.

For residents whose property borders the affected construction zones, equipment in the area may cause additional noise and occasional vibration as the work progresses. The City of Ottawa thanks residents for their patience as KEV works to complete these construction activities.

Accessibility is an important consideration for the Stage 2 LRT project. The Stage 2 team makes every effort to provide access through and around construction sites. If you require special accommodation, please contact [email protected].


The safety of the public and the workers is paramount, and we thank you for your patience during construction.

The construction work outlined in this notice is subject to change. Work may be delayed or extended due to weather or other unforeseen circumstances.

Contact Us

Work will be ongoing in these areas. Additional construction updates, such as changes to work sequencing and the duration or impact of this work will be communicated via the Stage 2 project e-newsletter. To receive these electronic updates please sign up at Ottawa.ca/Stage2connect and select Sherbourne Station, New Orchard Station and/or Lincoln Fields Station. For other accommodations, or any questions, please contact:

Damon Berlin
Stakeholder Relations, Rail Construction Program
City of Ottawa
[email protected]
www.ottawa.ca/stage2

https://mailchi.mp/11507935e617/90-day-l...lincoln-fields-october-2021?e=f37f60b514
Reply With Quote
     
     
  #2520  
Old Posted Nov 3, 2021, 1:57 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Lincoln Fields to Pinecrest Station
90 Day Lookahead


November 2021

Overview

The O-Train West Extension is one of the three major extensions to Ottawa’s Light Rail Transit Project. The extension will add over 15 km of new rail and 11 new stations between Tunney’s Pasture to Moodie Drive and to Algonquin station. It also comprises a maintenance and storage facility, 10 new bridges, 14 rehabilitated bridges and 2 Cut-and-Cover Tunnels.

This notice provides an overview of upcoming activities between Connaught Park and Queensview Station, as well as the expected community impacts including hours of work, noise from crews and equipment, pedestrian, and vehicle mobility etc. While solid progress on the project is being made, construction activities can be expected to continue to cause disruptions for area residents.

Major Works

During this fall season, focus will centre around some crucial activities, principally drilling, excavation, support of excavation, for the Connaught Cut-and-Cover Tunnel construction, and structures work. Progress continues on construction of the split-structure bridge in Connaught Park, the Woodroffe Pedestrian Bridge until winter, and associated pathway work.

Lincoln Fields

There are several work areas operating in Lincoln Fields between Carling Avenue and Richmond Road, including structural work, Cut-and-Cover Tunnel work, and station construction. Progress will continue on structures, station pad, station walls, retaining walls and some utility work throughout the fall. The pedestrian walkway that connected the bus station to Carling Avenue is now closed to allow for construction, and Carling Avenue will undergo another lane shift in October. The Lincoln Fields Station construction will be ongoing until 2023.



Connaught Park

South of Carling Avenue, construction on the split-structure bridge continues with deck and parapet installation. The new Woodroffe Pedestrian Bridge construction continues through the fall with pier cap construction and
assembly of the steel structure; once it’s completed and opened to the public in Q2 2022 followed by removal of the current bridge.

Multi-use Pathway (MUP) construction to connect with the pedestrian bridge is underway, with paving anticipated in November.

In the area of Connaught Avenue, the drilling work is advancing well, with excavation and removals starting in October through December. Following excavation, formwork will be installed, and walls will be poured. Utilities relocation will also be ongoing through fall. Traffic will be maintained while performing drilling operations.



Queensview Station

Cut-and-Cover Tunnel work is advancing well between Connaught Avenue along the north side of Highway 417 to the Pinecrest interchange. Some utilities relocation work is ongoing through the fall. Stormwater and sanitary line relocation are still ongoing on Queensview Drive near the Ottawa Police Services property on Queensview with anticipated completion by the end of October.

The future Queensview Station construction has started this fall, with the foundation, slab, and walls; in conjunction with Cut-and-Cover Tunnel drilling, excavation, and support of excavation.

Pinecrest Interchange

Ramp modifications continue at Pinecrest Interchange enabling the LRT to travel in a trench underneath. The new open trench at Pinecrest interchange will have a new traffic ramp structure overtop, to be completed by the end of the year. A temporary bus ramp is under construction at Pinecrest interchange until end of October. Utilities at Pinecrest are still being relocated, including storm and sanitary sewers, as well as drainage work. In November the westbound 417 off-ramp will close for an extended period of construction from November 2021 until summer of 2023. The ramp closure is necessary to build the guideway west of Pinecrest interchange, and to connect with the Connaught Cut-and-Cover Tunnel from Queensview Station.



Community Impacts

Most work is scheduled to occur from 7:00 a.m. to 6:00 p.m., Monday to Friday. However, throughout the notice period, there will be requirements for overnight work and intermittent weekend work.

Night work is needed at times to accommodate work that requires traffic closures that cannot be done during the day, thus mitigating impacts on the travelling public. In addition, for works that are schedule critical, night work may be required to meet the schedule on this large and complex project.

Noise and vibration from trucks and heavy equipment is expected. Trucks will use approved haul routes. Workers and contractors will park in designated parking areas. Street sweeping and dust suppression will be ongoing as needed this fall then transitioning to snow removal and winter maintenance.

All pedestrian, cycling, bus, and vehicular movements will be maintained during construction, at times with some detours. Pedestrians and cyclists should use extra caution when localized detours are in place, and adhere to all posted signage, speed limits, when travelling to ensure safety, as patterns change.

Residents whose property borders the affected construction zones, equipment in the area may cause additional noise and occasional vibration as the work progresses. The City of Ottawa thanks residents for their patience as we work to complete these construction activities.

Accessibility is an important consideration for the Stage 2 LRT project. The Stage 2 team makes every effort to provide access through and around construction sites. If you require special accommodation, please contact [email protected].

The safety of the public and the workers is paramount, and we thank you for your patience during construction.

The construction work outlined in this notice is subject to change. Work may be delayed or extended due to weather or other unforeseen circumstances.

Contact Us

Additional construction updates, such as changes to work sequencing and the duration or impact of this work will be communicated via the Stage 2 project e-newsletter. To receive these electronic updates please sign up at Ottawa.ca/Stage2connect and select updates for “Lincoln Fields Station” and/or “Queensview Station” and/or “Pinecrest Station”. For other accommodations, or any questions, please contact:

Damon Berlin
Stakeholder Relations,
Rail Construction Program,
City of Ottawa
[email protected]
www.ottawa.ca/stage2

https://mailchi.mp/4cd511975cd4/lincoln-fields-to-pinecrest-station-90-day-lookahead?e=f37f60b514
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:46 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.