From Pat on
Rail Fans Canada Discord.
Algonquin Station, formerly Baseline, one of the first batch of Transitway Stations in 1983. Around 2010, the City and Algonquin College demolished the original station for a new Trades building and temporary bus station, with a rail station roughed-in underground, now being completed as part of Stage 2.
The station will be the Line 1 west terminus, handling high volumes of transfers from the north-south Barrhaven Transitway (and east-west Baseline light-BRT if built). It also serves a 30,000 or so student community college, City offices, library and theatre.
Only underground station on Stage 2 alignment (but about 500 meters of 4 kilometers of tunneling).
Iris Station and Pinecrest Creek. Iris is another of the old guard Transitway stations. Very minor, serving a suburban sfh neighbourhood with no TOD potential. Pinecrest Creek was buried when the original Transitway was built but is being moved and uncovered for Stage 2.