Quote:
Originally Posted by Novacek
I tuned in for a bit, but couldn't stay for the whole thing. It was mostly focused on the new bridge. They showed off some additional renderings, talked about accessibility to/from Rainey and the MACC. Talked about it needing to be about 22 feet over the nominal water surface (for flood and safety) but then the rail needing to transition underground quickly on the north.
The discussion group I got assigned to got somewhat derailed by a bunch of rowing people. They're _really_ not happy about their rowing center having to be moved. Several of them wanted the existing building to be "incorporated into the bridge" or something like that.
Edit/Add: looks like it's available on twitter
https://twitter.com/CapMetroATX/status/1448054108083015683
|
Thanks for the link! I skipped around to watch bits and pieces but mainly wanted to see schematics. Pretty fascinating.
I wonder about the rowing center - not a rower personally, but I have friends who are active in the sport. Is there a way to feasibly incorporate it into the bridge? That could be kinda cool. If not, and perhaps that is more likely, is there another location in mind?
I think the design is pretty interesting as they presented it and certainly complex in a lot of ways. However, I love the fact that they're aiming to do it right from the start to the best of their abilities.