Some work has been done to the pedestrian bridge pillar on the Trinity site.
Photo_6553854_DJI_254_jpg_9818407_0_2021924145316_photo_original by harley613, on Flickr
Reply With Quote
     
     
  #2462  
Old Posted Sep 25, 2021, 8:35 PM
Peenermcnoober Peenermcnoober is offline
 
Join Date: Jun 2021
Posts: 33
It's really funny to me this is the start of off the ground construction for the site as a whole. I really like how the angle you framed Bayview station makes it look. I think it's style is aging really well at least for now.
Reply With Quote
     
     
  #2463  
Old Posted Sep 25, 2021, 8:38 PM
Harley613's Avatar
Harley613 Harley613 is online now
 
Join Date: Jun 2009
Posts: 6,896
Yeah I really like the style of the new stations. Not groundbreaking or anything, but a fairly timeless modern design language akin to the Berlin Hauptbanhof, which is almost 20 years old but looks as good as anything built today. They will certainly age better than the old red tube design language of the Transitway.


Click for much larger image

Last edited by rocketphish; Sep 28, 2021 at 8:52 PM. Reason: Resized the humongous image
Reply With Quote
     
     
  #2464  
Old Posted Sep 27, 2021, 12:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Patch of grass at Tom Brown will be used for TNext parking, instead of, you know, the fenced-off patch of brown that was used as a staging area in phase 1. Mechanicsville will therefore have no access to Tom Brown, Laroche and Lemieux Island.
Reply With Quote
     
     
  #2465  
Old Posted Sep 28, 2021, 4:52 PM
CSYOWYEG CSYOWYEG is offline
 
Join Date: Feb 2021
Posts: 18
Went for a walk to YOW over the weekend, and got to view the pillars on Hunt Club that are brutal, along with some of the progress of the rest of the airport spur.











Reply With Quote
     
     
  #2466  
Old Posted Sep 28, 2021, 5:09 PM
pattherat pattherat is offline
 
Join Date: Nov 2018
Posts: 199
The pillar ‘issue’ has been addressed. They look that way because no finishing concrete will be applied as they will be buried and grade will be brought up the underside of the beams.

Also, thanks for the pics!
Reply With Quote
     
     
  #2467  
Old Posted Sep 28, 2021, 5:12 PM
lrt's friend lrt's friend is offline
 
Join Date: Dec 2006
Posts: 12,817
I have been driving through Riverside South quite regularly lately. There is still a lot of work to complete the right of way between Bowesville Road and Limebank Road. They only just starting to build the embankments leading to the Bowesville and Limebank overpasses.

I have to comment on how far the Limebank terminus is from the parts of Riverside South that are already built or under construction. Nobody is currently within reasonable walking distance. It is too bad it couldn't have been built to the Riverview Park n Ride where people actually live and to make proper use of that facility, but we all know how our rapid transit investments have to produce an underwhelming result.
Reply With Quote
     
     
  #2468  
Old Posted Sep 28, 2021, 5:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Quote:
Originally Posted by lrt's friend View Post
I have been driving through Riverside South quite regularly lately. There is still a lot of work to complete the right of way between Bowesville Road and Limebank Road. They only just starting to build the embankments leading to the Bowesville and Limebank overpasses.

I have to comment on how far the Limebank terminus is from the parts of Riverside South that are already built or under construction. Nobody is currently within reasonable walking distance. It is too bad it couldn't have been built to the Riverview Park n Ride where people actually live and to make proper use of that facility, but we all know how our rapid transit investments have to produce an underwhelming result.
Hoping to see a good medium density, 15-minute neighbourhood core at Limebank within the next decade, though I'm not getting my hopes up based on the City's track record, all talk and no action.
Reply With Quote
     
     
  #2469  
Old Posted Sep 29, 2021, 3:59 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
 
Join Date: Apr 2021
Posts: 1,693
Passing by on the SE Transitway on a regular basis, I see the bridge being constructed over the VIA rail tracks between Walkley and Heron are only set up for a single track.

Why on earth would this massive bridge not be built to be able to upgrade to a double track. Seems like a massive waste of an opportunity.
Reply With Quote
     
     
  #2470  
Old Posted Sep 29, 2021, 10:40 AM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by ponyboycurtis View Post
Passing by on the SE Transitway on a regular basis, I see the bridge being constructed over the VIA rail tracks between Walkley and Heron are only set up for a single track.

Why on earth would this massive bridge not be built to be able to upgrade to a double track. Seems like a massive waste of an opportunity.
I assume you are talking about the Ellwood diamond crossing? The bridge is long enough to allow VIA to add double track in the future and is designed so that it can be widened to support double track in the future. Their thought is that they don’t need it to be double tracked now so save that expense until later.
Reply With Quote
     
     
  #2471  
Old Posted Sep 29, 2021, 1:30 PM
OTownandDown OTownandDown is offline
 
Join Date: Jul 2018
Posts: 1,638
Quote:
Originally Posted by pattherat View Post
The pillar ‘issue’ has been addressed. They look that way because no finishing concrete will be applied as they will be buried and grade will be brought up the underside of the beams.

Also, thanks for the pics!
That's a weird answer from everyone. 'No finishing concrete'? Columns don't need 'finishing concrete'. The forms provide a smooth finish.

Are these old columns? For the life of me, I can't understand what's causing that look to them.

1. Old-Column theory: This is ongoing freeze-thaw damage of the old columns, and was deemed to be surficial and could remain.

2. New-Column theory: The formwork failed when the new columns were being poured (and these are chipper marks). The concrete was then chipped to create the proper diameter, and nobody bothered to parge over them (parging always fails anyways).
Reply With Quote
     
     
  #2472  
Old Posted Sep 29, 2021, 3:25 PM
OCCheetos OCCheetos is offline
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by OTownandDown View Post
That's a weird answer from everyone. 'No finishing concrete'? Columns don't need 'finishing concrete'. The forms provide a smooth finish.

Are these old columns? For the life of me, I can't understand what's causing that look to them.

1. Old-Column theory: This is ongoing freeze-thaw damage of the old columns, and was deemed to be surficial and could remain.

2. New-Column theory: The formwork failed when the new columns were being poured (and these are chipper marks). The concrete was then chipped to create the proper diameter, and nobody bothered to parge over them (parging always fails anyways).
The columns are new. It's pretty unclear how they ended up looking the way that they do, but the info about the columns being buried was provided to Councillor Brockington (who then tweeted it).
Reply With Quote
     
     
  #2473  
Old Posted Sep 29, 2021, 3:44 PM
roger1818's Avatar
roger1818 roger1818 is offline
 
Join Date: Feb 2016
Posts: 6,610
Quote:
Originally Posted by OCCheetos View Post
The columns are new. It's pretty unclear how they ended up looking the way that they do, but the info about the columns being buried was provided to Councillor Brockington (who then tweeted it).
From my limited understanding, to get nice looking, smooth columns, they need to use a different concrete mix with extra sand in the aggregate. They also need to make sure the pour is very well vibrated to get rid of all of the air bubbles, but not too much as it can lead to segregation. Extra care needs to be made to ensure the release agent is uniformly applied to the mould. All of this costs money, and if they are planning on burying them anyway, why bother.
Reply With Quote
     
     
  #2474  
Old Posted Sep 29, 2021, 3:54 PM
LRTeverywhere LRTeverywhere is offline
 
Join Date: Oct 2018
Posts: 326
In this image from Rail613 on Twitter you can see they are preparing to encase them in concrete aswell.


https://twitter.com/rail613/status/1442241291274706950?s=20
Reply With Quote
     
     
  #2475  
Old Posted Oct 6, 2021, 2:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
From the Gladstone Village DevApp, posted on RMT Discord. Corso Italia Station disagram.

Reply With Quote
     
     
  #2476  
Old Posted Oct 6, 2021, 9:29 PM
OCCheetos OCCheetos is offline
 
Join Date: Aug 2017
Posts: 2,118
Reply With Quote
     
     
  #2477  
Old Posted Oct 12, 2021, 2:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Ottawa has received its first two of seven Stadler FLIRTs, the new fleet (which will run along side the existing six Alstom LINTs, two will run on the airport spur, the other four will be combined into two train sets).

From RM Transit Discord:



From O-Train Fans:


https://otrain.railfans.ca/snapshot-upda...-outside-walkley-yard-msf-october-7-2021




https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-the-stadler-flirt-train-c10

https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-the-stadler-flirt-train-c10
Reply With Quote
     
     
  #2478  
Old Posted Oct 12, 2021, 2:39 PM
Sheezy Sheezy is offline
 
Join Date: Oct 2021
Posts: 16
I don't have access to the discord anymore, can someone send me an invite?
Reply With Quote
     
     
  #2479  
Old Posted Oct 12, 2021, 2:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Quote:
Originally Posted by Sheezy View Post
I don't have access to the discord anymore, can someone send me an invite?
The Rail Fans Canada Discord has been discontinued:

https://www.railfans.ca/news/discontinuation-of-the-rail-fans-canada-discord-server

The website continues to post regular Snapshot Updates and news on the O-Train, Montreal Metro, TTC Subway and other rail operations in Canada.

https://www.railfans.ca/

YouTube and Twitter are also still active:

https://www.youtube.com/c/RailFansCanada

https://twitter.com/intent/follow?origin...n=follow_link&screen_name=RailFansCanada

If you're not already part of the community, I recommend RMTransit Discord, which is similar to the old Rail Fans Canada, but with a more international focus (with of course sections for individual Canadian cities as well).

https://discord.com/invite/Gezxt9m
Reply With Quote
     
     
  #2480  
Old Posted Oct 12, 2021, 3:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
O-Train South Extension: September Construction Update
September 24, 2021

In the south, work is progressing well at the Walkley Maintenance and Storage Facility (MSF) and on multiple rail bridges and guideways. Station construction has begun at all sites.

To view a detailed and interactive map of the Stage 2 alignments, please visit Ottawa.ca/Stage2. Use the zoom function to narrow-in on your geographical area of interest, and click station names for a quick link to artistic renderings and detailed description.

Bayview Station and Trinity Pedestrian Bridge
Work on the station foundation continues.
  • The Trillium Multi-Use Pathway (MUP) has been re-opened for the public and the temporary detour has been removed.
  • A MUP detour is expected the week of September 27 in order to complete the final phase of asphalt work. Pedestrians and cyclists will be re-routed, and access will be maintained to the Station via the detour route.

Corso Italia Station
  • Work on the foundation and station stack walls are ongoing.
  • Guideway duct-banks for electrical utilities are underway.
  • Remaining rock drilling and hoe ramming activities to widen the trench between Gladstone Avenue and Beech Street are continuing. Trench works from Carling to Gladstone are expected to be completed by the end of December. Hoe ramming is expected to be completed by early November.



Dow’s Lake Station
  • Slope stabilization work is ongoing.
  • Station work on the cast-in-place wall will commence after slope stabilization takes place.

Dow’s Lake Tunnel
  • Concrete repair work is nearing completion including the waterproofing of expansion joints inside the tunnel wall.
  • Utility installation work is ongoing.
  • Upgrades are progressing for the maintenance of the drainage system including the installation of a new pump system.
  • A new generator for the pump house is on-site awaiting installation

Carleton Station
  • Platform utility work is ongoing.
  • Watermain installation has begun.
  • Backfilling between the MUP and the station will be upcoming in the next phase of work.

Carleton Station Multi-Use Pathway (MUP)
  • The drainage and underground MUP installations are ongoing.
  • Rideau River Pedestrian Bridge and Rideau River Rail Bridge
  • Sand blasting of the bridge is complete.
  • Bridge remedial works are ongoing with concrete repair of the pier upcoming.
  • North abutment refacing has commenced.
  • Jacking the rail bridge to begin repairs to support infrastructure is anticipated in late September.



Mooney’s Bay Station
  • Backfilling and formwork as well as rebar and concrete works for the platform are ongoing.
  • Electrical conduits have been installed in the platform.

Ellwood Diamond (VIA Rail crossing) Rail Bridge
  • All piers are being formed and work is ongoing.
  • Demolition of the OC Transitway Bridge is nearing final completion.
  • Preparing to start approach footings for pre-fabricated walls to be installed.

Walkley Maintenance and Storage Facility (MSF)
  • Drainage installation completed at west end of yard.
  • Gas line installation starting from south of MSF building is in progress.
  • The duct-bank work for the main power feed to the MSF main building completed. Vaults installation in progress.
  • Drilling for the watermain connection completed.
  • Construction of the inspection building and train wash building foundation wall completed. Under slab mechanical and electrical installation in progress.
  • Interior drywall, painting, electrical and mechanical rough-ins, and electrical wiring are progressing inside the MSF main building.
  • Rail installation is nearing completion at the light maintenance bay.

Walkley Station
  • Excavation for future station complete.
  • Construction of site access roads and the laydown area is complete.
  • Formwork, rebar, and concrete placement for wall construction is ongoing.
  • An existing section of the Walkley MUP has been temporarily closed with a detour in place until Fall 2021.

Greenboro Station
  • Existing platform structural steel installation completed.
  • The first pour for the platform is complete.
  • Guideway between Greenboro and Hunt Club Road
  • Excavation between South Keys station and Greenboro station completed.
  • Fence between South Keys and Greenboro station has started.
  • Retaining wall and propane gas line north of South Keys has begun.
  • Distribution slab west and south of South Keys has started.

South Keys Station
  • Waterproofing of concourse slab completed.
  • Light weight fill and mechanical installation under platform slab are in progress.
  • Platform slab will start at the end of September.
  • Train operator building substructure is expected to begin at the end of September.
  • A MUP detour will be implemented the week of September 20. Pedestrians and cyclists will be re-routed around the construction zone. Pedestrian and cyclist access will be maintained via the detour route to the existing Station.

Hunt Club Rail Bridge and Pedestrian (MUP) Bridge
  • Excavation and construction for crash wall footing has started.
  • Middle column grade beam has started.
  • Guideway between Hunt Club Road and Leitrim Road
  • Removal of fill between Airport split and Cahill on-going.
  • Watermain works at Ottawa South Pump Station (OSPS) completed and demobilized.
  • Fence from Leitrim Bridge to OSPS completed.
  • Airport lighting duct-bank installation has begun.



Leitrim Station
  • Staircase walls are complete.
  • Falseworks and formworks for station structural roof erected.
  • Platform retaining walls are in progress.
  • Watermain installation from Gilligan Road to station building in progress.

Earl Armstrong Rail Bridge
  • MSE wall construction is complete.

Bowesville Road Rail Bridge
  • The installation of granular load transfer platforms are complete.
  • Preparation to start vegetated wall installations has started with the first walls on both the east and west sides of the bridge.

Bowesville Station
  • Completion of station and faregate slab on grade.
  • South stair wall is poured and plan to complete concrete for North stair wall next week. The exit stairs walls are in progress.
  • Concrete work for the walls of the station building is ongoing including the east and west retaining walls.
  • Waterproofing on West retaining wall is ongoing.
  • North electrical duct bank is complete.
  • Underground mechanical at Bus Operator Building ongoing

Mosquito Creek Bridge
  • Concrete work to finalize the bridge is ongoing.

Limebank Elevated Guideway
  • North and south platform formwork is ongoing with rebar installation started for the platform diaphragms.
  • Deck rebar work is in progress.
  • Deck and parapet wall pours are close to completion.

Limebank Station
  • Installation and backfilling of underground electrical and mechanical under station footprint.
  • Completed waterproofing under slab on grades.
  • Concrete has been poured for the floor slab on grade for the faregate inside the Station and Operator Building.
  • Concrete work for concourse stairs is complete with exception of the pre-cast stair treads.
  • Removal of scaffolding from North and South Stair beams ongoing and expected to be complete at the end of this week.
  • Formwork for the exit stairs are ongoing.

Airport Parkway Rail Bridge
  • Waterproofing of bridge deck is complete.

Uplands Station
  • Formwork, rebar, and concrete works for the station wall are ongoing.
  • Backfilling of the station continues.
  • Construction of three of four MSE walls is in progress.
  • Structural steel installations are nearing completion.
  • Electrical service access and duct bank installation within station footprint are nearing completion.
  • Station underground electrical and mechanical installations have begun and are ongoing.

Uplands Drive Rail Bridge
  • Track installation is progressing from Paul Benoit Driveway to Uplands Drive Rail Bridge.

Airport Elevated Guideway
  • Final deck pour and parapet walls for the guideway is complete.
  • Approach slabs are complete.
  • Expansion joints are in progress.

Airport Station
  • Station steel installations are ongoing.
  • Painting of structural steel is ongoing.
  • Platform concrete curb and topping is ongoing.
  • Above platform electrical installation work is ongoing.
  • Track installation has begun on the Airport Link and will progress towards Hunt Club and the Cahill Drain.

https://mailchi.mp/f0dd308a3854/stage-2-lrt-south-construction-update?e=16641e8b73
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.