Quote:
Originally Posted by Harrison
How is it possible that an airport-link rail system will provide slower service to the CBD than an existing bus route? I cannot fathom that.
|
The City opted to extend the Trillium Line as far as possible instead of improving service along the existing line, which would have left enough money for a modest extension. This results in the maintenance of a 12 minute service, which makes it unfeasible to have direct Airport to Bayview service, which would result in dismal 24 minute frequencies to the airport and south suburb branches.
Because of this, riders will have to transfer three times, from Line 1, which has good 3-5 minute service, to Line 2 at Bayview, west of downtown, with its 12 minute service, and again at South Keys, a suburban shopping strip mall, to catch a Line 4 train to the airport. Transfers between Line 2 and 4 are supposed to be timed well enough to avoid long wait times, but we'll see how that works in practice.
Below is a map. The green line is Line 2, Bayview to Limebank, and the Line 4, South Keys to the Airport. The City probably could have double tracked, or at least done enough to increase frequencies to 6 minutes, the existing Line 2 and extend to the airport for the same price as doubling the length of all platforms and extending all the way to Bowesville (with Limebank funded by developers and the Province).
https://ottawa.ca/en/planning-developmen...ge-2-light-rail-transit-project/overview
It demonstrates how the City's priority is serving suburbs-downtown commuters over urban residents who might use the service regularly for all day to day movements.
It could be possible to one day upgrade Line 2 enough to provide Airport-Bayview service, but interlining will never happen as the City has doubled down on high floor DMUs (convertible to EMUs), incompatible with the low-floor Line 1 Confederation.