Quote:
Originally Posted by vannick
Developers shared with owners last week that move in will now be August 2023. almost an additional year added on. (for tower two specifically)
|
Oh wow. That’s a long time. They almost completed the concrete structure and even started work on sidewalks along Lougheed HWY. Good to know. Thanks.
Tower One looks even more completed, with crane removed back in July and lost of balconies been installed, however dual man elevator is still on it.