HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #701  
Old Posted Aug 10, 2021, 7:19 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
Quote:
Originally Posted by NicholasHui View Post
Traffic entering Highway 1 from Seymour Area has to cross the Mountain Highway Interchange traffic light which adds the congestion. They said it would last for one to two months until September or October
They updated the overnight lane closures until the first week of September. I don't think it will take that long to complete.
     
     
  #702  
Old Posted Aug 10, 2021, 8:05 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by Tvisforme View Post
Apparently, it is the same colour used for the Lions Gate Bridge.
They get a better deal if they buy enough paint to do two bridges instead of just one.
     
     
  #703  
Old Posted Aug 11, 2021, 5:07 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
Minor update



Quote:
A major component of the years-long Lower Lynn improvement project on Highway 1 is now in place and the end of the entire development is now mere months away.

Cars and trucks and things that go started crossing the refurbished Lynn Creek Bridge eastbound on Monday and westbound on Tuesday.

“We’re getting close,” said project manager Jay Porter. “It’s exciting.”

The bridge was taken out of service in March 2020 to be repainted in “Lions Gate green,” and have its steel supports recoated, its deck replaced and new safety features installed. The work will extend the 1960 bridge’s life by another 30 years.

Over the next four to six weeks, crews will build a new retaining wall just west of the bridge that will allow the Ministry of Transportation and Infrastructure to open up express and collector lanes, intended to help separate traffic bound for the Ironworkers Memorial Second Narrows Crossing from North Shore traffic.

“The traffic shift will provide better traffic flow and shorten time spent in traffic for people living and working in the area, which is always a welcome relief,” said North Vancouver-Seymour NDP MLA Susie Chant. The average number of daily crossings on the Ironworkers is now at about 95-per cent of pre-pandemic levels, Porter said.

The Exit 22 off-ramp is now reopened and 22A has been connected to Mountain Highway. Starting next week, crews will also repave the surface of the highway, which will require nightly lane closures, but Porter said apart from that, there will be no more major detours or disruptions.

The last and likely most impactful component, when it comes to alleviating rush hour congestion – combining the Dollarton Highway and Main Street on-ramps into one with an adaptive signal to control traffic flow – should be ready by mid- to late-September, Porter said. “That is it. The project is to be complete by October,” he added. “It’s pretty much just finishing up some small minor works after that”

The average number of daily crossings on the Ironworkers is now at about 95-per cent of pre-pandemic levels, Porter said.

The $200-million highway infrastructure project has been in progress for six years.

“People who live or work in North Vancouver have long been frustrated with their commutes,” said Bowinn Ma, Minister of State for Infrastructure. “These upgrades … will help improve safety and reliability.”
https://www.nsnews.com/local-news/with-l...ighway-1-project-nearly-complete-4210442
     
     
  #704  
Old Posted Aug 11, 2021, 11:08 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,407
Six years? It feels like the construction has been in for many two years. Anyways, great to see this being so close to completion even though no extra through lanes were added.
     
     
  #705  
Old Posted Aug 11, 2021, 9:09 PM
flipper316 flipper316 is offline
Registered User
 
Join Date: Dec 2016
Posts: 887
From the pics it looks like there's no cats eyes reflectors or reflectors on the barriers.
     
     
  #706  
Old Posted Aug 11, 2021, 11:23 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,516
Quote:
Originally Posted by flipper316 View Post
From the pics it looks like there's no cats eyes reflectors or reflectors on the barriers.
And zero shoulder on the left side is PURE B.C.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #707  
Old Posted Aug 11, 2021, 11:37 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,997
Quote:
Originally Posted by s211 View Post
And zero shoulder on the left side is PURE B.C.
Is that the final lane configuration though? Seems to be enough shoulder room on the right to shift the lanes over s little to add shoulder room on the left.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #708  
Old Posted Aug 14, 2021, 2:54 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
With the alignment back they're going to pave everything.

Quote:
HWY 1 Westbound Paving Operations – AUG 15-AUG 18 – 9PM to 5AM – Exit 22A Detour in effect as required.

HWY 1 Eastbound Paving Operations – AUG 19-AUG 20 – 10PM to 6AM – Exit 21 Detour in effect as required.
     
     
  #709  
Old Posted Aug 14, 2021, 2:55 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
It looks final to me. Probably better to have even a small shoulder on the right side vs the left.

Revamped Lynn Creek Bridge opens with iconic look by B.C. Ministry of Transportation and Infrastructure, on Flickr
     
     
  #710  
Old Posted Aug 16, 2021, 2:24 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888

link

Paving
     
     
  #711  
Old Posted Aug 16, 2021, 3:03 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
They also closed the Main Street onramp last night doing work on that island next to the new overpass. Looks like they cut the road to connect some power/cable to the new section of the onramp.
     
     
  #712  
Old Posted Aug 21, 2021, 2:21 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888

DriveBC

Looks like traffic diverted for paving of the eastern part.
     
     
  #713  
Old Posted Aug 21, 2021, 6:32 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
I think they were late again opening up the lanes. They started last night at night working on the inner lane. I think they finished the outer lane the day before.
     
     
  #714  
Old Posted Aug 23, 2021, 3:09 PM
FarmerHaight's Avatar
FarmerHaight FarmerHaight is offline
Peddling to progress
 
Join Date: Jul 2019
Location: Vancouver's West End
Posts: 1,631
East side is open to traffic, drove on it this morning. Still some work to do for the on/off ramps though.
__________________
“Nothing compares to the simple pleasure of riding a bike” – John F Kennedy
     
     
  #715  
Old Posted Aug 23, 2021, 9:44 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
There were some massive dips in the east bound lanes near the Lynn Creek Bridge section.
     
     
  #716  
Old Posted Aug 27, 2021, 11:09 PM
Repthe250 Repthe250 is offline
Registered User
 
Join Date: Mar 2021
Location: Kelowna, BC
Posts: 451
Quote:
Originally Posted by jollyburger View Post
There were some massive dips in the east bound lanes near the Lynn Creek Bridge section.
Typical BC engineering. Dips and humps on major freeways are a BC signature. (Along with tight curves and invisible road markings)
     
     
  #717  
Old Posted Aug 27, 2021, 11:10 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
They had a dump truck dropping off gravel or something with an excavator finishing off the base for the new Main Street onramp section. With the long weekend I guess they might finish by the end of September.
     
     
  #718  
Old Posted Aug 31, 2021, 3:52 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,720
Camera is back on for the Mountain Highway exits. It looks like they've finished a lot of grading on the new onramp. It still seems like two more weeks of work left.
     
     
  #719  
Old Posted Sep 1, 2021, 5:27 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by jollyburger View Post
Camera is back on for the Mountain Highway exits. It looks like they've finished a lot of grading on the new onramp. It still seems like two more weeks of work left.
Someone unplugged it and plugged it back in at last...


DriveBC Webcam

Asphalt on Dollarton onramp
     
     
  #720  
Old Posted Sep 1, 2021, 6:17 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,796
the new eastbound main street on-ramp seems to have a ways to go still
__________________
i have no idea what's going on
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.