[QUOTE=GoTrans;9367963][QUOTE=swimmer_spe;9367769]If you think they are just disappointing me in how they handle Via, you really don't know me.
For the Canadian, are you suggesting getting rid of the northern route?
For the Maritimes, return the Gull.
Quote:
I would keep a train but only 1x per week on the CN route except route it via Regina to Saskatoon. If the schedule goes back to 2 or 3 per week, I would route it via Thunder Bay to Sudbury. In the interim the route vis SSM should be examined to determine the ridership and operational feasibility.
If frequencies are increased beyond 3/wk then the extra trains should be Vancouver Winnipeg via Calgary. At that point I think all trains should terminate in Winnipeg. The CN route in northern ON should operate 2/wk and via Thunder Bay the balance of the time. As mentioned before if the government lets Rocky Mountaineer Train have its way then the train should be truncated at Calgary. I don’t know if we will ever see the day where we have daily trains on either route in northern ON.
|
I am not for adding service at the cost of service. Leave the existing route as is, and let it grow as needed.
The issue with SSM is not ridership, but track condition. Running passenger service along it would require extensive track work. Not saying it shouldn't be done, but helping you understand the challenges for that.
Quote:
Originally Posted by JHikka
Firstly, a train from Boston to Halifax will never compete with flying due to geography.
Secondly, there isn't enough demand in NB alone for a rail service to Boston.
Returning service to the NB corridor (Saint John-Moncton-Halifax) is more feasible but even then would need significant passenger numbers in NB to warrant route expansion...and would have to navigate the multinational oil company that operates NB.
|
I'd be happy if they just added the Saint John-Halifax train. The Gull is one of those ''it'd be nice' things.
Quote:
Originally Posted by someone123
A simple starting point would be to restore something resembling previous service levels from Moncton to Halifax for a while. Make it possible for people to go back and forth between the two cities on the train any day of the week.
|
Agreed, but go to Saint John.
Quote:
Originally Posted by Truenorth00
Can we rename this thread to national rail discussion. And make an actual thread for VIA Rail, so we can discuss the actual projects going on?
|
There are actual projects going on? Only thing I know if are the Charger fleet. Post away....
Quote:
Originally Posted by GoTrans
There is not enough going on in terms of construction, re-instating service, new service or reducing service to make it worthwhile, even in the long term. The national rail service is Via Rail. Until AB does a HSR or HFR between Calgary and Edmonton or the Banff proposal goes ahead, there is only Via Rail.
|
I guess he only wants notifications once every few months.