A new townhouse project has been proposed. Apparently named after the property owners of the two single-family houses being replaced (Lara K. Jones & David Dean), LaraDean Townhomes will have have 14 townhouses that are four floors tall (3+ rooftop level).
The project will be directly to the west of CW Urban's The Mary townhouse project.
Project Summary (from developer):
The project will replace 2 single family residences with 14 single-family attached townhomes. The total site is 0.45 acres and will have a density of 31.1 units / acre.
The project consists of two separate wood frame buildings. The exterior materials are stucco. In total there are fourteen units consisting of 2 different types of units - Unit type A (12): 3 bedroom , 2.5 bath unit with 17,50 square feet of conditioned space. Unit type B(2): 2 bedroom, 2.5 bath units with 1,687 square feet of conditioned space.
The primary access to the units will be sidewalks along 800 N. The garages will be accessed via a drivelane in between the east and west buildings.
Project Rendering
Additional Renderings
Project Location
Site Plan
Elevations
Site Elevation