HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


Closed Thread

 
Thread Tools Display Modes
     
     
  #19881  
Old Posted Aug 9, 2021, 8:48 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,731
Renovate Sinclair Centre all they want but just leave all the heritage portions alone: meaning no tall tower. The complex should be considered a heritage site as a whole, not just pieces of wall.
     
     
  #19882  
Old Posted Aug 9, 2021, 10:28 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,072
     
     
  #19883  
Old Posted Aug 9, 2021, 10:38 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,529
Terrace House

Quote:
In the Matter of a Plan of Compromise and Arrangement of Port Capital Development (EV) Inc. and Evergreen House Development Limited Partnership
...
[39] At the June 8, 2021 hearing, the Monitor provided its Confidential Seventh Report. The Monitor indicated that, on June 4, 2021, it received two additional cash offers:

a) Landa submitted a third revised offer ($22 million) (“Landa Offer #3”); and

b) Solterra submitted a second “backup” revised offer on a “without prejudice” basis (the “Solterra Backup Offer”). This rider was in relation to Solterra’s argument that the Court should have approved Solterra Offer #1 on May 25, 2021. The Solterra Backup Offer was sealed and not publicly made available, save to CMLS and Aviva. However, the Monitor advised all stakeholders that the Solterra Backup Offer was superior in value to Landa Offer #3.

[40] In addition, on June 4, 2021, the Monitor received a revised offer from 129 (the “129 Revised Offer”). In support, Mr. Reyes provided his Affidavits #3 and #4 sworn June 4 and 7, 2021, essentially referring to revisions to the 129 Offer and the removal of further conditions, as I will describe in greater detail below. In the Seventh Report, the Monitor reported that the 129 Revised Offer would result in a “materially better” outcome for the stakeholders than both Solterra Offers and Landa Offer #3.

[41] At the hearing, Landa conceded that Landa Offer #3 should not be approved in the face of the 129 Revised Offer. Landa proposed that Landa Offer #3 should stand as a backup offer in the event that the 129 Revised Offer was court approved, but failed to close for any reason.

...

[93] Without the 129 Revised Offer, the remaining issue is what other offers should be considered by the Court and, if appropriate, approved.

[94] Solterra takes the position that the Court should disregard the offers received after May 25, 2021 and that the Court should approve Solterra Offer #1 ($21 million). Solterra argues that it adhered to the sales process implemented by the Monitor and that it would be unfair if the Court approved any other offer. Solterra particularly objects to Landa Offer #2, arguing that Landa Offer #1 essentially stood as a stalking horse bid. Solterra refers to Landa Offer #2 as only slightly “beating” Solterra Offer #1 (about 4%), having had the benefit of disclosure of the price under Solterra Offer #1.

...

[106] Needless to say, the landscape changed quite significantly in the two-week period leading up June 4, 2021. Leaving aside the 129 Revised Offer with its ongoing improvements and removal of subjects, there was further jockeying between Landa and Solterra with their June 4, 2021 offers. In short, the submission of Landa Offer #3 and the Solterra Backup Offer to the Monitor are matters that, in my view, the Court should not ignore in terms of considering the various offers.

[107] I have concluded that, although there has been some unfairness in the sales process in relation to Solterra, it is not appropriate that I approve Solterra Offer #1 at this time. Faced with the substantial interest and increasingly higher bids from both Landa and Solterra leading to May 25, 2021, I may have been inclined to order one last round of sealed bids for Landa and Solterra. However, by and large, Landa and Solterra embarked themselves upon a further sealed bid process leading to the June 8, 2021 hearing.

[108] The Monitor emphasizes in its Confidential Seventh Report that the price under Solterra Backup Offer was increased by a significant sum, in the millions of dollars and well above that of Landa Offer #3. It will satisfy the priority debt - the professional charges and the Interim Lending Facility - and provide almost full payment to CMLS.
...

[112] Solterra Backup Offer is approved.
https://www.bccourts.ca/jdb-txt/sc/21/12/2021BCSC1272.htm
     
     
  #19884  
Old Posted Aug 9, 2021, 10:43 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by madog222 View Post
Lol
     
     
  #19885  
Old Posted Aug 10, 2021, 5:32 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,108
Quote:
Originally Posted by Vin View Post
Renovate Sinclair Centre all they want but just leave all the heritage portions alone: meaning no tall tower. The complex should be considered a heritage site as a whole, not just pieces of wall.
The Sinclair Centre is 80m x 80m, so 6,400 sq. metres of land. The Post is 80m x 150m, so 12,000 sq. metres. They're building just under 130,000 square metres in total on the Post, (11 FSR) including the heritage podium, and the Sinclair Centre is aiming at 80,000 to 100,000, so the proposal is going to have to be something like the two Post towers back-to-back, and slightly taller. Those are around 85m high and the Sinclair Centre proposal is for 17 to 20 FSR, and it can go to 106m (around 29 storeys) before hitting a viewcone.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
     
     
  #19886  
Old Posted Aug 10, 2021, 7:21 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,731
Quote:
Originally Posted by Changing City View Post
The Sinclair Centre is 80m x 80m, so 6,400 sq. metres of land. The Post is 80m x 150m, so 12,000 sq. metres. They're building just under 130,000 square metres in total on the Post, (11 FSR) including the heritage podium, and the Sinclair Centre is aiming at 80,000 to 100,000, so the proposal is going to have to be something like the two Post towers back-to-back, and slightly taller. Those are around 85m high and the Sinclair Centre proposal is for 17 to 20 FSR, and it can go to 106m (around 29 storeys) before hitting a viewcone.
Look at the four heritage building footprints and the aerial view of the complex: there is no room for a tower unless some or all of the buildings are partially demolished. This should not be allowed in a city with so little heritage structures left. Just leave them alone and do some light renovations. The Feds are in no business to make money in this city. They also have a lot to learn from Europe or even Montreal.
     
     
  #19887  
Old Posted Aug 10, 2021, 7:32 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,072
Quote:
Originally Posted by Vin View Post
Look at the four heritage building footprints and the aerial view of the complex: there is no room for a tower unless some or all of the buildings are partially demolished. This should not be allowed in a city with so little heritage structures left. Just leave them alone and do some light renovations. The Feds are in no business to make money in this city. They also have a lot to learn from Europe or even Montreal.
The buildings need significant seismic upgrades regardless.
     
     
  #19888  
Old Posted Aug 10, 2021, 7:44 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,108
Quote:
Originally Posted by Vin View Post
Look at the four heritage building footprints and the aerial view of the complex: there is no room for a tower unless some or all of the buildings are partially demolished. This should not be allowed in a city with so little heritage structures left. Just leave them alone and do some light renovations. The Feds are in no business to make money in this city. They also have a lot to learn from Europe or even Montreal.
What money are they going to be making? If they build the new Sinclair Centre additional office space, then it's still going to be a Federal building. They're trying to save money (that they currently pay in rent in all the buildings they don't own that they currently occupy). The interior space in the atrium is already totally changed from when they were four separate buildings.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
     
     
  #19889  
Old Posted Aug 10, 2021, 7:54 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,731
Quote:
Originally Posted by Changing City View Post
What money are they going to be making? If they build the new Sinclair Centre additional office space, then it's still going to be a Federal building. They're trying to save money (that they currently pay in rent in all the buildings they don't own that they currently occupy). The interior space in the atrium is already totally changed from when they were four separate buildings.
All the more they should not make it worse. The atrium looks alright because some of the old facade walls facing the old lane are still there. The "mall" is basically a glass canopy covering the old alley, although one must admit quite a bit of old structures had already been torn down.

Can you imagine an office tower looming from the middle of these beautiful heritage buildings? Knowing what types of new structures get built here, I would think the result will be a disaster.
     
     
  #19890  
Old Posted Aug 10, 2021, 8:21 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,108
Quote:
Originally Posted by Vin View Post
All the more they should not make it worse. The atrium looks alright because some of the old facade walls facing the old lane are still there. The "mall" is basically a glass canopy covering the old alley, although one must admit quite a bit of old structures had already been torn down.

Can you imagine an office tower looming from the middle of these beautiful heritage buildings? Knowing what types of new structures get built here, I would think the result will be a disaster.
Yes, I can imagine a significant office tower set back from the facades of the heritage buildings. I think it could work out fine, especially as the office buildings in the past decade haven't been 'a disaster' as far as I'm concerned - in fact some have been very successful. The MNP Tower, The Exchange and The Post add significant new office space above heritage buildings, and MNP is also immediately behind the best heritage building in the city, without being 'a disaster'.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
     
     
  #19891  
Old Posted Aug 10, 2021, 9:43 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,053
Keep the north building (the only one that looks decent on all four sides) and gut the others. Let's get a proper office tower out of this.
     
     
  #19892  
Old Posted Aug 10, 2021, 11:20 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,601
Quote:
Originally Posted by madog222 View Post
Gawd, what a load of hooey:

..“Density [on the site] has never increased since a hundred years ago and the conservative sturdy stone buildings interact less and less with the urban fabric of a young, dynamic metropolis and important gateway to Asia. Sitting near the edge of the Pacific, globalization has largely passed the Sinclair Centre by,” states the federal government’s rationale for the project...

Please Mr. Trudeau, explain how a highrise dropped in the middle of that is going to "interact with the urban fabric of a young, dynamic metropolis and important gateway to Asia" any better than what is there (unless they tear down the heritage facade). It wasn't that long ago the Feds announced they'd be selling off office buildings.
     
     
  #19893  
Old Posted Aug 10, 2021, 11:22 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,529
Quote:
Originally Posted by Migrant_Coconut View Post
Keep the north building (the only one that looks decent on all four sides) and gut the others. Let's get a proper office tower out of this.
The red brick one?
It's interesting that the ones with the ornate facades facing Hastings St. might have pretty plain north sides facing the alley,
while the red brick one seems to be consistent on all 4 sides.
The L-shaped one can definitely be hollowed out.

With the height limits, it may be hard to design a "hovering" building that keeps any of the existing buildings intact,
but conceivably, they could have 4 big stilts/shear walls (3 of them in the former alleys) with a massive transfer slab above.
Think former Citicorp Tower NYC with a bigger floorplate.



https://dailyhive.com/vancouver/sinclair...PAqWYNoN_zQV9HoWUkgQqttbPGsPNMA2dQlOf2eE


https://www.amny.com/news/former-citicorp-center-38-new-yorks-youngest-landmark/

Last edited by officedweller; Aug 10, 2021 at 11:32 PM.
     
     
  #19894  
Old Posted Aug 10, 2021, 11:32 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,108
Quote:
Originally Posted by whatnext View Post
Gawd, what a load of hooey

It wasn't that long ago the Feds announced they'd be selling off office buildings.
That was 2004 - there are people posting here who weren't born when the Feds considered selling their office buildings. If they were to try that today, all the proceeds would be claimed by First Nations, and it would cost them even more to create office space for Federal employees. That's why they haven't sold Downtown real estate, and why they're revisiting adding space at the Sinclair Centre.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
     
     
  #19895  
Old Posted Aug 10, 2021, 11:42 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by officedweller View Post
The red brick one?
It's interesting that the ones with the ornate facades facing Hastings St. might have pretty plain north sides facing the alley,
while the red brick one seems to be consistent on all 4 sides.
The L-shaped one can definitely be hollowed out.

The MNP/Exchange towers were mostly built to the side of the existing heritage buildings so it would be fun to see how they would build a tower in the direct center of the site without the large parking garage doors access they had at The Post.
     
     
  #19896  
Old Posted Aug 11, 2021, 12:16 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,053
Quote:
Originally Posted by officedweller View Post
The red brick one?
It's interesting that the ones with the ornate facades facing Hastings St. might have pretty plain north sides facing the alley,
while the red brick one seems to be consistent on all 4 sides.
The L-shaped one can definitely be hollowed out.

With the height limits, it may be hard to design a "hovering" building that keeps any of the existing buildings intact,
but conceivably, they could have 4 big stilts/shear walls (3 of them in the former alleys) with a massive transfer slab above.
Think former Citicorp Tower NYC with a bigger floorplate.
That's the one. The Chateauesque fronts on Hastings are worth keeping, but the buildings themselves, not so much.

Worth noting that a contractor screwup when building Citigroup almost levelled half of Midtown. At any rate, the Sinclair design team would have to get creative with the floor plan to put the columns in, and at that point it's just as easy to rework the whole interior and build the tower conventionally.
     
     
  #19897  
Old Posted Aug 11, 2021, 2:57 AM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,537
This is the only form of redevelopment I would accept - keep all the heritage buildings except the PoMo-renovated portions of the L building, offset the core to maintain the atrium space and have the tower float high enough above the buildings to allow light to come into the central space from the south via spider glass walls coming up to the tower soffit.



Queen Richmond Centre in Toronto for example:
     
     
  #19898  
Old Posted Aug 11, 2021, 2:59 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,921
Like your idea, but isn’t your tower already too high for the view cones?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #19899  
Old Posted Aug 11, 2021, 3:00 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,108
Quote:
Originally Posted by jollyburger View Post
The MNP/Exchange towers were mostly built to the side of the existing heritage buildings so it would be fun to see how they would build a tower in the direct center of the site without the large parking garage doors access they had at The Post.
I think the Exchange tower structure goes right through the old Stock Exchange building. That was why it made a better hotel than office space - a lot of extra columns, as well as the original ones. MNP was just a facade retention, with some of the side wall.

The Winch Building (the Hastings building to the west, beyond the old Post Office), is 1909 and had an interesting structure that isn't what you'd build today. It's 1909, and a hybrid of steel and reinforced concrete, but without much in the way of cross bracing (although the Henriquez makeover will have partly improved that, but not to current standards).

Here's a VPL image

__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
     
     
  #19900  
Old Posted Aug 11, 2021, 9:45 AM
trofirhen trofirhen is online now
Registered User
 
Join Date: Oct 2008
Posts: 9,045
Omg! .... Wtf !

Excuse me, I just tuned in to this thread after a hard day on the borderlands of life.
I cannot believe that the feds want to take the Sinclair Centre and suspend a building over it, ruining the exterior aesthetic and cutting daylight from the courtyard.
It is documented that Vancouver has one of the lowest office space markets available anywhere in North America, so, unless they're too desperate for cash to do so
why not find a choice downtown lot - and there surely must be a couple somewhere- and build that never-built I.M. Pei design *1, lease part of for federal offices, and the rest at market?
That way, you get: a Sinclair Sentre unmutilated, unmolested. ... a fabulous design aching to be made manifest; ... and a building able to charge top rates to to its design prestige.
This Sinclair Centre is pathetic. Surely they could come up with a more elegnt solution than this !!
*1 The building never built at Pacific Centre where TD now stands
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:10 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.