HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1081  
Old Posted Jun 17, 2021, 12:02 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,978
I'm really hoping this zipline attraction works, but I have a hard time believing that enough people have 39$ to spend for a 40sec ride between two construction site. Something like that would work if/when Zibi becomes something like Montreal Vieux Port and the zipline is one of many thing to do in that area.
Reply With Quote
     
     
  #1082  
Old Posted Jun 17, 2021, 1:12 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by SL123 View Post
I'm really hoping this zipline attraction works, but I have a hard time believing that enough people have 39$ to spend for a 40sec ride between two construction site. Something like that would work if/when Zibi becomes something like Montreal Vieux Port and the zipline is one of many thing to do in that area.
They've been good at attracting events to the area each summer, with Cirque du Soleil, the Beer Fest, drive-in movies and concerts. By next year, Booth/Eddy streets should be pretty much complete, which will result in a much more walkable experience between the two cities. You've got the Chaudière Falls (if they could bring back 2017's Mìwàte, that would be awesome) and the new park at the tip of Chaudière Island.

What's missing is bars and restaurants. Only one, Le Petit Chicago, is set to move on the Gatineau side thus far.
Reply With Quote
     
     
  #1083  
Old Posted Jun 17, 2021, 2:09 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
I go for walks in the area regularly, came across the park planting plan the other day.

Reply With Quote
     
     
  #1084  
Old Posted Jun 22, 2021, 12:39 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
Zibi 'will be a place at the end of 2021,' lead developer says
Mixed-use neighbourhood along Ottawa River will be in spotlight Tuesday with launch of interprovincial zipline

By: David Sali, OBJ
Published: Jun 21, 2021 5:58pm EDT




When local tourism luminaries and politicians gather at the Zibi neighbourhood just west of downtown Gatineau on Tuesday afternoon for the official launch of what’s being billed as the world’s “first interprovincial zipline,” it’s doubtful anyone will have a bigger smile than Jeff Westeinde.

The veteran Ottawa real estate developer is a principal in Theia Partners, which is spearheading the multibillion-dollar Zibi project along with Toronto’s Dream Unlimited.

After years of watching his vision for the 34-acre mixed-use neighbourhood unfold in slow, methodical fashion, Westeinde sees the next few months as a watershed time for the development that straddles both sides of the Ottawa River.

“Zibi will be a place at the end of 2021,” he told OBJ in a recent interview. “There will be lots of things to do.”

Two winners of an online charity auction, will have the honour of taking the inaugural zip across the river at 1:45 p.m. on Tuesday. For Westeinde and his partners, that trip will also serve as the unofficial kickoff for what’s expected to be an eventful next few months at Zibi.

While the zipline is expected to draw a hefty contingent of visitors to the site this summer, it’s the people who are committed to being there year-round that really have Westeinde and his partners excited.

By the end of 2021, six of the neighbourhood’s 44 proposed buildings will be occupied by residents and office workers. About 21,000 square feet of finished office space is now available for lease ​– including 14,000 square feet on the top floor of a eight-storey, 158,000-square-foot class-A building next to Chaudière Falls that features the federal government as the anchor tenant.

The new building is designed to be carbon-neutral, thanks to a system that uses energy captured from effluents at the nearby Kruger paper plant in Gatineau for heating and water from the Ottawa River for cooling.

Over the next five years, the developers are planning to construct three more buildings totalling more than 200,000 square feet of retail and office space that will employ the same green-energy technology.

Westeinde said a growing number of companies, especially in the tech and knowledge-based sectors, are keen to plant their flag at Zibi due in large part to the builders’ commitment to sustainable energy principles.

“We’re zero-carbon out of the gate,” he said. “It’s so easy for companies to come in and automatically hit a lot of their (environmental, social and governance) goals just by being on our site.”

Avison Young principal Lindsay Hockey, who is overseeing the office and retail leasing process at Zibi, says there’s been a flood of interest from potential tenants.

“It’s been refreshing, actually,” he said in a recent interview. “We’re not just focused on tenants who’ve resided in office buildings in Ottawa. We’re looking all over the place for companies that want to be a part of something (sustainable) and are willing to move and set up in Ottawa.”

Other companies are already on board, including co-working giant Spaces, which has about 65,000 square feet of space ready for occupancy at Zibi in two locations on either side of the river.

Meanwhile, the site’s first two condo buildings, totalling about 170 units, are now occupied, and a 17-storey highrise with about 160 rental units at the foot of the Chaudière Bridge will start leasing this fall.

In addition, construction is slated to begin this summer on two other major developments – a 22-storey, 250-unit tower on the Ottawa side that’s being developed in conjunction with New York-based communal living provider Common and a 10-storey highrise in Gatineau with about 130 rental units. Both buildings are expected to be ready for occupancy by 2023.

The developers anticipate that between 400,000 and 600,000 square feet of new office, retail and residential space will be added to Zibi each year through 2027. When complete, the site is expected to house 5,000 residents and employ 6,000 people in more than a million square feet of space.

Westeinde said it’s all part of a plan that’s coming together nicely.

“It is absolutely great for us to finally be able to point to the things we’ve been talking about for all these years.”

https://www.obj.ca/article/real-estate/zibi-will-be-place-end-2021-lead-developer-says
Reply With Quote
     
     
  #1085  
Old Posted Jun 22, 2021, 12:50 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
This is the first time that I have seen the new tower referred to as 22 stories, not 25 stories. It would be a shame if they chopped that tower, it has pretty cool architecture.
Reply With Quote
     
     
  #1086  
Old Posted Jun 22, 2021, 2:18 PM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,978
Quote:
Originally Posted by Harley613 View Post
This is the first time that I have seen the new tower referred to as 22 stories, not 25 stories. It would be a shame if they chopped that tower, it has pretty cool architecture.
I think they got most of their number wrong. they also mention a "17-storey highrise with about 160 rental units at the foot of the Chaudière Bridge will start leasing this fall" its actually a 15 stories tower. They also mention a upcoming 10 storey in gatineau that is news to me, I thought the next residential on the Gatineau side was the O2 the twin of the O that is 5-6 stories high
Reply With Quote
     
     
  #1087  
Old Posted Jun 22, 2021, 7:57 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by SL123 View Post
I think they got most of their number wrong. they also mention a "17-storey highrise with about 160 rental units at the foot of the Chaudière Bridge will start leasing this fall" its actually a 15 stories tower. They also mention a upcoming 10 storey in gatineau that is news to me, I thought the next residential on the Gatineau side was the O2 the twin of the O that is 5-6 stories high
Seems it is O2. They may have increased the height and made it rental only.

Reply With Quote
     
     
  #1088  
Old Posted Jun 23, 2021, 12:05 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
Crossing to Quebec the 'Interzip' way
Civic officials hope the first interprovincial zip line will add spice to the region's tourism industry, crippled by the COVID-19 pandemic.

Blair Crawford, Ottawa Citizen
Publishing date: Jun 22, 2021 • 21 minutes ago • 3 minute read




I’m dangling 12 storeys above the Ottawa River, zipping along at more than 40 km/h toward Quebec on 430 metres of thin steel cable.

Welcome to Interzip Rogers, the world’s first interprovincial zipline, which takes daring travellers with a need for speed and no fear of heights from Chaudière Island in Ontario to Gatineau.

The attraction launched Tuesday on the Zibi site near the Chaudière Bridge with first-ride honours going to Valérie Ducharme and Charles-Antoine Turpin, whose winning bid in an online auction raised $27,000 for charity.

Civic officials hope the attraction will add zip — literally — to the region’s tourism industry, which has been crippled by the COVID-19 pandemic.

“We are super excited about this attraction and what it’s going to bring to the region this summer,” said Michael Crockatt, president and CEO of Ottawa Tourism.

“People are always asking, ‘What’s new in the city?’ and, with the pandemic, there hasn’t always been that much to talk about it,” he said. “But this is something that’s brand new, something that will give people a sense of urgency to visit the city.”

The zip line has been in planning for more than three years and was to have opened in 2020, but for the pandemic. The structure was built by Zipline Construction of Whistler, B.C., which boasts it has installed more than 150 kilometres of zipline at sites around the world. Day-to-day operations are handled by Great Canadian Bungee of Wakefield.



“It’s unusual to have an urban zipline like this. More often you’ll see them in the mountains,” said Alex Van Dieren of Orkestra, the marketing company for Interzip Rogers.

“Having this right in the middle of the city, right between two museums — the Canadian War Museum and the Canadian Museum of History — is something that’s very special.”

One might think an interprovincial attraction like this might be held together by red tape alone, but Van Dieren said both Ottawa and Gatineau were on board from the beginning.

“Right out of the gate, the two cities have been fully supportive,” he said. “They just decided we’ll work together to make this happen.”

When it’s my turn to ride, I’m outfitted with a helmet and a harness at the ticketing office on the ground floor of Zibi’s “O” condominiums on Rue Jos Montferrand in Gatineau. After a short walk across the Chaudière Bridge to the tower where instructors help me in to the awkward-feeling web harness — imagine strapping on a lawn chair — it’s up 4 1/2 flights of stairs to the top.

There, 40 metres above the Ottawa River, staff snug up the webbing and affix the double pulley system to the cable, then clip in a second safety line as backup. Before I know it, a steel safety gate rolls aside and I’m off.

The views are spectacular, Parliament Hill to the right, the Zibi development and Chaudière Falls to the left, and downtown Gatineau straight ahead. The pulley whirs above my head like a jet engine and before I know it the landing platform seems to rush toward me. I can see the staff motioning for me to assume the correct landing posture, with my hands on the overhead bar and knees pulled up. Those are literally the only instructions I have to follow and I’ve managed to forget it since leaving the platform 35 seconds earlier. With a jerk and a jolt, I’m back on Terra Firma.

The ride lasts between 35 and 40 seconds, or about a dollar a second.

And, after 18 months of COVID-19 lockdown, worth every penny.
  • What: Interzip Rogers interprovincial zipline
  • Where: 40 Rue Jos-Montferrand, Gatineau
  • When: Weekdays 12 p.m. to 5 p.m.; Weekends 9 a.m. to 6 p.m.
  • Who: Children and adults who weight at least 70 pounds and no more than 275 pounds
  • How much: Adults $39.99, Kids under 14 $29.99
  • How to book: interzip.ca or by phone at (613) 695-5248

• Video Link


https://ottawacitizen.com/news/local-news/crossing-to-quebec-the-interzip-way
Reply With Quote
     
     
  #1089  
Old Posted Jun 23, 2021, 1:59 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
What a joke. The incredibly scenic zipline in the Old Port of Montreal is $19.99 and when you book it offers you a second ride for $9.99. Why would I pay $39.99 for a single ride through a construction site? Ridiculously overpriced.
Reply With Quote
     
     
  #1090  
Old Posted Jun 23, 2021, 12:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Profile on an Indigenous company working at Zibi. French article.

https://ici.radio-canada.ca/nouvelle/180...gnie-algonquine-anichinabee-kitigan-zibi
Reply With Quote
     
     
  #1091  
Old Posted Jun 23, 2021, 2:13 PM
OTownandDown OTownandDown is online now
Registered User
 
Join Date: Jul 2018
Posts: 1,637
Don't get too bitter, Harley. Supply and demand, supply and demand.

Have a couple beers on the Beau's patio before you go, and you'll forget all about the cost.

Quote:
Originally Posted by Harley613 View Post
What a joke. The incredibly scenic zipline in the Old Port of Montreal is $19.99 and when you book it offers you a second ride for $9.99. Why would I pay $39.99 for a single ride through a construction site? Ridiculously overpriced.
Reply With Quote
     
     
  #1092  
Old Posted Jun 23, 2021, 4:26 PM
Marshsparrow Marshsparrow is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,680
"Bringing the provinces together... " a zipline? Oh okay...
Reply With Quote
     
           
     
  #1094  
Old Posted Jul 26, 2021, 1:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
From RailFans Discord:

Reply With Quote
     
     
  #1095  
Old Posted Aug 5, 2021, 1:22 AM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,978
Brick Work Update: Aug 4 2021


I like the big glass section showing the zibi heating and cooling facility
Reply With Quote
     
     
  #1096  
Old Posted Aug 5, 2021, 1:46 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
That little office building is becoming one of the handsomest buildings in Ottawa IMHO. In an endless sea of mediocrity it really stands out. It's a little glimpse at what we could have if developers cared about materials and architecture. I'm really hoping Mizrahi's Island Park tower will be another example.
Reply With Quote
     
     
  #1097  
Old Posted Aug 5, 2021, 10:18 AM
Brannwagon Brannwagon is offline
Registered User
 
Join Date: Nov 2019
Location: Ottawa, ON
Posts: 103
Quote:
Originally Posted by Harley613 View Post
That little office building is becoming one of the handsomest buildings in Ottawa IMHO. In an endless sea of mediocrity it really stands out. It's a little glimpse at what we could have if developers cared about materials and architecture. I'm really hoping Mizrahi's Island Park tower will be another example.
Completely agree. Something like this would be commonplace in other cities across Canada, even in smaller hubs like KW. In Ottawa, however, it really does stand out and acts as a reminder of what the alternative could be when we continually settle for Claridge's commie blocks.
Reply With Quote
     
     
  #1098  
Old Posted Aug 5, 2021, 1:05 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,620
Quote:
Originally Posted by Brannwagon View Post
Completely agree. Something like this would be commonplace in other cities across Canada, even in smaller hubs like KW. In Ottawa, however, it really does stand out and acts as a reminder of what the alternative could be when we continually settle for Claridge's commie blocks.
Commonplace in KW? I think perhaps we are getting a bit carried away.
Reply With Quote
     
     
  #1099  
Old Posted Aug 21, 2021, 6:17 PM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 486
Crane is going up on the Ontario side.
Reply With Quote
     
     
  #1100  
Old Posted Aug 21, 2021, 7:28 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
I think they are building both of these blocks at the same time

Capture by harley613, on Flickr

2 by harley613, on Flickr

Last edited by Harley613; Aug 21, 2021 at 8:28 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 2:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.