Old Posted Mar 22, 2021, 8:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oak should have the 3rd floor slab pour done by end of week. Forming for 3rd floor walls already starting on west end.
Reply With Quote
     
     
  #2942  
Old Posted Apr 11, 2021, 2:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Forming the 4th floor slab now well underway. The landscaping is now started for the previous building with external finishing and the internal units being completed. Might see the first tenants in June.
Reply With Quote
     
     
  #2943  
Old Posted Apr 17, 2021, 1:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
LFP article on the building boom in Middlesex county. These London bedroom towns are seeing record building booms.


https://lfpress.com/news/local-news/buil...d-for-homes-booms-in-smaller-communities
Reply With Quote
     
     
  #2944  
Old Posted Apr 17, 2021, 6:33 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,912
The soaring population of Strathroy & MC reflects London's fast growth.

It will require some major investments from the areas including a twinning of road between Commissioners and the 402, a commuter bus system, and a major new high school.

The latter is key and already overdue. SDCI is already at capacity and the town is growing fast. Much of this is due to the huge area that SDCI caters to. A high school in Komoka would not only serve Kom/Kil but also Delaware and Mt.Brydges. As it stands right now, Kilworth, in the older part of the village, kids still go to Westmount. Such a school would bring a needed would greatly reduce the overcrowding at SDCI.
Reply With Quote
     
     
  #2945  
Old Posted Apr 17, 2021, 11:46 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
TVDSB HS enrolment numbers - https://www.tvdsb.ca/en/our-board/resour...2020/SecondaryEnrolment_Web_20201031.pdf


Generally school boards were seeing declining enrolments across most boards for years. They may have stabilized in the few last years. Those trends may have bottomed out with recent surges of immigration.
Reply With Quote
     
     
  #2946  
Old Posted Apr 25, 2021, 6:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oak and CF have now poured some of the 4th floor walls on their Mosiak building on Sugarcreek. Will likely have the 5th and final floor slab poured by end of May.
Reply With Quote
     
     
  #2947  
Old Posted May 14, 2021, 3:26 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oaks has now got some of the 5th floor walls poured on their Mosiak building. Should be finishing the 5th floor roof by end of month. Mechanical penthouse in the first weeks of June and this is topped out.
Reply With Quote
     
     
  #2948  
Old Posted Jun 4, 2021, 8:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oaks have finished the 5th floor wall pours. Today they were pouring the 5th floor roof on the west end of their Mosiak building on Sugarcreek. Should have the rest of roof poured by end of next week and forming up for mechanical penthouse. The previous Mosiak building already appears to have some tenants living there as the landscaping is now going in.
Reply With Quote
     
     
  #2949  
Old Posted Jun 15, 2021, 1:21 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oaks is finishing the 5th floor roof slab pour today on their last Mosiak building on Sugarcreek. Mechanical penthouse is left and this is topped out.
Reply With Quote
     
     
  #2950  
Old Posted Jun 30, 2021, 7:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oaks Mosiak final building is now topped out with mechanical penthouse structure now up.
Reply With Quote
     
     
  #2951  
Old Posted Jul 6, 2021, 11:41 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Still need to complete the ground level steel rebar and concrete pour on the underground parking on the south side of building. The tower crane base hole has to be completed once it is removed as well. This will complete the concrete work on the Mosiak building.
Reply With Quote
     
     
  #2952  
Old Posted Jul 9, 2021, 7:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oaks poured the west side of the ground floor slab over the parking level at their Mosiak building today. Still need to finish up with the tower crane to remove it to finish the portion of the parking garage where it stands. Good progress on the window and balcony door installations as well.
Reply With Quote
     
     
  #2953  
Old Posted Jul 16, 2021, 12:08 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,243
Couple of small commercial properties getting underway. The hole is being dug for the Starbucks at Hamilton and Highbury. Also one of the foundations has been put in at the southwest corner of Colonel Talbot and Pack Rd where a Petro Canada gas station, car wash and A&W is going in.
Reply With Quote
     
     
  #2954  
Old Posted Jul 16, 2021, 12:39 AM
K85's Avatar
K85 K85 is offline
Sanity merchant
 
Join Date: Dec 2010
Posts: 550
sorry to ask, where can I find this info?

Quote:
Originally Posted by Djeffery View Post
Couple of small commercial properties getting underway. The hole is being dug for the Starbucks at Hamilton and Highbury. Also one of the foundations has been put in at the southwest corner of Colonel Talbot and Pack Rd where a Petro Canada gas station, car wash and A&W is going in.
Reply With Quote
     
     
  #2955  
Old Posted Jul 20, 2021, 11:05 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Old Oak has taken down the tower crane at their Mosiak building on Sugarcreek. Mobile crane now being used to finish the parking garage L1 level where the tower crane used to be. Good progress on the window and balcony door installations.
Reply With Quote
     
     
  #2956  
Old Posted Jul 20, 2021, 10:49 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,243
Quote:
Originally Posted by K85 View Post
sorry to ask, where can I find this info?
The Petro Canada and A&W has a sign up on Colonel Talbot. The Hamilton and Highbury Starbucks was in a link from the city planning site someone posted here some time back.
Reply With Quote
     
     
  #2957  
Old Posted Jul 24, 2021, 1:50 PM
Ryeguy01 Ryeguy01 is offline
Registered User
 
Join Date: Apr 2021
Posts: 30
The frame is all up for the trucking building at 1 durrow street, we have a couple little things to do but by next week some time we should be starting the steel cladding on walls.
Reply With Quote
     
     
  #2958  
Old Posted Jul 27, 2021, 1:21 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Nimbyism runs rampant at Planning Committee yesterday. At least the committee voted to move these proposals ahead to future council meeting.





https://lfpress.com/news/local-news/nimb...of-high-density-london-housing-proposals
Reply With Quote
     
     
  #2959  
Old Posted Jul 27, 2021, 1:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,101
Foundation walls have now been poured for the Petro Canada A&W project.



Quote:
Originally Posted by Djeffery View Post
The Petro Canada and A&W has a sign up on Colonel Talbot. The Hamilton and Highbury Starbucks was in a link from the city planning site someone posted here some time back.
Reply With Quote
     
     
  #2960  
Old Posted Jul 27, 2021, 2:15 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,179
Quote:
Originally Posted by jammer139 View Post
Nimbyism runs rampant at Planning Committee yesterday. At least the committee voted to move these proposals ahead to future council meeting.



https://lfpress.com/news/local-news/nimb...of-high-density-london-housing-proposals
Wow most of those arguments are pretty terrible, if you are going to show up to a planning meeting to oppose a development at least take the time to research the matter and prepare a valid argument.

The development at Commissioners/Viscount will "endanger our property and our lives" wow that is dramatic. The commercial businesses and multiple apartments directly across the street are okay though?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 8:01 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.