I listened to Erik Gingles (ex mayoral candidate for Moncton) on CBC Radio this morning, acting as a spokesperson for the
Friends of Centennial Park, opposing this plan for the Franklin Yards, which bounds the northern edge of the park.
It's not difficult to see why this group is in opposition to this particular plan. There is indeed a lot to dislike about this plan (mostly related to aesthetics), but Erik had some unusual suggestions (nothing more than three floors, near complete abolishment of on site parking, building a Codiac Transpo hub, inclusion of "bodegas" etc.). Bodegas BTW are ethnic Puerto Rican convenience stores associated with New York City.
Looking at the Friends of Centennial Park Facebook page, it would appear that their first option would be for the city to purchase the Franklin Yards and to annex it to the park. Gingles suggestions may be designed to make the development unprofitable enough that the developer will choose not to proceed.
The PACS meeting, and subsequent city council meeting should be quite interesting. I could see a lot of opposition.
The current plan certainly needs a lot of tweaking. It is too bland, uniform, uninspired, and has way too much surface parking. Instead of having 9 six storey generic apartment buildings, perhaps there should be a couple of 9-10 storey buildings, and a number of smaller four storey buildings, and include architectural diversity, rather than a suburban monoculture of identical buildings. This does nothing more than create a ghetto-like effect.
The development should be integrated into the adjacent park (the park is a resource that should be utilized as a major feature of this development), and, as I previously mentioned, there should be a well lit and maintained path leading to Centennial Place to allow students to walk or bike to school. Neighbourhood commercial should be a definite consideration, especially given that there may be as many as 1000 units in this development.
A high density development in this location could be a tremendous idea. It just needs to be carefully planned. I get the impression that the current iteration was slapped together. Moncton can do better.........