Will the existing retail plaza be demolished or reconfigured into this project?
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #2  
Old Posted Jul 18, 2021, 6:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
I think the current plaza is gone when the second phase is built. Only thing staying is the house on the corner.



Quote:
Originally Posted by MolsonExport View Post
Will the existing retail plaza be demolished or reconfigured into this project?
Reply With Quote
     
     
  #3  
Old Posted Aug 11, 2021, 12:34 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
Still no sign of a tower crane. Progress on footings and foundation is very slow.
Reply With Quote
     
     
  #4  
Old Posted Sep 14, 2021, 4:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
Now forming for the ground floor slab in the south end of pit. L1 walls and posts still being formed in the north end of pit. Still no signs of a tower crane although they have brought in a second mobile crane.
Reply With Quote
     
     
  #5  
Old Posted Oct 6, 2021, 7:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
Still working on ground floor slab forming. L1 level walls and posts continuing at north end of pit. Still no signs of a tower crane being setup. At this stage most contractors would have been using a tower crane by now rather then a mobile crane.
Reply With Quote
     
     
  #6  
Old Posted Oct 17, 2021, 3:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
Have now got some of the ground floor slab installed on the south end of building. Still working on the L1 walls and posts on the north end.
Reply With Quote
     
     
  #7  
Old Posted Nov 10, 2021, 4:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,974
Concrete pump truck onsite today as they continue to work on the L1 level walls and posts on the west side. They appear to have got the east side up to ground level now. Could see the first ground floor walls and posts being formed soon.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:53 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.