Quote:
Originally Posted by DKaz
Oh interesting.
— though because say with a 30 minute charge for $9.90, an F150 with a 150kW charger can get 75 kW of power (13.2 cents per kW) while a Chevrolet Bolt with a 55 kW charger will only get 27.5 kW of power (36 cents per kW). Something for future EV owners to consider. The bigger the Level 3 charging capability, the cheaper the road trips.
|
Or something for today's politicians to sort out before adoption gets too widespread. By the kW is the only way most public chargers should be billing in my opinion.
For my Volt, it only accepts 3.3 kW and doesn't do L3 at all (because small battery with gas motor backup). The rate the city charges for a L2 charger is currently more expensive than gas (even at $1.70/L).
EVs also have some varying charge rates. The 150 kW rate on that F150 is the peak. As the battery fills up, it has to slow down the charge rate. This accommodates the heat which builds up in the battery, and the fact that as the battery fills up, there's less available places to put the electrons.
That 150 kW would therefore be the peak rate. The average charge rate would probably be a fair bit less because of the taper. Most people using L3 chargers generally only charge up to about 80% to limit the effect of the taper and the wear on the battery.