  #101  
Old Posted Jun 25, 2021, 3:55 PM
Riberview Riberview is offline
Registered User
 
Join Date: Nov 2020
Posts: 270
Quote:
Originally Posted by MonctonRad View Post
Incredibly, they seem to be making preparations to install the tower crane already!

The base of the tower crane has been moved next to an excavation pit that may have forms at the bottom. We might actually see the tower crane erected by sometime in July.



Lafford certainly had all his ducks in a row before seeking approval from PAC. The speed this project is proceeding with is certainly breathtaking.


There was a concrete truck there when I drove by on Wednesday.. presumably to pour the pad for the crane.
Reply With Quote
     
     
  #102  
Old Posted Jun 25, 2021, 3:58 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224
Quote:
Originally Posted by OUIR@random View Post
Returning to our topic, this triple tower project in Moncton is certainly the largest project of its kind in downtown Moncton's history.
Well, the largest since Assumption Place (office tower, Hotel Beausejour and (former) city hall all at the same time).
__________________
Go 'Cats Go
Reply With Quote
     
     
  #103  
Old Posted Jun 25, 2021, 5:27 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,954
Quote:
Originally Posted by MonctonRad View Post
Well, the largest since Assumption Place (office tower, Hotel Beausejour and (former) city hall all at the same time).
I think that one of the things that this development will do is spur more development in the surrounding area. When it's completed, you'll have 450 residential unites as well as several businesses with employees & clients. That's a lot of people on a once vacant parcel of land.
Reply With Quote
     
     
  #104  
Old Posted Jun 25, 2021, 6:26 PM
OUIR@random OUIR@random is offline
Registered User
 
Join Date: Dec 2011
Location: Nouveau-Brunswick
Posts: 787
Quote:
Originally Posted by MonctonRad View Post
Well, the largest since Assumption Place (office tower, Hotel Beausejour and (former) city hall all at the same time).
Indeed, I should've added in recent history.

Place Assomption is absolutely the largest project in Moncton's history.
The largest project in downtown Moncton was from a French-Acadian corporation. J'adore.
Well the centerpiece (main tower) at least, I'm unaware if the whole project was developed by l'Assomption or not? The old city hall section is ugly though.

Last edited by OUIR@random; Jun 26, 2021 at 2:25 AM.
Reply With Quote
     
     
  #105  
Old Posted Jun 25, 2021, 6:40 PM
Leroy321 Leroy321 is offline
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 596
The first crane piece is now in the ground
Reply With Quote
     
     
  #106  
Old Posted Jun 25, 2021, 8:05 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224
Quote:
Originally Posted by Leroy321 View Post
The first crane piece is now in the ground
I just drove by to have a look.

Incredible! At this rate they should be topping off the building by the end of August! (just kidding)..........

Tower crane #7 should be up and running in a few weeks.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #107  
Old Posted Jun 25, 2021, 8:30 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,758
Quote:
Originally Posted by MonctonRad View Post
I just drove by to have a look.

Incredible! At this rate they should be topping off the building by the end of August! (just kidding)..........

Tower crane #7 should be up and running in a few weeks.
This should be the tallest one yet unless they plan on increasing its height as they go.
__________________
We The People
Reply With Quote
     
     
  #108  
Old Posted Jul 4, 2021, 3:22 PM
theshark's Avatar
theshark theshark is offline
Registered User
 
Join Date: Jun 2007
Location: Northern N.-B.
Posts: 1,145
CCD Canada

TOWER 2, MONCTON

CCD Ref. Number : NB163326-21-06

Stage : 3-Planning or drawing

Published : June 17, 2021

Starting Date (estimated) : Not available

Size : Mid-sized ($19,600,000)

Work type : New construction

Sector : Private

Category : 4-Residential

Subcategories : 4B-Residential Development

Disciplines : ARCH, CIV, ELEC, EQUI, HVAC, MEC-B, STRUC, OTHER*

Location :

MONCTON (NB)
(Moncton - Richibucto)

Description :
NEW MIXED-USE RESIDENTIAL BUILDING -
Located in Moncton, 20 rue Record St., this project (Tower 2) estimated at $19 600 000 is in the planning stage. Works concern the construction of a mixed-use building, 14 storeys in height, with residential, retail and office space, and underground parking.

- Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS


https://www.ccdcanada.com/projects/?XID=3BD138EF-B9EC-4A15-A794-94093B33D90F
Reply With Quote
     
     
  #109  
Old Posted Jul 4, 2021, 5:04 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,954
The Junction and now 20 Record St. tower two on the CCD Canada site!!
Reply With Quote
     
     
  #110  
Old Posted Jul 5, 2021, 12:05 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224


Yet another indication of the seriousness of Lafford as far as 20 Record Street is concerned.

He is seeking contractors for phase two even as phase one is just starting to get off the ground. This probably means no delay between these two phases of construction.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #111  
Old Posted Jul 7, 2021, 7:05 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224
Heavy lift cranes are on site. It appears the tower crane is going up this week.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #112  
Old Posted Jul 8, 2021, 1:42 AM
Leroy321 Leroy321 is offline
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 596
Are they going to use the mobile crane to build a bigger crane to build the tower crane?
Reply With Quote
     
     
  #113  
Old Posted Jul 8, 2021, 2:43 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224
Quote:
Originally Posted by Leroy321 View Post
Are they going to use the mobile crane to build a bigger crane to build the tower crane?
The tower crane probably won't be at full height to begin with. It is possible to "jack up" a tower crane as construction progresses so that it is always "just tall enough" to do the job.

You see this all the time for tall skyscraper construction in larger cities.

Here's an example from YouTube:

Video Link
__________________
Go 'Cats Go

Last edited by MonctonRad; Jul 8, 2021 at 3:33 AM.
Reply With Quote
     
     
  #114  
Old Posted Jul 8, 2021, 3:40 PM
Leroy321 Leroy321 is offline
Registered User
 
Join Date: Jun 2021
Location: Moncton
Posts: 596
Crane going up
Reply With Quote
     
     
  #115  
Old Posted Jul 8, 2021, 3:57 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224


Tower crane #7 for Moncton - this is a definite record for the number of concurrent tower cranes in the city!
__________________
Go 'Cats Go
Reply With Quote
     
     
  #116  
Old Posted Jul 8, 2021, 4:23 PM
josh_cat_eyes's Avatar
josh_cat_eyes josh_cat_eyes is offline
Registered User
 
Join Date: May 2009
Location: Moncton NB
Posts: 2,758
Quote:
Originally Posted by MonctonRad View Post


Yet another indication of the seriousness of Lafford as far as 20 Record Street is concerned.

He is seeking contractors for phase two even as phase one is just starting to get off the ground. This probably means no delay between these two phases of construction.
I wonder if the 6-7 year plan was start of construction until the end of the 3rd tower with construction on the second tower starting immediately after it finishes on the first tower. This seems like a reasonable timeline.
Quote:
Originally Posted by MonctonRad View Post


Tower crane #7 for Moncton - this is a definite record for the number of concurrent tower cranes in the city!
If The Tides get a tower crane that will be #8! Amazing stuff happening in Moncton.
__________________
We The People
Reply With Quote
     
     
  #117  
Old Posted Jul 13, 2021, 3:01 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,954
Recently I was driving on Assomption Blvd. and going by the site. To me, that NB Power sub-station really stands out (in a bad way). It's so out of place in that location and I really hope they move it somewhere else.

I noticed on the property map that the parcel of land that it's on fully extends to the corner of Lutz & Assomption. If they ever decide to relocate the sub-station, it would open up a very nice piece of property with excellent development potential.
Reply With Quote
     
     
  #118  
Old Posted Jul 13, 2021, 4:01 PM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,224
Just saw a photo online of the tower crane going up today. It's going to be really tall from the get go, probably about 65-70 metres or so. If I get a chance, I'll try to snap a photo on my way home from work.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #119  
Old Posted Jul 13, 2021, 4:56 PM
Sunnybrae's Avatar
Sunnybrae Sunnybrae is offline
Registered User
 
Join Date: Jun 2010
Posts: 756
Drove by at noon and yup... it's a very tall crane. From Gunningsville bridge, it looked as tall as the Alliant tower although I know it isn't.
Reply With Quote
     
     
  #120  
Old Posted Jul 13, 2021, 7:16 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,954
Quote:
Originally Posted by Sunnybrae View Post
Drove by at noon and yup... it's a very tall crane. From Gunningsville bridge, it looked as tall as the Alliant tower although I know it isn't.
I wonder if there ever been a crane this tall in Moncton before.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 5:38 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.