Old Posted Aug 15, 2019, 4:15 AM
urbanview urbanview is offline
BANNED
 
Join Date: Jul 2019
Location: Kampala
Posts: 77
Interesting tower. I think this is the kind of thing Miami is lacking. Chintzy amusements to make tourists go "wow". It also gives Miami city itself an identity. Most outsiders don't think of downtown Miami because it's lacking iconic buildings.
     
     
  #262  
Old Posted Oct 19, 2019, 5:01 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 47,056
‘ICONIC’ FERRIS WHEEL IS NOW UNDER CONSTRUCTION AT BAYSIDE MARKETPLACE

Quote:
Construction is now underway on an observation wheel at Bayside Marketplace in downtown Miami.

Opening is scheduled before the Super Bowl in February 2020, and pieces of the wheel have been in storage in Miami for months now waiting to be installed.

Bayside representatives have previously said the wheel will be “iconic.”

The 176-foot tall wheel will be lit up with LEDs, but will be much shorter than the London Eye which is 443 feet.

It will also be much smaller than the proposed Skyrise tower next door, which is proposed to top off 1,049 feet above sea level (Skyrise site work has been underway for some time, but little progress is evident).

Skywheel will feature forty-two air-conditioned gondolas that seat eight passengers each, for a total of 336 passengers. Each gondola will be fully enclosed and climate controlled. The slow-moving observation wheel ride will last from 12 to 15 minutes. Tickets will be sold by app or kiosk.
Credit: NXT


The Skyrise site:




The Ferris wheel site:

     
     
  #263  
Old Posted Oct 19, 2019, 6:11 PM
Maldive's Avatar
Maldive Maldive is offline
Registered User
 
Join Date: Sep 2004
Posts: 4,760
Not sure Miami should enter it's Dubai phase with this iffy tower.

Stick with subtle, original designs to grow a great skyline.
     
     
  #264  
Old Posted Feb 20, 2020, 5:54 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 47,056

Credit: NXT
     
     
  #265  
Old Posted Feb 25, 2020, 8:32 PM
cozy cozy is offline
Registered User
 
Join Date: Sep 2018
Location: Chicago, IL
Posts: 434
standard ferris wheel. nice.
__________________
Make no little plans; they have no magic to stir men's blood and probably themselves will not be realized.
     
     
  #266  
Old Posted Feb 25, 2020, 10:37 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX
Posts: 12,859
What's up with SkyRise? The webcam has not been updated since September and no new info since 'groundbreaking'.
__________________
HAIF
     
     
  #267  
Old Posted Feb 26, 2020, 2:49 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 47,056
Skyrise is going to be assembled part by part. Pieces to come via barge (already fabricated) and essentially put together.
     
     
  #268  
Old Posted Jun 27, 2021, 3:18 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
Registered User
 
Join Date: Mar 2002
Location: Miami
Posts: 8,228
SkyRise Website Has Been Taken Down, With No Construction Permits Active

The SkyRise Miami website has been taken offline.
Visitors to the site have been greeted with an error message since at least last week.
There’s also no recent activity in construction permitting.
A construction permit that was applied for in early 2020 has been cancelled, city records show.
Although the construction permit was filed for, no plans had been filed by the end of 2020.
The permit is now listed as being cancelled by the city administration.
Two other permits for demolition and sea wall work at the SkyRise site remain in progress, but there hasn’t been any activity on them for years.

https://www.thenextmiami.com/skyrise...ermits-active/

Hopefully this will be the last news that we will hear from this God awful project!

__________________
Miami : 70 Skyscrapers over 500+ Ft.|150+ Meters | 10 Under Construction.
     
     
  #269  
Old Posted Jun 27, 2021, 7:51 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NY - Cali
Posts: 6,326
This and Tower Fifth are the only two US supertalls I'm okay with being cancelled / not happening.

Seems Miami has another supertall in the pipeline anyway.
     
     
  #270  
Old Posted Jun 28, 2021, 4:16 AM
Drcastro Drcastro is offline
Registered User
 
Join Date: Apr 2020
Location: SW Mpls
Posts: 422
Did the wheel get finished?
     
     
  #271  
Old Posted Jun 28, 2021, 5:17 AM
Hudson11's Avatar
Hudson11 Hudson11 is offline
Registered User
 
Join Date: Aug 2011
Posts: 2,072
Quote:
Originally Posted by Drcastro View Post
Did the wheel get finished?
yes

Video Link
__________________
click here too see hunser's list of the many supertall skyscrapers of New York City!
     
     
  #272  
Old Posted Jun 28, 2021, 3:19 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,991
Well, it was a good run. Done for now.


https://amp.miamiherald.com/news/bus...252314788.html

Adieu, SkyRise Miami. Developer cancels plans to build 1,000-foot observation tower


BY REBECCA SAN JUAN
JUNE 28, 2021


Quote:
SkyRise Miami, a 1,000-foot-tall vertical amusement park planned for downtown near Bayfront Park, survived a decade of legal challenges, political opposition and rising construction costs. But the pandemic finally felled the innovative and controversial project, said developer Jeffrey Berkowitz.

“We moved heaven and earth during almost 10 years of challenges, obstacles, and adversity,” Berkowitz wrote in a statement to the Herald. “Despite everything we have endured and overcome, it is clear that given the unprecedented challenges presented by Covid-19 to the tourism, hospitality, and entertainment industries, I have no alternative but to cease construction and to abandon our efforts to build this project.”
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Never Built & Visionary Projects > Cancelled Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 11:20 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.