  #2301  
Old Posted Jun 10, 2021, 5:42 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Truenorth00 View Post
These aren't just random government campuses filled with 9-5 paper pushers approving government grants. Given the nature of the work done in several of those facilities, I have real doubts they'd agree to turning over land for a highly trafficked transit line to be built right outside. Have you ever actually walked down Bathgate near the campuses? I am going to suggest they are going to be pushing to maintain a specific perimeter.
I went to La Cite for 8 years, so I'm quite familiar with the area.

If the time ever comes, that would have to be part of a conversation with the Feds. I'm pretty confident they would be fine with giving or selling a narrow 10 meter strip along Bathgate. That would still maintain a 100 meters buffer more or less with any buildings other than the CSEC parking garage. The existing high security fencing wouldn't even need to be moved.

The City could explore both options, Bathgate to Blair or continue down to Montreal station. Depending on potential ridership numbers and the Feds' willingness to provide that small strip of land, one option would win out over the other.
Reply With Quote
     
     
  #2302  
Old Posted Jun 10, 2021, 5:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Quote:
Originally Posted by Harrison View Post
How is Vancouver's Broadway subway construction going? Haven't heard anything about it in this thread for a while.
That's the latest from May 13th from what I've seen.

Quote:
Major construction now officially underway on $2.8-billion Broadway Subway

Kenneth Chan, Daily Hive







This is the complete scheduled timeline of the subway’s construction:
  • Spring 2021-early 2022: construction of traffic decking in station blocks on Broadway.
  • 2021-23: elevated guideway construction to connect with VCC-Clark Station.
  • Mid-2022: assembly and launch of the tunnel boring machines.
  • Summer 2022-mid 2023: tunnel boring machines arrive at stations on Broadway.
  • Summer 2023: tunnel-boring machines disassembled/removed near Arbutus Station.
  • 2023-24: construction of station structures and interiors.
  • 2024: removal of traffic decking and restoration of roads and streetscape.
  • 2024: installation of tracks.
  • 2025: testing of train operating system and grand opening.
https://dailyhive.com/vancouver/broadway-subway-skytrain-extension-construction-timeline
Reply With Quote
     
     
  #2303  
Old Posted Jun 10, 2021, 5:59 PM
scryer scryer is offline
 
Join Date: Feb 2014
Posts: 1,964
TBF, the Broadway subway is going to be quite a boring (no pun intended) project to watch only because most of it is actually below ground . It will honestly just look like a lot of — road work until they start shooting updates inside stations.

If they start on the Expo extension then that would be a project a little more visually exciting because it's all elevated and we can see the stations start to build up.
Reply With Quote
     
     
  #2304  
Old Posted Jun 10, 2021, 7:12 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
 
Join Date: Sep 2017
Posts: 8,683
Sometimes, boring is good though.
Reply With Quote
     
     
  #2305  
Old Posted Jun 10, 2021, 7:25 PM
scryer scryer is offline
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Dengler Avenue View Post
Sometimes, boring is good though.
Oh I absolutely agree in this case .
Reply With Quote
     
     
  #2306  
Old Posted Jun 13, 2021, 11:02 AM
biguc's Avatar
biguc biguc is offline
 
Join Date: Mar 2003
Posts: 11,905
Quote:
Originally Posted by Aylmer View Post
It's Census Mapper, the armchair planner's friend.
Thanks. The time I'm going to kill with this...
Reply With Quote
     
     
  #2307  
Old Posted Jun 13, 2021, 4:10 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
 
Join Date: Dec 2003
Posts: 69,158
Valley Line SE going up Connors Hill + new pedestrian bridge.

my own
Reply With Quote
     
     
  #2308  
Old Posted Jun 16, 2021, 1:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Snapshot updated on O-Train Fans.

Woodroffe/Richmond decking over cut-and-cover Byron tunnel, Confederation Line 1 and 3, June 11.



Snapshot updated on O-Train Fans.

Bayview Station, Confed Line 1 (and 3) and Trillium Line 2 transfer, west of downtown, June 12.








https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-bayview-station-june-12-2021

Corso Italia, new urban infill double tracked station on Trillium, June 12.




https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-corso-italia-station-june-12-2021

Walkley, new infill inner-urban single track station on Trillium, June 14.


https://otrain.railfans.ca/snapshot-upda...ichmond-rd-temporary-bridge-june-11-2021
Reply With Quote
     
     
  #2309  
Old Posted Jun 17, 2021, 10:00 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Stage 2 West progress, from Mayor Watson.

First two are Algonquin Station, the fifth and final underground station within the current expansion plans (pending STO/Feds' choice for the tramway integration in Ottawa). This will be the Line 1 terminus until the Stage 3 extension to Barrhaven. The tunnel will include storage tracks.

The third is the Parkway/Byron tunnel cut-and-cover tunnel, a three kilometer tunnel that will bridge the gap between Kitchi Sibi (formerly Dominion) and Lincoln Fields stations. It will include two new open-air stations.

EDIT: The fourth is Montreal Station.








https://twitter.com/JimWatsonOttawa/status/1405306136392253443

Last edited by J.OT13; Jun 17, 2021 at 8:37 PM.
Reply With Quote
     
     
  #2310  
Old Posted Jun 18, 2021, 1:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
New Orchard Station under what was a former streetcar line, later Byron Linear Park. The park will be restored once the tunnel is complete. The two stations in the park will be open air.


https://twitter.com/AllanHubley_23/status/1405706334759264267
Reply With Quote
     
     
  #2311  
Old Posted Jun 24, 2021, 6:54 AM
swimmer_spe swimmer_spe is offline
 
Join Date: Apr 2014
Posts: 10,743
https://toronto.ctvnews.ca/ontario-breaks-ground-on-scarborough-subway-extension-1.5482761

Scarborough Subway Extension begins construction.
"It will have stations at Lawrence Avenue and McCowan Road, Scarborough Centre and McCowan Road and Sheppard Avenue."
Reply With Quote
     
     
  #2312  
Old Posted Jun 25, 2021, 5:27 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Trillium Line, Gladstone and Bayview stations.




https://twitter.com/rail613/status/1407069961546354688


https://twitter.com/rail613

Confederation East extension.

Flyover from north of the 174 to median.



Montreal Road station.



Place d'Orleans station.

Reply With Quote
     
     
  #2313  
Old Posted Jul 4, 2021, 1:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
From O-Train Fans. As always, more images are available on the RailFans website.

Trillium Line Uplands Station, June 30. One of three stations on the airport link, it serves the EY Centre, Ottawa's trade show facility. The airport has recently put up adjacent land up for lease for additional development.






https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-uplands-station-june-30-2021

Trillium Carleton Station, July 1. The busiest station on the original O-Train at Ottawa's second largest university. Little improvements other than a widened tunnel under the tracks and a new tunnel for future use (to Carleton's underground pedestrian network). The steel and stone O-Train bridge is being rehabilitated and a cycling/pedestrian bridge will be built next to it.




https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-carleton-station-july-1-2021

Confederation East at Place d'Orleans, June 29. Currently the main bus station in Orleans, the current facilities will be mostly maintained, with the new rail station to be built in the median with entrances within the existing walkway, another on Champlain street and a third via a new fare-paid bridge. A fare gate entrance will also be added to the bus loop.








https://otrain.railfans.ca/snapshot-updates-2/snapshot-of-place-d-orleans-station-june-29-2021

Confederation West Pinecrest, June 30. A new box was built over the last year or so and slid into place over a few days to allow trains to go under Pinecrest Road. A trench will be built and the station on the lower, left.


2:40 PM · Jun 30, 2021·Twitter Web App[/QUOTE]
Reply With Quote
     
     
  #2314  
Old Posted Jul 10, 2021, 1:12 AM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
 
Join Date: Aug 2015
Posts: 5,985
Eginton Streetcar/LRT )Crosstown)

The old bus bay site at the main interchange station continues to be a hive of activity:
Cloudy Day by the Corner by Draulerin Photographics, on Flickr
The main intersection for this project also remains...a mess and very busy with construction work:
Cloudy Day by the Corner by Draulerin Photographics, on Flickr
Reply With Quote
     
     
  #2315  
Old Posted Jul 10, 2021, 1:42 AM
Dr Awesomesauce's Avatar
Dr Awesomesauce Dr Awesomesauce is offline
 
Join Date: Jan 2010
Posts: 5,889
Wow - a very — situation in Ottawa! Don't think I've ever said that before...
Reply With Quote
     
     
  #2316  
Old Posted Jul 12, 2021, 3:48 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Video updates on Stage 2 Ottawa.

Trillium Line Stadler FLIRT production in Switzerland.

• Video Link


174 overpass at Montreal Road elevated station/guideway girder installation.

• Video Link
Reply With Quote
     
     
  #2317  
Old Posted Jul 12, 2021, 5:10 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
 
Join Date: Aug 2015
Posts: 5,985
I took these on Saturday by the NE corner of Don Mills and Eglinton, where Don Mills station is to be. They have a glass wall of a station entrance on the norh east corner..it's pretty ugly. The buildign pictured below is...better looking. These are taken looking west, then south:
West....on the left is one of the new station entrances for this station:
Crosstown Work by Draulerin Photographics, on Flickr
South(SW), the twin buildings in the distance are the tallest in this area, and the foreground is proposed to have tall residential buildings built by the corner of this intersection:
Crosstown Work by Draulerin Photographics, on Flickr
Looking east toward the highway...temporary pedestrian walkway replacing the former sidewalk
Crosstown Work by Draulerin Photographics, on Flickr
I took this last night...this may be a station entrnce, or an emergency exit....for Mt. Pleasant station. It's clad in steel and ceramic bricks, but I guess they'll put some concrete cladding on this over it.
Crosstown Work by Draulerin Photographics, on Flickr
Reply With Quote
     
     
  #2318  
Old Posted Jul 14, 2021, 12:40 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Images from the City of Ottawa's 90-day lookahead newsletter: https://mailchi.mp/c0bb0af6a582/west-extension-public-notice?e=f37f60b514

First two images are of the cut-and-cover tunnel along the Byron Tramway Park, between Richmond Road (right) and Byron Avenue (left). Cleary looking west and Woodroffe looking west. Two open-air stations will be located along this tunnel, adding new rapid transit service to the area.





Lincoln Fields Station, coming out of the Parkway-Byron tunnel. This will be the last station before Lines 1 and 3 split and will feature three tracks, two platforms, washrooms and retail. Riders will be able to transfer between Lines 1 and 3 by crossing the centre platform anytime before midnight.

Reply With Quote
     
     
  #2319  
Old Posted Jul 16, 2021, 1:30 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
 
Join Date: Dec 2003
Posts: 69,158
Edmonton's newest river valley stop 'Muttart' that will provide access to the Muttart Conservatory, Edmonton Queen Riverboat, trailhead for Millcreek, access to the Edmonton Ski Club and will be very helpful for major events like Folk Fest as it is a short walk away.




Platinum107 on SRC
https://edmonton.skyrisecities.com/forum...-of-edmonton.24534/page-125#post-1713445

New Tawatina Bridge


Airboy on SRC
https://edmonton.skyrisecities.com/forum...-of-edmonton.24534/page-125#post-1713445

Bonnie Doon Mall and future TOD

MCXavierL on SRC
https://edmonton.skyrisecities.com/forum...-of-edmonton.24534/page-125#post-1713445


Further south update of Davies Station/park and ride

Kurayba on SRC
https://edmonton.skyrisecities.com/forum...-of-edmonton.24534/page-125#post-1713445
Reply With Quote
     
     
  #2320  
Old Posted Jul 16, 2021, 6:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,160
Edmonton Valley Line is looking great. Should be on track for the end of 2021 opening.

Sorry for flooding this thread with Ottawa, but there's just so much going on.

Progress at Montreal Station. Girders have nearly all been installed to accommodate two more traffic lanes, two sets of tracks and the centre platform.


https://twitter.com/JimWatsonOttawa/status/1416028638647136263



https://twitter.com/TimTierney/status/1416051358063599617
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:41 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.