Posted Jun 9, 2021, 4:29 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,298
|
|
Able to glimpse south side of pit where they are now forming the L1 floor slab. Would imagine that they have now poured and formed most of the L2 level walls and posts. For such a small footprint progress is very slow.
|