HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Feb 22, 2021, 8:18 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Likely all of that is still needed. The nursing program is a 3 institution, 4 campus program split between the University of Ottawa, Algonquin at both Woodroffe and Pembroke, and La Cite.

It's also offered in both English and French with Algonquin doing English, La Cite doing French, and the University doing both.

U of O is the issuer of all BscN degrees regardless of what campus student pick.
Reply With Quote
     
     
  #22  
Old Posted Feb 22, 2021, 9:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
I'll repost the image on this page for reference.


https://twitter.com/MathieuFleury/status/1363902539595476995
Reply With Quote
     
     
  #23  
Old Posted Feb 22, 2021, 10:16 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Quote:
Originally Posted by c_speed3108 View Post
Likely all of that is still needed. The nursing program is a 3 institution, 4 campus program split between the University of Ottawa, Algonquin at both Woodroffe and Pembroke, and La Cite.

It's also offered in both English and French with Algonquin doing English, La Cite doing French, and the University doing both.

U of O is the issuer of all BscN degrees regardless of what campus student pick.
Nursing is only one of five departments of The Faculty of Health Sciences and they all will be consolidated at Lees. For the Fall of 2020 total faculty enrollment was 4095 undergrads and 795 graduate students. The School of Nursing had 1570 graduate and undergraduate students combined.

The other four departments are :
School of Interdisciplinary Health Sciences
School of Human Kinetics
School of Nutrition Sciences
School of Rehabilitative Sciences
Reply With Quote
     
     
  #24  
Old Posted Feb 22, 2021, 10:44 PM
GeoNerd GeoNerd is offline
Registered User
 
Join Date: May 2010
Location: Ottawa, ON.
Posts: 552
Looks good. If I were to have one complaint it would seem like a lost opportunity for a bit of height and residential (residence) along the river to be incorporated into the design. It would be nice to see the Lees campus used 24/7 instead of just during business hours. Some height would also open up some area for usable campus green space.
Reply With Quote
     
     
  #25  
Old Posted Feb 22, 2021, 10:54 PM
vtecyo vtecyo is offline
Registered User
 
Join Date: Feb 2015
Posts: 328
Quote:
Originally Posted by Richard Eade View Post
I didn’t realize that the new building was slated to house the Health Sciences. WWAAAYYYY back, when the City was asked to sell ($1, I think) the land west of Woodroffe to Algonquin College, the College’s plan was to have a new construction trades building between Woodroffe and the future LRT station, and two, new, Health Science buildings on the west side of the LRT tracks, where the ‘Temporary’ Baseline Transitway Stations sits today.

My guess is that Algonquin College has decided that they are no longer going to wait for the City to vacate the Transitway station’s land. Understandable, in that their health science education facilities have been lagging and now there is an even greater demand. In hindsight, the College should have done this years ago. Having the Health Sciences facilities closer to the University of Ottawa (for collaborative studies) and The Ottawa Hospital – General Campus is, likely, a better idea than putting those facilities in the west-end.

Algonquin College closed the Lees avenue campus in 2002 - and sold it all to UO in 2007, so I think this new building is entirely a UO project.

I believe some kind of Algonquin College health dept building is planned to go ahead eventually.

There's a campus master plan document that shows some concepts for buildings west of Baseline station - page 16: https://www.algonquincollege.com/imagine2030/files/2014/10/5YR-plan-2015-05-28_r1_lowres.pdf
Reply With Quote
     
     
  #26  
Old Posted Feb 22, 2021, 11:45 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,636
Doh. For some reason, I kept thinking of this as an Algonquin College ampus. You are absolutely right, it is now owned by uOttawa. Good on uOttawa for augmenting their Health Science facilities, then.

And thank you for the correction, vtecyo.
Reply With Quote
     
     
  #27  
Old Posted Feb 23, 2021, 3:53 AM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Quote:
Originally Posted by Richard Eade View Post
Doh. For some reason, I kept thinking of this as an Algonquin College ampus. You are absolutely right, it is now owned by uOttawa. Good on uOttawa for augmenting their Health Science facilities, then.

And thank you for the correction, vtecyo.

It is part of a three prong effort in Health Sciences and Medicine. Soon, uOttawa will start to build a new 250,000 square foot Medical Research Building near the Hospital Campus in Alta Vista. It is a partnership among uOttawa,The Ottawa Hospital,The Federal Gov't, and private enterprises that do research in health and medicine. The third prong is modernization of the Faculty Of Medicine building which is also in Alta Vista. A big investment in Health Science and Medical teaching and research in Ottawa. uOttawa has floated a $300 million dollars debenture ***for these projects(the debenture is all sold). The rest to come from govenment, grants , and private sources.

*** issued in Feb. 2020 at 2.635% interest.
Reply With Quote
     
     
  #28  
Old Posted Feb 25, 2021, 10:26 AM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Quote:
Originally Posted by GeoNerd View Post
Looks good. If I were to have one complaint it would seem like a lost opportunity for a bit of height and residential (residence) along the river to be incorporated into the design. It would be nice to see the Lees campus used 24/7 instead of just during business hours. Some height would also open up some area for usable campus green space.
The university says that this type of building is not suitable for a tower above it because it will house sensitive science equipment for research and teaching purposes. The extra traffic that a high rise residence would bring is not good for the equipment.

However , this is only phase one of the redevelopment of the Lees site.There could be a phase 2 and a phase 3 , although years away. Towers could appear then. The footprint currently occupied by Block E would seem to be a suitable choice for a tower or two.

The completion date was originally Sept 2022. Now it is summer 2023.
Reply With Quote
     
     
  #29  
Old Posted May 31, 2021, 4:42 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
It looks like the start of this project is way behind schedule as nothing much has been done yet.

Here is a 30 page slide show from the public consultation about this development.


https://ash-acs.ca/wp-content/uploads/20...tion_20210224_DRAFT-FOR-REVIEW_small.pdf

Last edited by LeadingEdgeBoomer; Jun 2, 2021 at 12:17 PM.
Reply With Quote
     
     
  #30  
Old Posted May 31, 2021, 4:53 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Thanks for posting the PDF. Good info.

It's called the "River Campus" now, no longer "Lees Campus".

Unless I missed something, there's nothing to improve access to Lees Station. I thought they had mentioned some sort of pedestrian bridge earlier. Lots of road to cross for students.
Reply With Quote
     
     
  #31  
Old Posted May 31, 2021, 7:34 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Quote:
Originally Posted by J.OT13 View Post
Thanks for posting the PDF. Good info.

It's called the "River Campus" now, no longer "Lees Campus".

Unless I missed something, there's nothing to improve access to Lees Station. I thought they had mentioned some sort of pedestrian bridge earlier. Lots of road to cross for students.
It was always the River Campus in the Campus Master Plan, but in every day speech most peeps call it the Lees Campus. Lees Campus seems to be the people's choice!

A couple of years ago it was announced that a lot of money would be spent to retrofit all five of the old buildings. There was a new link to the LRT stn. in the plan.
Now the plan has changed to demolishing three of the old buildings, building a new large building, retrofitting the other two and there is no mention of a new link to the LRT stn.
Reply With Quote
     
     
  #32  
Old Posted May 31, 2021, 8:53 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
I guess I never noticed it was referred as "River Campus" before. I must have assumed it was always Lees.

Adding a pedestrian bridge isn't absolutely necessary, but I hope to see some effort in giving pedestrians and cyclists more priority in the entrance area.
Reply With Quote
     
     
  #33  
Old Posted Jun 4, 2021, 1:14 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Another addition to to uOttawa's health sciences and medicine programs. In 2023 they will start a French language School of Pharmaceutical Sciences to produce pharmacists. It will be the first one outside of Quebec. Across Canada there are ten pharmacy schools, including two French language ones in Quebec.

The new uOttawa pharmacy program will be located in the redesigned Roger Guindon Hall and the future advanced medical research centre (which will be a new 200,000 square foot facility at the Alta Vista Campus).

Last edited by LeadingEdgeBoomer; Jun 4, 2021 at 1:43 PM.
Reply With Quote
     
     
  #34  
Old Posted Jun 4, 2021, 1:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Quote:
Originally Posted by LeadingEdgeBoomer View Post
Another addition to to uOttawa's health sciences and medicine programs. In 2023 they will start a French language school to produce pharmacists. It will be the first one outside of Quebec. Across Canada there are ten pharmacy schools, including two French language ones in Quebec.

The new uOttawa pharmacy program will be located in the redesigned Roger Guindon Hall and the future advanced medical research centre (which will be a new 200,000 square foot facility at the Alta Vista Campus).
Great to hear! Hard to believe this wasn't established years ago.
Reply With Quote
     
     
  #35  
Old Posted Jun 4, 2021, 2:12 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Quote:
Originally Posted by J.OT13 View Post
Great to hear! Hard to believe this wasn't established years ago.
Twenty -five years ago , I was working in the pharmaceutical industry and there was a push from Francophone pharmacists to get this School established. They thought that through lobbying they had gained support and some funding from the province. At the eleventh hour the province axed the idea and it has lain dormant until now.
Reply With Quote
     
     
  #36  
Old Posted Jun 4, 2021, 2:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Quote:
Originally Posted by LeadingEdgeBoomer View Post
Twenty -five years ago , I was working in the pharmaceutical industry and there was a push from Francophone pharmacists to get this School established. They thought that through lobbying they had gained support and some funding from the province. At the eleventh hour the province axed the idea and it has lain dormant until now.
Harris?
Reply With Quote
     
     
  #37  
Old Posted Jul 20, 2021, 8:46 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
Finally they will start construction.

[QUOTE]
Quote:
The University of Ottawa is undertaking the transformation of Lees Campus to train the next generation of health professionals. This new campus along the banks of the Rideau River will become home for the Faculty of Health Sciences schools of nursing, nutrition sciences, and rehabilitation sciences, and it will also accommodate professors, researchers, personnel from all five schools of the Faculty.



PCL Construction was awarded the contract to build the new campus based on a proposed design that is responsive to the needs of the Faculty of Health Science, offers practical and flexible solutions that will foster a sense of community, highlights uOttawa’s commitment to Indigenous peoples, and creates an ideal setting for cross-sector initiatives.



PCL will be starting mobilization on site — please see the attachment. Blocks A and E will be accessible at all times and the Main Entrance will be the entrance of Block E by the parking lot.



The following activities will be happening on site in the following weeks:



Week of July 19th - Relocation of the universal parking space from G1 and G2 to G3, north of Building E (as shown on the mobilization plan);
Week of July 19th - Relocation of the Protection Office in Block A;
Week of July 26th - Set-up fencing, signage, and site trailers;
Week of July 26th - When the fence is installed, G1 and G2 parking lots will no longer be accessible. G3 will be designated for permit holders and G4 for daily passes.
Week of August 2nd - Selective demolition inside the buildings (blocks B, C and D)


If you have any questions or comments, please contact us by email at [email protected].

Thank you for your collaboration and your support on this project.


Équipe des projets d’envergure | Major Projects Team
Immeubles | Facilities

Université d'Ottawa | University of Ottawa

[email protected]
Reply With Quote
     
     
  #38  
Old Posted Jul 23, 2021, 3:44 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355
It looks like there are some changes in the renderings for this building. Sorry that the images came out so large.


Last edited by rocketphish; Jul 23, 2021 at 4:31 PM. Reason: Resized the humongous image
Reply With Quote
     
     
  #39  
Old Posted Jul 23, 2021, 3:46 PM
LeadingEdgeBoomer LeadingEdgeBoomer is online now
Registered User
 
Join Date: Mar 2010
Posts: 1,355

Last edited by rocketphish; Jul 23, 2021 at 4:32 PM. Reason: Resized the humongous image
Reply With Quote
     
     
  #40  
Old Posted Jul 23, 2021, 5:38 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Boy that got value engineered!

The fire pit is an interesting addition.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:06 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.