  #861  
Old Posted May 1, 2021, 4:20 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
April 30 '21, my pics






Reply With Quote
     
     
  #862  
Old Posted May 1, 2021, 5:06 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,680
By me today:

Reply With Quote
     
     
  #863  
Old Posted May 8, 2021, 2:20 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,680
Pics by me today:



Reply With Quote
     
     
  #864  
Old Posted May 9, 2021, 4:52 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
May 8 '21, my pics














Reply With Quote
     
     
  #865  
Old Posted May 9, 2021, 4:53 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
May 8 '21, my pics












Reply With Quote
     
     
  #866  
Old Posted May 12, 2021, 3:32 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
Thanks for the great photo update, McMinsen. What an improvement the facade restoration and cleaning makes. I'm excited to see this in person the next time I'm back in Vancouver, in the post-COVID after times.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #867  
Old Posted May 12, 2021, 8:16 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,736
I still have a really hard time looking at the juxtaposition of the new glass towers and the podium base. I know this would alter the historical appearance, but would it be better if the reddish brown portions are repainted with shades of perhaps a royal green colour? That seems to match the glass colour much better. Just a thought.


Quote:
Originally Posted by VantageHD View Post
That glass is just great!
I think if the glass colour were copperish like that of the Parq Casino & Marriott hotels, it would match the podium much much better.
Reply With Quote
     
     
  #868  
Old Posted May 18, 2021, 5:01 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,683
Quote:
South Tower structural steel penthouse will be complete
Roof top mechanical equipment will be hoisted in to place
Level 17 floor slab on the East side of the North Tower will be complete
Level 17 floor slab on the West side of the North Tower will be formed
Curtain wall glass installation will be complete on Level 19 of the South Tower
Curtain wall glass installation will be ongoing on Level 9 of the North Tower
Curtain wall glass installation will be ongoing on the Atrium between the two towers
Block wall installation will continue on floors up to the top of the South Tower
Drywall partitions will continue on floors up to Level 20
Fireproofing of the existing steel will continue on Level 10
Misc. concrete demolition will continue throughout building
Exterior wall framing and glass installation will continue along Homer Street
Exterior column granite installation will continue along Dunsmuir Street
Façade restoration on the West Georgia Street elevation is complete. Scaffold protection will be dismantled
Façade restoration is underway along Homer Street for the next 12 months
Landscaping will continue along West Georgia Street
Painting will continue from Level P1 to Level 8
Flooring installation has commenced on Level 5
The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 8:00 pm (Monday – Saturday)
The Homer Street curb lane will be closed for the duration of the project
Noise exemption permits will be applied for all weekends and concrete pour days until further notice
https://www.thepostnews.ca/
Reply With Quote
     
     
  #869  
Old Posted May 22, 2021, 2:06 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,680
Pic by me May 20:

Reply With Quote
     
     
  #870  
Old Posted May 26, 2021, 4:40 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
May 25 '21, my pic
Reply With Quote
     
     
  #871  
Old Posted May 31, 2021, 6:29 PM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
May 30 '21, my pics














Reply With Quote
     
     
  #872  
Old Posted May 31, 2021, 6:38 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,683
May 28, 2021
For the next two weeks:​
Roof top mechanical equipment will be hoisted in to place on the South Tower
Level 18 floor slab on the East side of the North Tower will be complete
Level 18 floor slab on the West side of the North Tower will be formed
Curtain wall glass installation will continue on Level 10 of the North Tower
Curtain wall glass installation will continue on the Atrium between the two towers
Block wall will continue on various floors throughout the South and North Tower
Drywall will continue on floors up to Level 20
Fireproofing of the existing steel will continue on floors up to Level 10
Misc. concrete demolition will continue throughout building
Exterior wall framing and glass installation will continue along Homer Street
Exterior column granite installation will continue along Dunsmuir Street
Façade restoration will continue along Homer Street for the next 12 months
Landscaping will continue along W Georgia Street
Painting will continue on various floors up to Level 8
Flooring will continue up to Level 5
The Hamilton Street sidewalk adjacent to the building will be closed for the duration of the project.
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 8:00 pm (Monday – Saturday)
The Homer Street curb lane will be closed for the duration of the project.
Noise Exemption permits will be applied for all weekends and concrete pour days until further notice
Reply With Quote
     
     
  #873  
Old Posted May 31, 2021, 6:46 PM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
May 30 '21, my pics


















Reply With Quote
     
     
  #874  
Old Posted May 31, 2021, 10:31 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,680
That's a lot of venting on Hamilton!
Could be for above-grade parking?
Reply With Quote
     
     
  #875  
Old Posted May 31, 2021, 10:44 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,683
Quote:
Originally Posted by officedweller View Post
That's a lot of venting on Hamilton!
Could be for above-grade parking?
Between levels 3/4 there's a mechanical mezzanine:

https://ehq-production-canada.s3.ca-cent...ea7e7bb4cb933636b80bb63927ed017bcc90756f

I think the above grade parking ventilation is behind those vertical slots next to the fin signage? Though one of those also was labeled as a generator flue.
Reply With Quote
     
     
  #876  
Old Posted May 31, 2021, 10:48 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
I’m not understating what the horizontal white bands on the Georgia side are for.
Reply With Quote
     
     
  #877  
Old Posted May 31, 2021, 11:12 PM
rofina rofina is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,149
Its so fantastic that the facade of that post building was integrated into this development. Super cool.
Reply With Quote
     
     
  #878  
Old Posted Jun 1, 2021, 12:03 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,683
Quote:
Originally Posted by osirisboy View Post
I’m not understating what the horizontal white bands on the Georgia side are for.
I think solar shading?
Reply With Quote
     
     
  #879  
Old Posted Jun 1, 2021, 1:15 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Quote:
Originally Posted by osirisboy View Post
I’m not understating what the horizontal white bands on the Georgia side are for.



I'm guessing they will light up.




Quote:
Originally Posted by mcminsen View Post
Wellll... maybe that white spandrel stripe is going to be the way it is. Look at this rendering I found on Quadreal's website.

If they are going to be light strips then I sure hope they perform better than the ones on the Telus Garden condo tower.




source: https://www.quadreal.com/the-post-vancouver/
Reply With Quote
     
     
  #880  
Old Posted Jun 1, 2021, 1:39 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,683
They just call it metal spandrel on the elevation docs. It also shows that weird single gap in the solar shade panels.

https://ehq-production-canada.s3.ca-cent...8ec7493421893b975a0de730f16488f2f76fd26a
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 12:36 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.