Quote:
Originally Posted by bomberjet
They're separate things really. So I assume they just show it as future as the timeline for both projects could've been different.
Seeing as both buildings are going up at the same time, and the floor plan for 360 Tache shows where the skywalk connects to it, it would be built.
Would be stupid to come back later and carve out the brand new buildings to install the skywalk.
|
Or the walls can be structurally designed to have the skywalk go in thru bricked over openings at a later date if it gets deleted due to budget costs.
I think it is a lot easier to do it later if its roughed in than like downtown when all the skywalk attachments had to be hacked into place as none of the buildings had the same alignment on the 2nd floors or like the 266 Graham tower offices in the pathway that had to be moved out.