Quote:
Originally Posted by Dengler Avenue
The plan will always be there. (There's a pdf for that somewhere on the internet.) Whether or not it will be completed...  it may be more likely now now that A40 has been shut for days.
|
Would love for that to become a reality... As things are right now, the A40 across Ile Aux Tourtes is closed indefinitely for repairs... And the elevated section of A40 near A15 is set to be closed to be demolished, and replaced soon as well, which is going to create some fairly massive headaches for everyone in the area.
If the current closure of A40 is still in place by the Canada Day weekend, I'll most likely have to take the A15 down to A30 and come back up to A20 VIA Salaberry-de-Valleyfield, to avoid that entire hot mess, and get down to Ontario to visit family (that is, if restrictions are lifted by then).
Having this as a freeway link would be awesome, as right now, as it stands currently, the current at-grade intersections on A20 on Ile-Perrot are just a hot mess of traffic lights that cause a lot of headaches, and I, along with plenty of other Montrealers, tend to prefer the currently closed section of A40... The redundancy is much-needed, to say the least.