Quote:
Originally Posted by swimmer_spe
Your math is off. You need the per trip, so, 4,289/6 = 715
715x 67 = 47,893 with 400 trains.
|
Except that's not how you did it in your original post (you divided 400 by 6 to get the 67). I'm not going to stress over it though as if your corrected math is actually right, it makes my point even stronger.
Quote:
|
The Majority of he Corridor users are not likely land yacht riders. They may be people who are visiting one place or another for vacation, but the train is not the sole reason for traveling. A better comparison might be London or Kingston as they are similar cities and if rail was restored pre 1990s cuts, Saskatoon could see a train from Regina. Interesting thing, Toronto's population and ridership are about the same, so it might be possible that the number wouldn't be far off.
|
I agree that "The Majority of he Corridor users are not likely land yacht riders." That is my whole point. You can't assume that having 67 times as many trains out of Vancouver will result in 67 times as many yacht riders.
Quote:
Now, let's say Saskatoon had a daily from Edmonton, Regina and Winnipeg. That is 6 trains a day, 7 days a week. Or 42 trains a week.
715x42 = 30,030
Even a daily Canadian would double the amount to around 10,000.
|
But how much would those trains cost to operate and would the increased ridership come close to covering those costs?
Don't forget, trains can easily stop at stations along the way and not everyone travels from end to end. What makes the corridor work is the number of cities and large towns within a short distance of each other at which a large number of people can get on or off.
Quote:
|
I haven't ridden it yet, but I assume it takes most sidings and doesn't go as fast as the C-E would could do.
|
What makes you think that the rated speed of CP's mainline would be lower than that of a branch line?
Quote:
|
As far as downtown Edmonton, what about an underground line going through downtown to the existing Via station?
|
What existing tunnel could VIA use? Sure a tunnel could be dug at great expense, but I would count that as a significant upgrade. My point is that running trains on existing track without any significant upgrades would create an undesirable product.