  #15021  
Old Posted May 14, 2021, 5:31 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by Acajack View Post
I have to agree, though I do think that part of the more spacious feel of the Trillium line trains is due yes to the inside actually being larger, but also that very often it's filled below capacity.
The Trillium line trains are generally nicer owing to their commuter rail origins. The seats are larger and higher backed, there are armrests, the train is spacious and ad-free, and the grab stanchions are grey instead of high-viz yellow. Fewer doors also means your seat is likely further from the cold and people passing by at every stop. All of this combines to make the train feel higher quality than the Confederation line.
     
     
  #15022  
Old Posted May 15, 2021, 5:04 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
How much more is Ottawa's LRT costing taxpayers?
This week, it was revealed the Rideau Street sinkhole cost the city $130M. What else don’t we know?

Joanne Chianello · CBC News
Posted: May 15, 2021 4:00 AM ET | Last Updated: 9 hours ago


In just a few weeks, it will be the fifth anniversary of the massive Rideau Street sinkhole that opened up above where the Confederation Line tunnel was being built.

Most everyone in Ottawa will remember the shocking event in which, miraculously, no one was hurt, although a parked van and three lanes of traffic were swallowed whole.

And yet in all this time, we have never once heard that the sinkhole cost the city tens of millions of dollars — until this week.

The revelation that the city is suing its own insurance companies for more than $360 million due to costs it incurred due to the sinkhole was startling on many fronts, not least of which the fact that in the years since the sinkhole occurred, the city hasn't publicly said anything about the event having any long-term financial impact.

Then there's the news that the city's insurers rejected its claim for the costs in December.

And finally, the discovery that the consortium that built the Confederation Line, Rideau Transit Group (RTG), is blaming the city for the sinkhole.

It's a complicated and expensive mess, and it all raises a bigger question: How many more millions did the LRT cost Ottawa taxpayers that the city hasn't told us about?

First, let's dissect the lawsuit. News of it came through a confidential memo sent to council and first reported by the Ottawa Citizen, even though there's no good reason for information about the city filing a lawsuit in public court to be kept secret.

It's a convoluted document, but here's what we can say for sure based on the memo to councillors, several publicly available court documents and background conversations with people familiar with the issue.

As part of the Confederation Line construction, a project that has always been touted as costing $2.1 billion, RTG took out what's known as a builders' risk policy with a team of insurance companies led by Zurich Insurance.

The policy covers RTG, but also the city and others working on the project against losses that might occur should something go wrong. The policy has a $700-million payout cap for any single event — such as a massive sinkhole.

The insurance companies have paid out $45 million to RTG for sinkhole-related losses. But back in February 2019, RTG made an insurance claim of $235.7 million, arguing that the entire 15-month delay to complete the Confederation Line was due to sinkhole.

The insurers disagreed. They contend that non-sinkhole related problems with the Alstom trains and station construction meant that the LRT wouldn't have been finished any earlier.

They denied the entire claim, and RTG sued for $275 million. That court fight continues.

This week, we find out that the city believes the "sinkhole event" cost it $131 million including $104.2 million for so-called "carrying costs," $3.3 million for delayed opening expenses and $22.8 million to pay consultants and employees.

The city also made a claim for its costs to the insurers last August. Again, the insurance team denied the claim. This week, the city took its fight to court and will be asking that a judge deal with its suit at the same time as the RTG suit.

But wait, there's more!

Although the city is claiming losses of $131 million, the suit is for $361 million.

The rest of the claim — $230 million — has to do with who will ultimately be found responsible for the sinkhole.

In 2017, an engineering consultant's report commissioned by the city found it was "highly likely" that the sinkhole was caused by ground that was loosened during the LRT tunnel construction. But RTG has never agreed with that assessment, believing that the city is to blame — possibly due to poor construction in that area in the past that RTG could not have known about.

In fact, that exact scenario had occurred earlier in the project. A report found that a much smaller sinkhole on Waller Street in 2014, at the eastern end of the tunnel, was caused by a "previously excavated construction pit" filled with "poor quality, uncompacted" material — hence, not RTG's fault, although it picked up the costs at the time.

So to hedge its bets on getting compensated for its sinkhole-related losses, on top of suing the insurers, RTG has also made a claim against the city for $230 million under the LRT contract's dispute-resolution process, which is confidential.

The city, in turn, is including that $230 million in its own lawsuit against the insurance companies in case Ottawa is found responsible for causing the sinkhole.

Many troubling questions remain from this week's news.

After RTG handed the Confederation Line over to the city in August 2019, the city held back $59 million from its final payment. This money was supposed to cover the city's costs of the 15-month delay — everything from having to keep buses on the road, to driver overtime, to keeping the rail office open.

It was understood that RTG might dispute this holding back of payment, but never did the city suggest taxpayers could be on the hook for hundreds of millions more due to the LRT delay.

Why was the public not made aware of this possibility earlier? And how many more millions over $2.1 billion did the city actually shell out for the Confederation Line construction?

On a final note, taxpayers were told over and over that the public-private-partnership or P3 format of the LRT contract meant that the private partners — RTG — would be taking all the risks if something went awry.

It appears not to have worked out that way.

At Tuesday's finance and economic development committee meeting, councillors will get to ask questions about this lawsuit.

According to the agenda, that discussion will be behind closed doors, perhaps signalling some new surprises for taxpayers down the road.

https://www.cbc.ca/news/canada/ottawa/lrt-millions-costs-delay-1.6027530
     
     
  #15023  
Old Posted May 18, 2021, 9:22 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
Mayor, committee demand investigation into sinkhole leak
Finance committee asking integrity commissioner to probe leak of memo on $361M lawsuit

Joanne Chianello · CBC News
Posted: May 18, 2021 2:43 PM ET | Last Updated: 2 hours ago


A group of councillors led by Mayor Jim Watson wants council to investigate who leaked a confidential memo last week about the city's $361-million lawsuit over the Rideau Street sinkhole.

On Tuesday, the finance and economic development committee, chaired by Watson, unanimously approved without discussion a motion from Coun. Eli El-Chantiry asking that council "direct the Integrity Commissioner to undertake an investigation into the release of the above-noted confidential memo and provide a report on his findings as soon as possible."

"This is a very important issue and I'm hoping the integrity commissioner will use anything available in his power to get to the bottom of this, including using the police services if he has to," said El-Chantiry.

The confidential memo, signed by rail director Michael Morgan and external lawyer Sharon Vogel, was sent to council late Monday, May 10, informing them about the lawsuit. The statement of claim was filed in court the following day, meaning the lawsuit documents were then public.

The Ottawa Citizen first reported on the memo on the evening of May 11, followed by CBC Ottawa on the morning of the 12th. Later that day, the city released the statement of claim, but it's unclear if it would have done so if the lawsuit had not been reported in the media.

Councillors met behind closed doors for more than two hours on Tuesday morning to receive updates on the legal issues between the city, Confederation Line builders Rideau Transit Group and the insurers of the project. Updates on the second phase of the $4.7-billion light rail project were also held in camera.

Full council will have to give the investigation the green light at its meeting on May 26.

https://www.cbc.ca/news/canada/ottawa/fedco-investigate-leaked-lrt-lawsuit-memo-1.6030811

Last edited by rocketphish; May 18, 2021 at 9:57 PM.
     
     
  #15024  
Old Posted May 18, 2021, 9:56 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
City adds to pile of LRT litigation with notice of dispute

Jon Willing, Ottawa Citizen
Publishing date: May 18, 2021 • 20 minutes ago • 1 minute read


The legal fights related to the first phase of LRT are piling up.

Mayor Jim Watson announced to reporters on Tuesday that the city had filed a notice of dispute in court against the Rideau Transit Group, the builder of the $2.1 billion Confederation Line

The dispute, Watson said, is “in respect of the independent certifier’s decision that the city is responsible for any additional costs for ash wood and also it’s failure to address the city’s counterclaims against on the issues of the Alstom train design and sinkhole costs.”

City solicitor David White added a bit more context to the new litigation.

“The scope of the issues revolve around some nominal costs the city may be required with the respect to the substitution of Douglas fir in place of ash wood, but also the fact that the independent certifier did not address some parts of the city’s counterclaim,” White said.

This litigation speaking to the independent certifier’s assessment was not about the $230 million that RTG is claiming from the city related to the sinkhole, White said.

The $230 million — combined with about $131 million in alleged city costs related to the delayed launch of LRT — is included in a separate lawsuit the city launched last week against LRT insurers.

When it comes to the new litigation filed in court on Tuesday, the dispute over the wood used in LRT stations has been reported by this newspaper. City ash trees destroyed by the emerald ash borer were eyed for use on the LRT project, but the lumber became warped and discoloured, forcing RTG to use Douglas fir.

City officials didn’t expand on the allegations related to the Alstom Citadis Spirit design, though the city’s challenges with the LRT vehicles have been well documented ever since the launch of the rail system in September 2019.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...of-lrt-litigation-with-notice-of-dispute
     
     
  #15025  
Old Posted May 19, 2021, 2:20 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
City sues RTG for $131M over late Confederation Line
Independent certifier found city not at fault over delays, but wasn't entitled to huge cost compensations

Joanne Chianello · CBC News
Posted: May 18, 2021 4:33 PM ET | Last Updated: 1 hour ago


The City of Ottawa is suing the builders of the Confederation Line for $131 million, the second lawsuit it has launched in the past week related to the east-west LRT construction.

In a statement of claim filed in Ontario Superior Court on Tuesday, the city argues that Rideau Transit Group (RTG) failed to meet certain terms of the contract, including missing its two key completion dates of May 7, 2018, and May 24, 2018. Instead, the Confederation Line was handed over 15 months late, in August 2019.

Now the city claims it's out $131 million for "carrying costs, delayed opening expenses, consultant expenditures, wages and salaries of employees, financial costs and accounting expenses," even though an independent certifier disagreed.

It's just the latest revelation of how much more the construction of the light rail project could potentially cost the city than the original $2.1-billion price tag.

Last week, the city filed a $361-million suit against its own insurance companies in relation to the Rideau Street sinkhole in June 2016. That lawsuit includes the exact costs that the city is claiming in its suit against RTG and also revealed that RTG has a $230-million claim against the city.

"These kinds of suits and counter-suits — unfortunately whether you like it or not — are par for the course," Mayor Jim Watson told reporters Tuesday. "You get into multi-billion-dollar contracts and you're going to have disputes between contractors, subcontractors, the customer, ourselves and our taxpayers."

In August 2019, the city held back $59 million from its final payment to RTG, money that was supposed to cover the city's costs of the delay. That appears to have been a drop in the bucket.

That's also the case for the $1 million the city docked RTG for each of the four times it missed a contract deadline. According to the 12-page statement of claim, those payments were "intended to be a genuine pre-estimate of the costs associated with the preparation work that the city would undertake for the anticipated commencement of service" and "were not intended to compensate the City for costs it incurred as a result of the approximately 15-month delay."

According to the statement of claim, RTG launched eight disputes related to the LRT issues, including over the sinkhole and the design of the Alstom light rail vehicles. The document doesn't provide any explicit details about those two issues, but suggests the sinkhole and the train issues are the key reasons behind the city's $131 million claim.

Before all these disputes went to court, the two sides participated in a confidential resolution process laid out in the contract. That process included an independent certifier who agreed with the city on major questions, including that the city was not responsible for the sinkhole or RTG's delays due to the Alstom train issues.

However, the independent certifier seems not to have bought the argument that the 15-month delay cost the city $131 million.

"The Independent Certifier failed to address the City's counterclaim for costs incurred as a result of RTG's delay," says the statement of claim. "The city disputes the Independent Certifier's determination in this regard and seeks the damages described herein as a result of RTG's breach of contract."

On a smaller note — and a glimpse into how complex and detailed this contract battle is — there was also an issue over using wood from Ottawa ash trees in LRT station ceilings.

The city claims RTG was responsible for treating the local wood with fire retardant, but that the treatment process was performed improperly and ruined the wood. So the city agreed to let RTG use Douglas fir instead, but the two sides are arguing over who should pay for the wood.

In this instance, the independent certifier agreed with RTG, saying the city was responsible for the so-called "Ash Wood Direct Costs."

https://www.cbc.ca/news/canada/ottawa/city-sues-rtg-131m-late-lrt-1.6031507
     
     
  #15026  
Old Posted May 19, 2021, 12:53 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
This is gonna blow-up in our faces.

The City has already withheld $200+ million from RTG/RTM and are now suing due to delays? Rail projects come in late most of the time. 15-months is quite good compared to say, Eglington in Toronto.

If they sued because of trains that don't decouple evenings and weekends as per the contract, heating platforms that don't work, terrible workmanship, dirty ass stations, than yeah, sure.

I think the City is run by a moron in Steve K. propped-up by over-zealous internal and external lawyers who will make loads of money no matter what.
     
     
  #15027  
Old Posted May 19, 2021, 3:07 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by J.OT13 View Post
This is gonna blow-up in our faces.

The City has already withheld $200+ million from RTG/RTM and are now suing due to delays? Rail projects come in late most of the time. 15-months is quite good compared to say, Eglington in Toronto.

If they sued because of trains that don't decouple evenings and weekends as per the contract, heating platforms that don't work, terrible workmanship, dirty ass stations, than yeah, sure.

I think the City is run by a moron in Steve K. propped-up by over-zealous internal and external lawyers who will make loads of money no matter what.
I agree with you on this. I also think part of the problem is that the city comes up with unrealistic timelines to begin with. When companies are submitting bids they then have very little wiggle room to change the timelines if they want to win the contract. The City should also take more time in developing the requirements, such as allowable curvature on the line. They have failed miserably as there are several locations on the Confederation line where the result is higher maintenance costs for both the trackage and the rolling stock due to sharp corners.
     
     
  #15028  
Old Posted May 19, 2021, 4:51 PM
DarkArconio DarkArconio is offline
Registered User
 
Join Date: Mar 2010
Posts: 182
RTG agreed to take on the liability for delays when it signed the contract. I don't see why the city shouldn't make taxpayers whole to the full extent of the law. The point of these fixed deadline contracts to the incentivize private firms to manage costs and timelines. If we don't enforce the contracts when there are cost and timeline overruns, it defeats the whole purpose of having them in the contract in the first place. It's not just about stage 1, it's about setting clear expectations for the firms running stage 2. No excuses, these firms are getting millions of dollars. They need to deliver.
     
     
  #15029  
Old Posted May 19, 2021, 5:02 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
LRT system showing a 'stable' trend, rolling out more tap technology to pay for rides

Jon Willing, Ottawa Citizen
Publishing date: May 19, 2021 • 1 hour ago • 1 minute read


Here’s a word the public hasn’t heard when it comes to the $2.1-billion LRT system: stable.

Yes, the Confederation Line has been running with a severely decreased ridership — ridership in April was 19 per cent of pre-pandemic ridership levels — but OC Transpo has been recently tracking record levels of availability in the system’s short life.

That’s not to say the city has handed LRT a clean bill of health.

Maintenance workers still check train wheels each day and the Transportation Safety Board’s investigation into past wheel cracks continues. Vehicle auxiliary power units are still undergoing work and maintenance crews are still “fine-tuning” braking systems.

But nearly all scheduled train trips have been delivered in recent months.

Transpo considers it unacceptable to fall below 97 per cent of delivered scheduled service. The rate has either met or exceeded that level every month since August 2020. In April 2021 it was 99 per cent and that rate has continued into May.

“We’re trending in the right direction, we’re stable,” Troy Charter, Transpo’s director of operations, told the transit commission on Wednesday.

Transpo has rolled out new payment technology at all LRT stations.

All of the entrances have one fare gate that has technology that lets customers tap their credit card or mobile phones to pay for trip.

Transportation general manager John Manconi said the technology will expand to buses, with a goal of network coverage by the end of the year. Staff are also looking into allowing Interac card taps.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...out-more-tap-technology-to-pay-for-rides
     
     
  #15030  
Old Posted May 19, 2021, 5:25 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by GoTrans View Post
I agree with you on this. I also think part of the problem is that the city comes up with unrealistic timelines to begin with. When companies are submitting bids they then have very little wiggle room to change the timelines if they want to win the contract. The City should also take more time in developing the requirements, such as allowable curvature on the line. They have failed miserably as there are several locations on the Confederation line where the result is higher maintenance costs for both the trackage and the rolling stock due to sharp corners.
Maybe the companies need to stop bidding on unrealistic timelines with low balled amounts.
     
     
  #15031  
Old Posted May 19, 2021, 10:24 PM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by swimmer_spe View Post
Maybe the companies need to stop bidding on unrealistic timelines with low balled amounts.
with that attitude, nothing will ever get built.
     
     
  #15032  
Old Posted May 19, 2021, 10:29 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by OtrainUser View Post
with that attitude, nothing will ever get built.
Maybe what could happen is that the city finally learns that they need to do a better job of laying out the timeline and the contractors would finally learn to put a bid in that is closer to the real cost.
     
     
  #15033  
Old Posted May 22, 2021, 4:14 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
City of Ottawa's probe of LRT 'leak' is meant to distract and intimidate
The culture of municipal secrecy lives on. Our elected officials shouldn't be proud of it.

The Ottawa Citizen Editorial Board
Publishing date: May 22, 2021 • 4 hours ago • 3 minute read


Five years ago, during construction of the tunnel for the Confederation light-rail line, an enormous sinkhole abruptly opened up on Rideau Street. No one, fortunately, was injured. But the real cost to taxpayers of this urban disaster remained under wraps.

Until last week, when the Citizen’s Jon Willing obtained a memo to city council from an unnamed source that provided some stark numbers. To simplify: The memo explained that the city is suing its insurers for more than $360 million related to the crater, after the insurers rejected its claim last year. One reason that total is so high is because the Rideau Transit Group, the private consortium that built the line, has made a claim against the city after having its own insurance pitch rejected. There’s a much richer breakdown in Willing’s reports, but suffice to say the public has not seen these details until now.

The information was leaked to the Citizen just as the city filed official court documents — which would make its claims public information. But some city councillors are incensed that a reporter informed residents based on a confidential memo. So the finance and economic development committee promptly did what government bodies have done since time immemorial when awkward facts emerge: It moved to deflect public attention from the bigger issue by demanding an investigation into the source of the leaked memo.

One might have thought councillors would focus on asking questions the public wants answered, like: Why didn’t we know until now, five years later, what the overall costs could be? Or, what are the chances we’ll actually collect on the insurance? But no. Chaired by Mayor Jim Watson, the committee unanimously directed the city’s integrity commissioner to find out who leaked the memo. Coun. Eli El-Chantiry even suggested involving police. Council will be asked next week to approve this deflection tactic.

Doing so would be an absurd insult to open government. Particularly since one thing we know about Ottawa’s LRT is that its progress, from the start, has been marred by unconscionable secrecy.

For instance, the city routinely refused to share inspection (“non-conformance”) reports on various problems during LRT construction; only freedom of information requests, honoured months late, revealed concerns with concrete and with the wood used in LRT stations, plus the more alarming fact that the downtown tunnel wasn’t properly waterproofed and was expected to leak.

More infamously, city councillors weren’t given vital details about the contracts for LRT Stage 2 – including the low technical scores for the consortium that eventually won the bid — even as they were strong-armed to give approval. Our docile city council should have been grateful that the CBC reported that information from an anonymous source.

Secrecy is the refuge of weak leaders in our public institutions, and punishing “leakers” is meant to intimidate civil servants from serving the public good. We’ve seen this rubbish time and again, from probes of leaks in our police service, to sweeping investigations by the Department of National Defence (think of the Mark Norman prosecution).

In every case, the public, and the institution involved, would do better to focus on delving into the information revealed rather than searching for scapegoats.

Will city council work harder on open government? Not if we take the finance committee as an example. It held a long closed-door session before approving its internal witch-hunt in order to discuss — that’s right — the LRT.

https://ottawacitizen.com/opinion/editor...leak-is-meant-to-distract-and-intimidate
     
     
  #15034  
Old Posted May 26, 2021, 10:35 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
Council asks integrity commissioner to investigate journalist sources after LRT memo leak

Jon Willing, Ottawa Citizen
Publishing date: May 26, 2021 • 29 minutes ago • 2 minute read


A large majority of Ottawa’s city council on Wednesday asked the integrity commissioner to consider potentially spending thousands of dollars in taxpayer money to investigate journalist sources, bitter that LRT legal details were leaked to this newspaper and then provided to the public.

Robert Marleau, the integrity commissioner, said he would analyze the matter before deciding if it was worth an investigation, one that he estimated could cost $25,000-$35,000, or more if additional resources were required.

Council voted 18-6 in favour of requesting Marleau to open a code-of-conduct investigation into information leaked from a classified document.

Earlier this month, this newspaper was the first to report on a confidential memo to council and staff members about a lawsuit the city was filing against companies that provided an insurance policy on Stage 1 LRT construction.

It was the first time that the public received a true sense of how much money the 2016 Rideau Street sinkhole cost.

On top of learning about the city’s alleged $131 million in damages, which included the costs of delaying the LRT launch, the public also learned that builder Rideau Transit Group was claiming $230 million from the city.

Much of the information in the confidential memo later appeared in a publicly accessible statement of claim, but city solicitor David White said the memo revealed the city’s legal strategy.

The memo was co-authored by the city’s rail construction director, Michael Morgan, and a contracted lawyer working on the case.

Mayor Jim Watson said he didn’t have a problem with journalists doing their jobs, but he worried about the impact of sensitive information ending up in the public.

“It weakens our hand when we go to court,” Watson said.

Coun. Eli El-Chantiry, who came up with the motion asking the integrity commissioner to investigate, said he was worried about how much money the leak cost the city.

“Actions have consequences,” Coun. Keith Egli said. “That’s what this is about.”

But Coun. Shawn Menard said the city should instead be more transparent with how tax money was being spent, while Coun. Diane Deans viewed an integrity investigation into the leak as a “great big colossal waste of taxpayers’ time and money,” and Coun. Rick Chiarelli questioned using the integrity commissioner’s extraordinary powers to “intimidate media.”

Marleau said that, if he did take up the investigation, he would not investigate journalists.

Meanwhile, several senior staff who also received the memo are also under the microscope.

City manager Steve Kanellakos said he had directed the city’s chief information security officer to launch an internal investigation on staff to see if they were the source of the leak.

Voting in favour of requesting an integrity investigation were Watson and councillors El-Chantiry, Egli, Matthew Luloff, Allan Hubley, George Darouze, Jenna Sudds, Rawlson King, Scott Moffatt, Glen Gower, Riley Brockington, Jean Cloutier, Jan Harder, Tim Tierney, Laura Dudas, Carol Anne Meehan, Catherine Kitts and Mathieu Fleury.

Voting against were councillors Deans, Menard, Chiarelli, Jeff Leiper, Theresa Kavanagh and Catherine McKenney.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...e-journalist-sources-after-lrt-memo-leak
     
     
  #15035  
Old Posted May 31, 2021, 7:53 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
From the transit meeting on May 19. Shane from O-Train Fans asked about the coupler issue:

The issue with the couplers consisted of error codes stating there was an issue with the coupler. After investigation, it was found there was no issue with the coupler and the problem was due to wires rubbing, causing erroneous fault codes to alert the operator. Work has been done to improve the software so that only codes pertaining to the operator are displayed and taking measures to prevent damage or rubbing of the wiring. In the past months, there has not been any reoccurrence of the issue.

The seasonal work will have a direct impact on ride quality (such as vibration and noise). Some areas of the track are relatively smooth and quiet, while others such as the Hurdman curves are much louder and harsher. Areas such as these should see some level of improvement from the work that is planned.

For more info, listen to the end of the media availability on the website: https://www.railfans.ca/news/transit-commission-meeting-may-19-2021
     
     
  #15036  
Old Posted May 31, 2021, 8:59 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by J.OT13 View Post
From the transit meeting on May 19. Shane from O-Train Fans asked about the coupler issue:

The issue with the couplers consisted of error codes stating there was an issue with the coupler. After investigation, it was found there was no issue with the coupler and the problem was due to wires rubbing, causing erroneous fault codes to alert the operator. Work has been done to improve the software so that only codes pertaining to the operator are displayed and taking measures to prevent damage or rubbing of the wiring. In the past months, there has not been any reoccurrence of the issue.

The seasonal work will have a direct impact on ride quality (such as vibration and noise). Some areas of the track are relatively smooth and quiet, while others such as the Hurdman curves are much louder and harsher. Areas such as these should see some level of improvement from the work that is planned.

For more info, listen to the end of the media availability on the website: https://www.railfans.ca/news/transit-commission-meeting-may-19-2021
I'm happy they allowed Shane to participate in the media availability. Certainly more interesting questions (and answers) than the ones about the lawsuits (whose resolution will likely make zero difference to the day-to-day experience of a transit rider).
     
     
  #15037  
Old Posted May 31, 2021, 9:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
Agreed. The traditional media focus too much on the same stories. Great to have an advocate like Shane and O-Train Fans to get into details we would otherwise never hear about.
     
     
  #15038  
Old Posted May 31, 2021, 9:38 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
Agreed. The traditional media focus too much on the same stories. Great to have an advocate like Shane and O-Train Fans to get into details we would otherwise never hear about.
And who knows, maybe the media will report on the answers to some of Shane's questions, and eventually start to ask more intelligent questions themselves.
     
     
  #15039  
Old Posted Jun 9, 2021, 9:01 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,624
Coun. Tierney apologizes for 'inadvertent' leak to media of confidential memo
The confidential memo was concerning the 2016 Rideau Street sinkhole and legal matters related to it.

Aedan Helmer, Ottawa Citizen
Publishing date: Jun 09, 2021 • 8 minutes ago • 1 minute read


Council has cancelled the investigation into a leak to the media after one of its own members, Coun. Tim Tierney, admitted to an “inadvertent” breach of conduct when he emailed a confidential memo to a journalist.

The majority of council, including Tierney, had voted in favour of launching an integrity commissioner investigation into the source of the leak after a confidential memo concerning the 2016 Rideau Street sinkhole was divulged to an Ottawa Citizen reporter.

Tierney took “full responsibility” during Wednesday’s council session, saying he accidentally sent the memo — a May 10 document titled “Claim related to builders risk policy following the sinkhole event” — as part of a bundle of other unrelated documents.

“After council’s request to the integrity commissioner on the leak, which I supported, I discovered I had inadvertently included (the) confidential memo in a bundle of documents that I had sent to a journalist on an unrelated public issue,” Tierney explained to his council colleagues.

“I want council to understand that I take full responsibility, but I also want them to know that it was due to carelessness on my part, and it was not an intentional breach of council confidentiality.”

Tierney called the breach “a mistake made in good faith.”

“But I understand and am not making excuses whatsoever,” he said. “The fact remains, I sent the memo, and I breached the code of conduct for members of council. I can’t change what happened, but I can commit to you all I will be much, much more careful when emailing documents to others, and I’ll never breach council’s confidentiality requirements again.”

Mayor Jim Watson said Tierney’s apology has “effectively ended the matter and made the investigation by the IC redundant.”

Coun. Eli El-Chantiry, who brought the original motion calling for the integrity commissioner to intervene, introduced another motion Wednesday (which was swiftly carried) “that this matter has now been resolved, that this council accept the apology, and request the integrity commissioner cease investigation.”

[email protected]
Twitter.com/helmera

https://ottawacitizen.com/news/local-new...rtent-leak-to-media-of-confidential-memo
     
     
  #15040  
Old Posted Jun 9, 2021, 9:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,943
I wonder how Watson and El-Chantiry would have reacted had one of the non "Watson Club" members accidently leaked the memo.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.