Quote:
Originally Posted by swimmer_spe
That would be the most shortsighted thing I have heard. There is no reason with existing funding as well as what was announced in the budget that they cannot build the HfR from Toronto. Right now... there isn't a demand for rail in Alberta. So, using your own metrics, why build it?
|
There isn't any demand for rail in Alberta because other than the Canadian there is no service. Don't buy into government speak after they have made a system that is pathetic. Start with incremental improvements. As new sections of track are built passenger trains can be diverted on their own ROW. Here are a few of my suggestions:
1. Re-introduce 3 daily trains from Edmonton South to Calgary.
2. Fund expansion to run trains across the High Level bridge to the Grandin LRT station,
3. Build a separate ROW from the Edmonton South Station to YEG and reconnect to the CP tracks south of Leduc. This would avoid freight traffic in CP's rail yard in South Edmonton.
4. Re-build the rail line through downtown Red Deer for passenger trains only. This would allow for freight trains to pass on the existing route while passenger trains are stopped at Red Deer and provide a central station in the heart of the city.
5. Build a section of single line track on a separate ROW between Leduc and Red Deer.
6. Double track existing CP track from the bridge over the Bow River to a point where the new ROW would diverge from CP's track.
6. Build a section of single line track on a separate ROW between Red Deer and a location north of Calgary where the line would rejoin the CP track in order to gain access to the station in downtown Calgary.
7. After the whole new single track ROW is built the trackage could be double tracked in much smaller projects over time.
Some of these sections could be made into smaller projects if the new ROW is close enough to the existing CP ROW to allow for temporary connections to existing CP trackage.
I know a lot of people would say this is a fantasy plan but it is less of a fantasy than trying to build HSR or any new rail line from start to finish in one project. What is needed is a long term commitment from the federal government and the province to fund the project. The feds could build the track and the province could build any road overpasses to have a continuous grade separated route. We need to get serious about climate change and improving our rail service in this country.