Quote:
Originally Posted by passwordisnt123
If I remember from the alignment options document and consultation way back when, the major rationale for not choosing the Carling alignment was the engineering difficulties in managing the elevation change and "S" curves to take it from Bayview onto Carling.
|
That was a huge factor. That particular route would also have made Tunney's a lonely stump, along with everything south of Carling station. Every other route required extensive tunneling, 90 degree turns and an overall longer route.
Richmond-Byron was the shortest and simplest route, as well as the most direct.