Quote:
Originally Posted by Express691
|
While on page 44, the simulation shows that most of the extra corridors in network B does not warrant anything more than "frequent local bus". So where would the extra ridership come from if a rapid transit is built to serve on a corridor that projected to have less than 1000 pphpd?
I'd say only the corridor that's red or orange (> 2400pphpd) warrant any rail based rapid transit (SkyTrain or LRT) in the following order:
- All existing SkyTrain lines
- Broadway
- Fraser Highway
- Hastings
- North Shore (east of Lonsdale)
- 41st Ave
- PoCo Extension
- Willingdon
- Scott Road/Interurban (northern half)
- Lions Gate Bridge to Park Royal
- No. 3 Road extension
- Victoria (north of 41st)
The yellow lines is probably sufficient with BRT, RapidBus, B-Line, etc (1000-2400 pphpd), in no particular order:
- Marine (North Van)
- Lonsdale
- Hastings (east of Willingdon)
- Lougheed Highway to Maple Ridge (east of PoCo)
- Victoria/Knight to Richmond (south of 41st)
- Marine (Van/Burnaby)
- Steveston Highway
- King George to White Rock
- Scott Road/Interurban to Newton (southern half)
- 104th
- Trans-Canada Highway (Lougheed to Carvolth)
- 200th (Langley to Carvolth)
After all, the 99 B-Line carries about 3200 pphpd at peak hours if I remember correctly. Notice the vast majority of the corridor listed above are already served in Network A, with the exception of No. 3 Road and Steveston Highway.
All other corridor have projected ridership of less than 1000pphpd for the entire length, some are far less. I don't think the riders would just mysteriously come if they just throw a train at those corridors.