Looking at the diagram of the library parcel and these renderings, it makes no sense to me why the library wasn't built right at Booth Street and connected to Pimisi Station.
Reply With Quote
     
     
  #1142  
Old Posted Apr 23, 2021, 2:07 AM
SL123 SL123 is online now
Registered User
 
Join Date: Mar 2021
Posts: 1,967
Quote:
Originally Posted by kevinbottawa View Post
Looking at the diagram of the library parcel and these renderings, it makes no sense to me why the library wasn't built right at Booth Street and connected to Pimisi Station.
Since its a joint facility with LAC, the direct link of commissioner street to their main building and parking lot could have something to do with it. Just a guess.
Reply With Quote
     
     
  #1143  
Old Posted Apr 23, 2021, 4:59 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
Unhappy

Quote:
Originally Posted by SL123 View Post
Since its a joint facility with LAC, the direct link of commissioner street to their main building and parking lot could have something to do with it. Just a guess.
That's entirely possible. Early on when they were discussing a possible partnership, the LAC vaguely requested a site close to their current HQ, and that might have been what they meant.

Other possible reasoning might have been views and visibility. Had the site next to Pimisi been chosen, views towards the River from the Library and of the Library from Wellington would have been blocked by Claridge Land. The parkland between the escarpment and the Claridge buildings offers that window.

My biggest complaint is that the NCC did not specifically place a condition on the LeBreton library parcel for a direct indoor connection from Pimisi, through the proposed development, to the Library itself, in order to improve accessibility Hopefully, the private sector consortia will offer this voluntarily.
Reply With Quote
     
     
  #1144  
Old Posted Apr 23, 2021, 5:02 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
Quote:
Originally Posted by rocketphish View Post




















Thanks fo r posting these!
Reply With Quote
     
     
  #1145  
Old Posted Apr 23, 2021, 1:42 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,650
Quote:
Originally Posted by SL123 View Post
Since its a joint facility with LAC, the direct link of commissioner street to their main building and parking lot could have something to do with it. Just a guess.
But, unfortunately, I still think that the chance of running a steam-pipe under Commissioner, from the re-built Heating Plant to the new Library, is about ZERO.
Reply With Quote
     
     
  #1146  
Old Posted Apr 23, 2021, 6:34 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,061
Quote:
Originally Posted by Richard Eade View Post
But, unfortunately, I still think that the chance of running a steam-pipe under Commissioner, from the re-built Heating Plant to the new Library, is about ZERO.
The library is being built to Net Zero standards. Would it need that?

Quote:
In its Economic Update published earlier this week, the Government of Canada announced that it will support sustainability enhancements for a net zero carbon joint facility that will house Library and Archives Canada and the Ottawa Public Library.

The Government will be investing an additional $34.5 million in the project, most notably on significant enhancements to the facility such as upgrades to the building’s exterior and insulation, triple-glazed windows, solar panels on the building rooftop and embedded in the building facade, more sustainable building materials, and an indoor green wall.
https://www.bac-lac.gc.ca/eng/news/Pages/2020/LAC-OPL-Joint-Facility-GC-funding.aspx
Reply With Quote
     
     
  #1147  
Old Posted Apr 23, 2021, 6:51 PM
phil235's Avatar
phil235 phil235 is offline
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,598
Quote:
Originally Posted by kevinbottawa View Post
Looking at the diagram of the library parcel and these renderings, it makes no sense to me why the library wasn't built right at Booth Street and connected to Pimisi Station.
I think that it is the elevations and the prominence of the site. If it was down at the station, it wouldn't be as visible. Right now it also provides a link between downtown and Lebreton. Proximity to West Centretown was also a consideration, as it was intended to serve the downtown population. There was a lot of concern expressed that even the current site is too far west of the core.
Reply With Quote
     
     
  #1148  
Old Posted Apr 23, 2021, 11:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
Quote:
Originally Posted by Richard Eade View Post
But, unfortunately, I still think that the chance of running a steam-pipe under Commissioner, from the re-built Heating Plant to the new Library, is about ZERO.
They mentioned during the question period after the presentation that it's "expected to be tied into" the district energy.
Reply With Quote
     
     
  #1149  
Old Posted Apr 24, 2021, 12:10 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by phil235 View Post
I think that it is the elevations and the prominence of the site. If it was down at the station, it wouldn't be as visible. Right now it also provides a link between downtown and Lebreton. Proximity to West Centretown was also a consideration, as it was intended to serve the downtown population. There was a lot of concern expressed that even the current site is too far west of the core.
Oh yes. I remember the conversations about needing to serve the downtown population. Now looking at how big the library is and how close it is to Booth and Albert, is the Booth site that much further west than the Commissioner Street site? With either site, somebody has to walk, whether it's CBD residents walking to Booth Street or people walking from the station to the Commissioner Street site. When it comes to views and the prominence of the site, accessibility and convenience for users should be a greater priority. Anyway, this ship has sailed. Just doesn't make sense to me.
Reply With Quote
     
     
  #1150  
Old Posted Apr 24, 2021, 12:08 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
I still wish they went with a less traditional firm like Mecanoo or Schmidt Hammer Lassen, but regardless it's a great looking building.
Reply With Quote
     
           
     
  #1152  
Old Posted Apr 30, 2021, 5:41 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
Incredible shots Harley. Thanks for sharing!
Reply With Quote
     
     
  #1153  
Old Posted Apr 30, 2021, 8:54 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Anybody know what the small angular white building with the green roof is? Maintenance depot of some sort?
Reply With Quote
     
     
  #1154  
Old Posted Apr 30, 2021, 9:07 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
Quote:
Originally Posted by rocketphish View Post
Anybody know what the small angular white building with the green roof is? Maintenance depot of some sort?
Combined sewage storage tunnel access/ventilation. They went all out to make that look good, but then we have the basic grey traction power substation shed next door. Hope they can clean up that whole area as part of the nearby library parcel redevelopment.
Reply With Quote
     
     
  #1155  
Old Posted Apr 30, 2021, 11:11 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Man, the west entry into downtown is ugly.
Reply With Quote
     
     
  #1156  
Old Posted May 1, 2021, 5:43 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,637
Quote:
Originally Posted by lrt's friend View Post
Man, the west entry into downtown is ugly.
Well let's hope the dozen or so projects in this area improves that approach.

On an unrelated note, can someone remind these library guys how close the LRT is to their digging?!? Any damage to that tunnel would spell disaster.
Reply With Quote
     
     
  #1157  
Old Posted May 17, 2021, 9:00 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Competition for 'super library' construction contract begins
The city said the tender will close in the summer, with construction beginning in the fall.

Jon Willing, Ottawa Citizen
Publishing date: May 17, 2021 • 1 minute ago • 1 minute read




Construction bids opened Monday for the super library on LeBreton Flats after the City of Ottawa released the final drawings with hopes of meeting the pre-tender estimate of $192.9 million.

The contract competition is for pre-qualified general contractors identified last summer: EllisDon, PCL and Pomerleau.

The city said the tender will close in the summer, with construction beginning in the fall.

The launch of the request for proposals meant the final design by Diamond Schmitt Architects and KWC Architects was ready for construction bids.

The facility at 555 Albert St. on LeBreton Flats is a joint project between the Ottawa Public Library and Library and Archives Canada.

The city is releasing the tender under difficult market conditions for construction material. The Ottawa Construction Association sent a special warning to buyers in the winter about the escalating prices.

Statistics Canada’s construction price index for non-residential buildings in the first quarter of 2021 indicated that, out of 11 census metropolitan areas, Ottawa was third when it came to the highest increases compared to the same period in 2020.

The super library project calls for a net-zero carbon facility.

The building has been scheduled to open in late 2024.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...per-library-construction-contract-begins
Reply With Quote
     
     
  #1158  
Old Posted May 18, 2021, 11:58 AM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,631
Quote:
Originally Posted by AuxTown View Post
Well let's hope the dozen or so projects in this area improves that approach.

On an unrelated note, can someone remind these library guys how close the LRT is to their digging?!? Any damage to that tunnel would spell disaster.
I guess they could take a page out of RTG's book?
Reply With Quote
     
     
  #1159  
Old Posted May 31, 2021, 7:47 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
May 17, 2021

RELEASE OF MAIN TENDER FOR THE CONSTRUCTION AND FINAL DESIGN DRAWINGS

Ottawa (Public Service Announcement) – The City of Ottawa Supply Services has released the main construction tender to the pre-qualified General Contractors for the construction of the Ottawa Public Library-Library and Archives Canada Joint Facility.

The tender is scheduled to close this summer with construction work to begin this fall.

The release of the main construction tender coincides with another project milestone, the completion of the final design of the joint facility. The designs plans were endorsed by the Ottawa Public Library (OPL) Board and approved by the National Capital Commission Public Board of Directors in April 2021. The design is the direct result of an unprecedented public co-design process that asked Ottawa residents, Indigenous communities, and Canadians from across the country to provide design input and inspiration at every stage.

This engagement process helped shape all aspects of the facility, inside and out. Public input informed the shape of the building, its entrances, the interaction and location of its spaces, the indoor look and ambience, the inclusive and sustainable features, the landscaping and public art, and the exterior materials. There were also significant design enhancements made by Diamond Schmitt Architects, in joint venture with KWC Architects, to achieve net-zero carbon.

One of the most important aspects of this process was the generosity and engagement of Indigenous peoples in Ottawa and across the country, including the Anishnābe Algonquin First Nations of Kitigan Zibi and Pikwakanagan, the Ottawa-Gatineau urban Indigenous community and First Nations, Inuit, and Métis Nation individuals from across the country. Their direction, advice, and feedback has been instrumental in shaping the design of the new facility.

Public and Indigenous engagement for the facility will continue as the project partners move forward with the next stages of the project. gallery of the final design drawings and additional information on the project can be found at inspire555.ca.

Background

Ottawa Public Library and Library and Archives Canada (LAC) have partnered to develop a new joint facility that will house OPL’s new Central Library and LAC’s public programs and services in the National Capital Region. The story of this ground-breaking project is about two major public institutions coming together to build a place where Ottawa residents, Canadians and visitors from around the world will come together to connect to learn, discover, and create.

Ottawa Public Library

Ottawa Public Library is the largest bilingual (English/French) public library system in North America. The OPL extends public access to information and services through the library’s 34 branches, physical and virtual (BiblioOttawaLibrary.ca), as well as two mobile libraries and a vending machine-style lending library service. Serving close to one million Ottawa residents, OPL’s mission is to inspire learning, spark curiosity, and connect people.

Library and Archives Canada

As the custodian of our distant past and recent history, Library and Archives Canada is a key resource for all Canadians who wish to gain a better understanding of who they are, individually and collectively. LAC acquires, processes, preserves and provides access to our documentary heritage and serves as the continuing memory of the Government of Canada and its institutions.

For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-2401). You can also connect with us through Facebook, Twitter and Instagram.

Media resources:

Downloadable images (link is external)

https://inspire555.ca/updates/release-of...-construction-and-final-design-drawings/
Reply With Quote
     
     
  #1160  
Old Posted May 31, 2021, 7:50 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,032
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 7:51 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.